# High Speed Rail (London - West Midlands) Act 2017, Paragraph


The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table.
Area
Number of land shown on deposited plans
Purpose for which land may be acquired or used
London Borough of Camden
4, 13, 79a, 99
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
68, 69, 93, 162, 163, 236, 369, 401 to 411, 508, 522, 665, 704, 721, 724, 727, 750, 791, 792, 794 to 796, 801 to 805, 807 to 811, 901, 912, 978, 1017, 1051
Diversion or installation of, or works to, utilities apparatus
78, 110, 816, 817, 819, 820, 822, 829, 834, 847, 848, 849, 852, 854, 855, 856, AP3-22
Provision of worksite and access for construction
140a, 142
Provision of worksite and access for construction
Diversion or installation of, or works to utilities apparatus
Installation of ground anchors
90, 151 to 154, 157, 159, 177, 180, 181
Installation of ground anchors
363
Provision of electricity supply system and access
434
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
AP3-5
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
London Borough of Brent
28, 29, 48, 50, 55, 58, 78, 87, 185, 374, AP4-13 to AP4-15
Diversion or installation of, or works to, utilities apparatus
53a, 54a, AP4-6, AP4-10
Provision of worksite and access for construction
Royal Borough of Kensington & Chelsea
1 to 3
Provision of worksite and access for construction
Provision and renewal of railway systems for operational purposes and drainage
16, 19
Diversion or installation of, or works to, utilities apparatus
London Borough of Hammersmith & Fulham
5, 6, 50c, 67, AP4-3, AP4-7, AP4-9 to AP4-11
Provision of worksite and access for construction
12, 13, 21a, 22c, 22e, 28, 29, 37, 48, 50a, 50b, 63, 66, 71, 73, 75, 76
Diversion or installation of, or works to, utilities apparatus
77
Provision of environmental mitigation
AP4-1
Provision of worksite and access for construction and maintenance
London Borough of Ealing
5, 7, 8, 9, 12, 13, 29, 30, 118a, 120a, 124a, 124b, 132, 156, 223, 229, 233, 265, 562, 787a, 788 to 790, 946 to 949
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
20, 21, 35, 36, 40, 41, 44, 45, 48, 49, 52, 53, 56, 57, 60, 61, 64, 65, 68, 69, 72, 73, 76, 77, 80, 81, 84, 125a, 125b, 126, 127a, 127b, 142 to 144, 145a, 152 to 154, 155a, 155b, 190, 193, 194, 196, 200, 202, 204 to 206, 209, 214, 216 to 219, 221, 222, 228, 231, 232, 235, 237, 240, 242, 251, 254 to 257, 259, 267, 269, 271, 272, 274, 277, 282 to 289, 438, 439, AP2-13, AP2-15, AP2-17, AP2-21, AP4-8, AP4-10, AP4-16, AP4-17
Provision of worksite and access for construction
103, 106
Provision of worksite and access for construction
Provision and renewal of railway systems for operational purposes and drainage
Diversion or installation of, or works to, utilities apparatus
119, 121, 150, 151, 157, 158, 165
Provision of worksite and access for construction
Reinstatement of businesses or facilities
Diversion or installation of, or works to, utilities apparatus
133 to 139, 295, 297, 298, 314, 315, 322 to 324, 396, 406, 408, 445, 456 to 461, 471, 579, 580, 716, 770, 771, 798, 799, 805 to 807, 842 to 844, 849, 867, 898, 922, 925, 926, 942, 944, 945, 957 to 964, 973 to 975, 977, 985, 987, AP2-25, AP2-26
Diversion or installation of, or works to, utilities apparatus
213
Provision and renewal of railway systems for operational purposes and drainage
454
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
AP4-1
Reinstatement of businesses or facilities
London Borough of Hillingdon
1 to 16, 26 to 28, 39, 40, 68, 84, 85, 106, 107, 128 to 139, 175, 176, 190, 202, 203, 219, 224, 229 to 239, 371, 384, 387, 390, 447, 449, 452, 454, 463a, 464a, 476, 477, 478a, 492a, 522, 523, 523a, AP5-1b, AP5-2 to AP5-14
Diversion or installation of, or works to, utilities apparatus
25, 441, 442, 458, 459, 469, 471, 483a, 484, 485, 494 to 496, 537, AP4-20, AP4-25, AP4-27 to AP4-29, AP4-33 to AP4-39
Provision of environmental mitigation
25a, 470, 494b
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
50, 51
Provision of access for construction and maintenance of utility diversions
101 to 103, 420, 422, 423, 426, 427 to 429, 466a, 467, 482, 487, 488, 502, 504, 506, AP4-12, AP4-13, AP4-15, AP4-16
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
377, 379, 411, 414, 415, 535
Provision of worksite and access for construction
412, 413, 416 to 419, AP4-26
Provision of worksite and access for construction and maintenance
424, 425, 460, 536, 540, AP4-17 to AP4-19
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
465a, 511
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
474
Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
496a, 498, 499, 526 to 534
Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
Diversion and installation of overhead electric lines
501, 507
Diversion and installation of overhead electric lines
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
510, AP4-21
Provision of worksite and access for construction
Provision of environmental mitigation
545
Diversion and installation of overhead electric lines
Provision of worksite and access for construction and maintenance
548, 550, 556 to 558, 563, AP2-1
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
562
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
564, 590b, AP2-3, AP2-4
Diversion and installation of overhead electric lines
606, 614, 615, 618
Provision of worksite and access for construction and maintenance
Provision and renewal of railway systems for operational purposes and drainage
Provision of new public right of way
Diversion and installation of overhead electric lines
Diversion or installation of, or works to, utilities apparatus
611, 613
Provision of worksite and access for construction and maintenance
Provision and renewal of railway systems for operational purposes and drainage
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
612
Provision of worksite and access for construction and maintenance
Provision and renewal of railway systems for operational purposes and drainage
Diversion or installation of, or works to, utilities apparatus
616
Provision of worksite and access for construction and maintenance
Provision and renewal of railway systems for operational purposes and drainage
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
496, 654, 655
Provision of environmental mitigation
Provision of flood mitigation measures
496a, 498
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
557, 560, 561, 570 to 580, 583, 584, 588, 590, 591, 593, 594, 707, 714, 719, 720c
Diversion and installation of overhead electric lines
558
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
565
Diversion and installation of overhead electric lines
Provision of electricity supply system and access
566 to 568
Provision of access for construction and maintenance of utility diversions
Provision of electricity supply system and access
603, 604, 643 to 645, 657 to 659, 665, 683, 693, 694, 698a, 720d, 723, 724, 728, 729, 736, 737, 739, 741, 742, 748, 749, 753, 767, 768, 770, 784, 786, 787, 789
Provision of environmental mitigation
621
Provision of balancing pond and associated works and access for maintenance
Provision of electricity supply system and access
Provision of new public right of way
622, 624, 625, 627, 628, 630 to 632, 636, 666, 669, 671, 738
Diversion or installation of, or works to, utilities apparatus
633, 676, 677, 679, 697, 741a, 747, 747a, 747b, 747d, 756, 756a, 761, 762a, 763 to 765, 771, 772, 774 to 778, 780 to 783
Provision of worksite and access for construction and maintenance
642, 758
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
663, 672
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
692
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Provision of electricity supply system and access
Provision of flood mitigation measures
Provision of new public right of way
Diversion and installation of overhead electric lines
726, 731, 734, 740, 745, 746
Provision of worksite and access for construction
751, 755
Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
759
Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
AP2-5, AP2-6
Provision of access for construction and maintenance
AP4-40 to AP4-42
Reinstatement of businesses or facilities
County of Buckinghamshire, District of South Bucks,Parish of Iver
AP2-1, AP2-3
Provision and renewal of railway systems for operational purposes and drainage
AP2-9 to AP2-11, AP2-14, AP2-15
Provision of worksite and access for construction
Borough of Slough
AP2-3, AP2-5, AP2-6, AP2-14, AP2-21, AP2-25, AP2-30, AP2-33, AP2-34
Provision of worksite and access for construction
AP2-12, AP2-26
Provision and renewal of railway systems for operational purposes and drainage
AP2-13, AP2-20
Provision of worksite and access for construction
Provision and renewal of railway systems for operational purposes and drainage
AP2-17, AP2-22, AP2-23, AP2-28
Provision of worksite and access for construction
Provision of flood mitigation measures
AP2-35
Provision of access for construction and maintenance of utility diversions
AP2-37
Diversion or installation of, or works to, utilities apparatus
County of Buckinghamshire District of South Bucks Parish of Denham
1, 2
Provision of flood mitigation measures
1d, 1f
Diversion and installation of overhead electric lines
11, 17, 19, 32
Provision of environmental mitigation
25, 26, 28 to 31, 33, 46, 52
Provision of worksite and access for construction
14, 15, 23, 27
Provision of balancing pond and associated works and access for maintenance
26
Provision of worksite and access for construction
34
Provision of environmental mitigation
Provision of worksite and access for construction
42, 43
Diversion or installation of, or works to, utilities apparatus
37 to 39, 47 to 49, AP2-3
Provision of access for construction and maintenance
AP4-1, AP4-2, AP4-4 to AP4-9
Provision of worksite and access for construction
Provision of drainage and associated works
Parish of Wexham
AP4-1
Provision of environmental mitigation
County of Hertfordshire District of Three Rivers
5
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
7, 13, 15, 17, 19, 21, 22, 24, 25, 27, 31, 38, 41, 44, 48, 54, 58, 65, 69, 104
Provision of worksite and access for construction
12
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
23, 53, 80
Provision of balancing pond and associated works and access for maintenance
32, 36, 37
Provision of worksite and access for construction
Provision of drainage and associated works
40, 46, 61, 63, 64
Provision of drainage and associated works
49, 55, 80a, 84, 94, 97, 120, AP4-1 to AP4-17
Provision of environmental mitigation
75
Provision of environmental mitigation
Provision of worksite and access for construction
107, 109
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of electricity supply system and access
Diversion and installation of overhead electric lines
116
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
10
Diversion or installation of, or works to, utilities apparatus
AP4-18
Reinstatement of businesses or facilities
County of Buckinghamshire District of Chiltern Parish of Chalfont St Peter
1, 7, 21, 30, 31, 35
Provision of worksite and access for construction
16
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
19
Diversion and installation of overhead electric lines
70, 75, 76, 83, 85
Provision of environmental mitigation
Parish of Chalfont St Giles
4 to 6
Provision of environmental mitigation
131
Provision of worksite and access for construction
134, 135, 139, 141, 142, 147
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Parish of Amersham
7, 22, 24, 28, 34, 37
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
10
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
27
Diversion or installation of, or works to, utilities apparatus
31
Provision of environmental mitigation
Provision of worksite and access for construction
59, 66, 67, 74, 76, 77
Provision of protective works to watercourse
Parish of Coleshill
4
Provision of environmental mitigation
8
Diversion or installation of, or works to, utilities apparatus
Parish of Little Missenden
2 to 4
Provision of protective works to watercourse
11, 16
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
14
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
15, 17, 19, 20
Diversion or installation of, or works to, utilities apparatus
AP2-2, AP2-3
Provision of new public right of way
Parish of Great Missenden
142, 158, 174, 178, AP4-55, AP4-56
Provision of environmental mitigation
135 to 137
Provision of drainage and associated works
155, 184
Provision of environmental mitigation
Provision of drainage and associated works
AP4-80, AP4-81
Provision of environmental mitigation
Provision of new public right of way
170, 171
Provision of environmental mitigation
Provision of worksite and access for construction
AP4-31, AP4-38, AP4-41, AP4-41a, AP4-42 to AP4-44, AP4-47a, AP4-48, AP4-49, AP4-59, AP4-73, AP4-74
Diversion and installation of overhead electric lines
173, 179, 188, 189
Diversion or installation of, or works to, utilities apparatus
112, 117
Provision of environmental mitigation
Diversion and installation of overhead electric lines
Diversion or installation of, or works to, utilities apparatus
157, 159 to 161, 163, 167, AP4-15
Provision of worksite and access for construction
128, 139
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
138, 147
Diversion and installation of overhead electric lines
166
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
162a, 162b
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
180, AP4-51, AP4-52, AP4-75
Provision of environmental mitigation
Diversion and installation of overhead electric lines
AP2-2
Provision of balancing pond and associated works and access for maintenance
AP4-54, AP4-78
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
AP4-57
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
Provision of new public right of way
AP4-58, AP4-69, AP4-70
Provision of worksite and access for construction and maintenance
Provision of drainage and associated works
AP4-65
Provision of balancing pond and associated works and access for maintenance
AP4-67
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
AP4-68
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
Parish of The Lee
2, 42 to 45
Provision of environmental mitigation
5, 22, 24, 28, 34
Reprofiling of ground
8, 9, 26
Provision of worksite and access for construction
Reprofiling of ground
11, 12, 18, 19, 31
Provision of environmental mitigation
Diversion and installation of overhead electric lines
16
Diversion and installation of overhead electric lines
27
Provision of environmental mitigation
Reprofiling of ground
Diversion or installation of, or works to, utilities apparatus
32
Provision of environmental mitigation
Reprofiling of ground
36
Reprofiling of ground
Provision of worksite and access for construction and maintenance
39, 40
Provision of environmental mitigation
Provision of worksite and access for construction
AP2-1
Provision of access for construction
District of Aylesbury Vale Parish of Wendover
1, 3, 14, 48, 150, 153, 233
Provision of environmental mitigation
Diversion and installation of overhead electric lines
5, 8, 15, 19, 59, 66 to 71, 74, 76 to 78, 80, 81, 123, 143, 147, 220
Provision of drainage and associated works
7, 251a
Provision of environmental mitigation
Provision of drainage and associated works
9, 11, 23, 25, 50, 57, 65, 97, 98, 127, 129, 132, 146, 222, 232, 236, 238, 239, 243, 248, 250a, 257
Provision of environmental mitigation
18, 42, 45, 46, 60, 120, 126, 149, 151, 182, 187, 190, 192, 224
Provision of worksite and access for construction
24
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
29
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
31
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Provision of drainage and associated works
32, 58, 108, 109, 142, 212, 214, 223, 241
Diversion and installation of overhead electric lines
34, 55, 94, 124, 204
Provision of environmental mitigation
Diversion and installation of overhead electric lines
Provision of worksite and access for construction
35, 169, 172, 185, 205, 206
Diversion or installation of, or works to, utilities apparatus
38 to 41, 52, 96, 103, 110, 111
Provision of environmental mitigation
Provision of worksite and access for construction
47, 56, 62, 63, 165, 211, 235
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
54
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
61, 221
Provision of worksite and access for construction
Provision of drainage and associated works
64
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of drainage and associated works
91, 213, 215
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
95
Provision of worksite and access for construction and maintenance
100
Provision of environmental mitigation
Provision of drainage and associated works
Diversion and installation of overhead electric lines
135, 136
Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead electric lines
156, 159, 217
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
171
Provision of worksite and access for construction
Provision of new public right of way
173
Installation of ground anchors
203
Provision of worksite and access for construction
Provision of new public right of way
Diversion and installation of overhead electric lines
219
Provision of worksite and access for construction
Provision of environmental mitigation
Provision of drainage and associated works
Diversion and installation of overhead electric lines
230
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
AP1-11
Provision of environmental mitigation
Provision of worksite and access for construction and provision of balancing pond and associated works
Access for maintenance
AP2-1
Provision of balancing pond and associated works and access for maintenance
AP2-3a
Minor highway alterations
AP2-4
Reinstatement of businesses or facilities
District of Wycombe Parish of Ellesborough
2
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
4, 15, 74
Provision of worksite and access for construction
5
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
10
Provision of environmental mitigation
Provision of drainage and associated works
13, 17, 32, 33
Diversion or installation of, or works to, utilities apparatus
34, 44, 66, 70
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
22, 23, 30, 35, 36, 38, 41, 47, 48, AP2-1, AP2-2
Provision of environmental mitigation
50, 51, 54 to 57
Provision of flood mitigation measures
52
Provision of worksite and access for construction and maintenance
53, 61 to 64, 71, 72
Provision of drainage and associated works
69, 80
Diversion and installation of overhead electric lines
11, 12
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
AP4-1
Provision of environmental mitigation
Provision of worksite and access for construction
District of Aylesbury Vale Parish of Stoke Mandeville
4, 21, 23, 26, 33, 34, 38, 81, 90, 100 to 102, 108, 112, 155, 157, 158, 161
Provision of environmental mitigation
6, 69, 113
Provision of worksite and access for construction and maintenance
8, 9, 94, 95, 120
Provision of flood mitigation measures
10
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
18
Provision of worksite and access for construction and maintenance
Provision of new public right of way
22, 48, 56, 122, 132, 144
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
24, 59, 63, 116, 149, 151
Provision of worksite and access for construction
25, 72, 75, 76, 78 to 80, 87, 88, 91, 98, 109, 117, 138, 141
Diversion or installation of, or works to, utilities apparatus
28
Provision of balancing pond and associated works and access for maintenance
43, 84, 103, 129
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
61
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
62
Provision of drainage and associated works
74, 92, 93, 152
Provision of drainage and associated works
Provision of environmental mitigation
83, AP2-2
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
118
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
119
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
123, 131, 134, AP1-3, AP1-4, 150
Provision of environmental mitigation
Provision of worksite and access for construction
126
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
146
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
District of Wycombe Parish of Great and Little Kimble cum Marsh
1
Provision of drainage and associated works
3, 7, 9
Provision of worksite and access for construction
District of Aylesbury Parish of Stone with Bishopstone and Hartwell
6, 65, 86
Diversion or installation of, or works to, utilities apparatus
17, 18, 23, 32
Provision of environmental mitigation
Diversion and installation of overhead electric lines
27, 29, 30, 37, 69, 79, 81
Provision of environmental mitigation
28, 28b
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
33
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
Provision of worksite and access for construction
35
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
36
Provision of environmental mitigation
Provision of access for construction and maintenance
39
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
Provision of access for construction and maintenance
40
Provision of worksite and access for construction and maintenance
44, 46, 53, 57, 59
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
45
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
47
Provision of worksite and access for construction
Provision of a turning head
48, 85, 90
Provision of worksite and access for construction
51, 55
Provision of worksite and access for construction
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
60
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of a turning head
61, 72
Provision of environmental mitigation
Provision of worksite and access for construction
66a, 66b, 71b, 73b
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
Provision of drainage and associated works
Provision of flood mitigation measures
74a, 75, 89
Provision of flood mitigation measures
76a
Provision of environmental mitigation
Provision of drainage and associated works
87
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
88
Provision of flood mitigation measures
Provision of drainage and associated works
AP4-2
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
Parish of Aylesbury
1
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
6, 18
Provision of environmental mitigation
Diversion and installation of overhead electric lines
20 to 22, 24
Provision of environmental mitigation
Parish of Coldharbour
2 to 7, 10, 11
Provision of environmental mitigation
Parish of Fleet Marston
4
Provision of worksite and access for construction and maintenance
5, 11
Provision of environmental mitigation
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
6, 7
Diversion or installation of, or works to, utilities apparatus
8, 9
Provision of flood mitigation measures
10
Provision of worksite and access for construction
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
13, 26
Provision of environmental mitigation
14, 18, 30
Provision of drainage and associated works
15, 21
Provision of worksite and access for construction
16, 19
Provision of environmental mitigation
Provision of new public right of way
20
Provision of environmental mitigation
Provision of worksite and access for construction
23
Provision of worksite and access for construction
Provision of drainage and associated works
25
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
12b
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Parish of Waddesdon
1, 16
Provision of flood mitigation measures
2, 73, 79
Provision of environmental mitigation
Provision of new public right of way
3, 32, 45, 107, 128, 129
Provision of drainage and associated works
6
Provision of environmental mitigation
Provision of drainage and associated works
Provision of new public right of way
7, 9, 113, 120, 126, 127
Provision of environmental mitigation
Provision of worksite and access for construction
8, 10, 11, 13, 34, 36, 41, 42, 49, 51, 53, 59, 60, 67, 69, 74, 76, 81 to 83, 85, 100, 103
Provision of environmental mitigation
17, 46, 52, 56, 66, 72, 78, 84, 106, 114
Provision of worksite and access for construction
18
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of electricity supply system and access
31, 54, 109, 112
Provision of worksite and access for construction and maintenance
33, 40, 58
Provision of balancing pond and associated works and access for maintenance
68, 93, 110, 111
Diversion or installation of, or works to, utilities apparatus
91
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
94
Provision of new public right of way
97
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
105
Provision of drainage and associated works
Provision of worksite and access for construction and maintenance
123
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of flood mitigation measures
Parish of Quainton
3, 35, 61, 66
Provision of environmental mitigation
Provision of flood mitigation measures
8, 23, 59, 74, 88, 115, AP2-5, AP2-14, AP2-15, AP4-1, AP4-2
Provision of balancing pond and associated works and access for maintenance
9, 12, 14, 24, 92, 98 to 100, 133, 138, 142, 177, 182, 191, 194, 199, 203, 216, 218, 248 to 250
Provision of worksite and access for construction
11, 20, 27, 53, 56, 58, 62, 64, 65, 122, 125, 128, 141, 195a, 206a, 222, 223, 225, 226, 232, 240, 253, 270, 271, 273a, AP1-23, AP1-24
Provision of environmental mitigation
17, 75, 127, 210, 212
Diversion or installation of, or works to, utilities apparatus
19
Provision of worksite and access for construction
Removal of utility apparatus
21
Provision of environmental mitigation
Provision of worksite and access for construction
Removal of utility apparatus
31
Provision of balancing pond and associated works and access for maintenance
Removal of utility apparatus
32, 50, 68, 151, 219, 220, 224
Provision of flood mitigation measures
33, 72
Provision of worksite and access for construction and maintenance
87
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
54, 71, 89, 104, 110, 113, 118b, 118d, AP1-5, AP1-16 to AP1-20
Provision of environmental mitigation
Provision of worksite and access for construction
38
Provision of environmental mitigation
Provision of diversion or installation of, or works to, utilities apparatus
40
Provision of environmental mitigation
Provision of drainage and associated works
46, 107, 109, 131, 146, 149, 159, 197, 244, AP2-3, AP2-4, AP2-10
Provision of drainage and associated works
47
Provision of a turning head
Provision of environmental mitigation
49
Provision of a turning head
Diversion or installation of, or works to, utilities apparatus
93
Provision of balancing pond and associated works and access for maintenance
Provision of flood mitigation measures
118c, 176
Provision of environmental mitigation
Diversion and installation of overhead electric lines
124
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
135, 150, 155, 157, 158, 161, 164, 168, 170, 184a, 233
Diversion and installation of overhead electric lines
136a
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of new public right of way
Provision of electricity supply system and access
143
Diversion and installation of overhead electric lines
Provision of access for construction and maintenance
160
Provision of access for construction and maintenance
166
Provision of electricity supply system and access
173
Provision of environmental mitigation
Diversion and installation of overhead electric lines
Provision of drainage and associated works
174, 175
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
204
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of flood mitigation measures
206b, 207a
Provision of environmental mitigation
Provision of electricity supply system and access
243
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
251
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
AP2-6, AP2-7 to AP2-9
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
Parish of Grendon Underwood
3, 5, 10, 28, 30
Provision of environmental mitigation
20, 23, 26
Provision of worksite and access for construction
4
Provision of environmental mitigation
Provision of drainage and associated works
21 and 24
Provision of environmental mitigation
Provision of worksite and access for construction
12a
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
AP2-6
Provision of worksite and access for construction and maintenance
Provision of new public right of way
16a
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Provision of new public right of way
29
Provision of balancing pond and associated works and access for maintenance
AP1-1, AP1-5, AP1-6, AP1-9
Diversion and installation of overhead electric lines
Parish of Middle Claydon
1, 2
Provision of environmental mitigation
Parish of East Claydon
4, 4a, 5, 7
Diversion and installation of overhead electric lines
Parish of Calvert Green
1, 9, 11
Provision of environmental mitigation
2
Provision of environmental mitigation
Provision of new public right of way
AP2-1
Provision of new public right of way
6
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of flood mitigation measures
Provision of new public right of way
8
Provision of flood mitigation measures
23
Diversion or installation of, or works to, utilities apparatus
24
Diversion or installation of, or works to, utilities apparatus
Provision of access for construction and maintenance
25
Provision of worksite and access for construction
18a
Provision of access for construction and maintenance
Provision of new public right of way
AP4-2
Provision of access for construction
AP4-6
Provision of balancing pond and associated works and access for maintenance
Parish of Steeple Claydon
3, 4, 6, 78, 80, 110, 111, AP1-1, AP4-1, AP4-4
Provision of environmental mitigation
24, 26a, 27, 31, 33, 97
Provision of worksite and access for construction
72
Provision of environmental mitigation
Provision of access for construction and maintenance
9c, 9d
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of access for construction and maintenance
9a, 100, 117, 119, 120
Diversion or installation of, or works to, utilities apparatus
21
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
52a, 76
Provision of environmental mitigation
Provision of worksite and access for construction
51a
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
75
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
98, 99, 112
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
109
Provision of flood mitigation measures
124, 125
Provision of drainage and associated works
69, 71
Provision of new public right of way
102, 103, AP1-8, AP2-1 to AP2-4
Provision of worksite and access for construction and maintenance
Parish of Charndon
2, 3
Diversion or installation of, or works to, utilities apparatus
Parish of Twyford
5, 6, 13, 62, 67, 92, 101
Provision of worksite and access for construction
14
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of new public right of way
24, 26, 44, 49, 54
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
27, 48
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
38, 60, 81, 82, 89, 90
Provision of flood mitigation measures
39
Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction
47, 63, 64, 69
Provision of environmental mitigation
Provision of worksite and access for construction
52
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of access for construction and maintenance
53, 76
Provision of worksite and access for construction and maintenance
58, 88
Provision of environmental mitigation
Provision of new public right of way
71, 75, 77, 83, 84, 95, 97, 99, 100
Provision of environmental mitigation
72
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
78
Provision of drainage and associated works
80
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
87
Diversion or installation of, or works to, utilities apparatus
91
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
94
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of access for construction and maintenance
Provision of new public right of way
Parish of Preston Bissett
1 to 4
Provision of flood mitigation measures
6, 13, 22, 27, 30, 31, 44, 45, 54 to 56, 58, 62, AP2-1
Provision of environmental mitigation
8, 15a, 16b, 28a, 29a, 52
Provision of worksite and access for construction
12a, 12b, AP4-1
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
20, 21
Provision of environmental mitigation
Provision of drainage and associated works
23a
Provision of environmental mitigation
Provision of new public right of way
Provision of drainage and associated works
Provision of worksite and access for construction and maintenance
37
Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction and maintenance
16c, 16d, 18b, 41, 47 to 51
Provision of environmental mitigation
Provision of worksite and access for construction
40, 42, 43, 61
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
County of Oxfordshire District of Cherwell Parish of Godington
5a, 5b, 12, AP2-1
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
6a
Provision of worksite and access for construction
8a, 8b, 14, 15
Provision of flood mitigation measures
County of Buckinghamshire District of Aylesbury Vale Parish of Chetwode
1 to 3, 8, 9
Provision of flood mitigation measures
5, 12 to 14, 22 to 24, 28, 31, 35, 42, 45, 52, 53, 55, 64, 84, 87
Provision of environmental mitigation
17a, 17b, 17c, 17d
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of drainage and associated works
19 to 21, 95, 96
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
25, 27, 34, 91
Provision of worksite and access for construction
30
Provision of environmental mitigation
Provision of drainage and associated works
41, 86, 88
Diversion or installation of, or works to, utilities apparatus
51
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
54
Provision of drainage and associated works
Removal of utility apparatus
63
Provision of drainage and associated works
65
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
71, 90
Provision of environmental mitigation
Provision of new public right of way
76
Provision of worksite and access for construction
Removal of utility apparatus
Parish of Barton Hartshorn
2a, AP2-5
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
6a
Provision of environmental mitigation
7a, 16
Provision of worksite and access for construction
9, 10, 22
Provision of flood mitigation measures
13
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
14
Provision of worksite and access for construction
Provision of drainage and associated works
19, 24
Provision of drainage and associated works
25, 26
Provision of environmental mitigation
Provision of new public right of way
County of Oxfordshire District of Cherwell Parish of Newton Purcell with Shelswell
1, 8, 17, 39, 49, 66
Provision of environmental mitigation
Provision of worksite and access for construction
4, 6, 15, 16, 19, 23, 31, 34, 36, 46, 54, 86
Provision of environmental mitigation
10, 22, 27, 55, 69, 75, 82, 83
Provision of worksite and access for construction
21, 26, 63, 67, 74, 76
Provision of drainage and associated works
32
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
Provision of worksite and access for construction
37, 59
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
30, 56, 58
Provision of worksite and access for construction and maintenance
57, 62
Provision of flood mitigation measures
Provision of drainage and associated works
61
Provision of worksite and access for construction and maintenance
Provision of new public right of way
64
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
72
Provision of worksite and access for construction
Provision of flood mitigation measures
85, 88
Diversion or installation of, or works to, utilities apparatus
92
Provision of worksite and access for construction
Provision of new public right of way
Parish of Finmere
5, 9, 54
Provision of environmental mitigation
7, 15
Provision of environmental mitigation
Provision of new public right of way
8, 12
Provision of environmental mitigation
Provision of worksite and access for construction
24, 33, 36, 37
Provision of worksite and access for construction
18
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
18a, 25, 40, 42
Diversion or installation of, or works to, utilities apparatus
48
Provision of access for utility works
52
Provision of environmental mitigation
Removal of utility apparatus
Parish of Mixbury
7, 24, 26, 40
Diversion or installation of, or works to, utilities apparatus
8, 13a
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
12, 17a, 45, 46, 57, AP2-8 to AP2-11
Provision of environmental mitigation
15a, 18, AP2-5a
Provision of environmental mitigation
Diversion and installation of overhead electric lines
34, 43a, 43b, 51
Provision of worksite and access for construction
28a, 37, 38
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
31
Provision of balancing pond and associated works and access for maintenance
Provision of electricity supply system and access
31a
Provision of environmental mitigation
Removal of utility apparatus
Diversion or installation of, or works to, utilities apparatus
39
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
40b, 40c, 49
Provision of environmental mitigation
Provision of worksite and access for construction
41a, 63
Provision of drainage and associated works
48
Provision of environmental mitigation
Provision of new public right of way
53, 54
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Provision of drainage and associated works
52
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Provision of drainage and associated works
Removal of utility apparatus
62
Provision of flood mitigation measures
Removal of utility apparatus
66
Removal of utility apparatus
County of Buckinghamshire District of Aylesbury Vale Parish of Westbury
1
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
Provision of drainage and associated works
1a
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of new public right of way
5, 6
Provision of drainage and associated works
7
Provision of environmental mitigation
Provision of drainage and associated works
Provision of new public right of way
Provision of worksite and access for construction and maintenance
14
Provision of flood mitigation measures
19, 21 to 25, 27
Provision of environmental mitigation
28
Provision of environmental mitigation
Provision of new public right of way
29
Provision of worksite and access for construction
Provision of new public right of way
30, 33 to 35, 38
Provision of worksite and access for construction
18, 20
Diversion or installation of, or works to, utilities apparatus
Parish of Turweston
3, 4, 45, 46
Provision of new public right of way
11
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
8, 13a, 20, 27, 50, 68, 71, 72, 76 to 79, 83, 85, 99, 100
Provision of worksite and access for construction
18, 21, 89, 91
Provision of environmental mitigation
29
Diversion or installation of, or works to, utilities apparatus
62, 73
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Removal of utility apparatus
81
Provision of worksite and access for construction and maintenance
37
Diversion and installation of overhead electric lines
38, 104, 106
Provision of environmental mitigation
Provision of worksite and access for construction
40, 57
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
42, 61, 67
Diversion and installation of overhead electric lines
43, 48
Diversion and installation of overhead electric lines
Provision of new public right of way
49
Provision of worksite and access for construction
Provision of new public right of way
65
Provision of worksite and access for construction
Removal of utility apparatus
Provision of balancing pond and associated works and access for maintenance
84
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
88
Provision of environmental mitigation
Diversion and installation of overhead electric lines
90
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
102, 110
Provision of drainage and associated works
109
Provision of environmental mitigation
Provision of flood mitigation measures
AP2-1 to AP2-4
Reinstatement of businesses or facilities
County of Northamptonshire District of South Northamptonshire Parish of Whitfield
1
Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead electric lines
4, 9, 13, 14
Provision of drainage and associated works
6
Provision of environmental mitigation
Diversion and installation of overhead electric lines
Provision of worksite and access for construction
Provision of drainage and associated works
Provision of electricity supply system, and access
10
Provision of environmental mitigation
Provision of flood mitigation measures
Provision of new public rights of way
Provision of drainage and associated works
16, AP2-3
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
20, 35
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
26
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
30
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
17
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
25
Provision of flood mitigation measures
Provision of new public right of way
27
Provision of flood mitigation measures
28
Provision of environmental mitigation
29, 37, 40, 42, 48 to 50
Provision of worksite and access for construction
41
Provision of balancing pond and associated works and access for maintenance
44
Provision of environmental mitigation
Provision of worksite and access for construction
Parish of Brackley
1
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
4, 6
Provision of worksite and access for construction and maintenance
7
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
9
Provision of worksite and access for construction
12
Provision of environmental mitigation
Provision of worksite and access for construction
13
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
14, 15
Diversion or installation of, or works to, utilities apparatus
Parish of Radstone
1, 2, 22
Provision of worksite and access for construction
5, 7a
Provision of worksite and access for construction
Provision of new public right of way
6a, 6b, 20
Provision of environmental mitigation
Provision of worksite and access for construction
9
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
7
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
8a, 16a, 16c, 18a, 18c, 40, 41, 47
Provision of environmental mitigation
10, 17, 21, 23, 38, AP2-4, AP2-6
Provision of environmental mitigation
Provision of drainage and associated works
19, 26, 32, 33
Provision of environmental mitigation
Provision of drainage and associated works
Provision of balancing pond and associated works and access for maintenance
27, 37a, 37b, 41a
Provision of balancing pond and associated works and access for maintenance
28, 29
Provision of flood mitigation measures
30
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of environmental mitigation
Provision of new public right of way
Removal of utility apparatus
36
Provision of environmental mitigation
Removal of utility apparatus
AP2-7
Provision of new public right of way
46
Provision of flood mitigation measures
Parish of Greatworth
1
Provision of new public right of way
3
Provision of drainage and associated works
Provision of flood mitigation measures
4
Provision of environmental mitigation
Provision of drainage and associated works
5
Provision of flood mitigation measures
8, 11, 15, 75, 76
Provision of environmental mitigation
9
Provision of worksite and access for construction
Provision of new public right of way
12, AP2-1
Provision of worksite and access for construction
Provision of new public right of way
Removal of utility apparatus
13
Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
Provision of worksite and access for construction
19
Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
15a
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
16, 17, 17a, 38
Diversion or installation of, or works to, utilities apparatus
18, 48, 59, 60, 63, 64, 66, 67, 71, 72, 74, 77, 80, 82, 84 to 86, 90, 91, 98, AP4-5
Provision of worksite and access for construction
10
Provision of environmental mitigation
Provision of new public right of way
20, 21
Provision of drainage and associated works
23
Provision of worksite and access for construction
Provision of drainage and associated works
Removal of utility apparatus
30, 70, 73
Provision of worksite and access for construction
Removal of utility apparatus
24
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
25
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
39a, 39b
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
26
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
28, 31, 32, 34, 52, 56, 83, 99
Provision of worksite and access for construction
Provision of environmental mitigation
29a
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
Provision of drainage and associated works
Provision of balancing pond and associated works and access for maintenance
33
Provision of balancing pond and associated works and access for maintenance
43
Provision of flood mitigation measures
Diversion or installation of, or works to, utilities apparatus
44
Provision of worksite and access for construction and maintenance
57, 61a
Provision of worksite and access for construction and maintenance
Provision of new public right of way
Parish of Marston St Lawrence
4, 23
Provision of environmental mitigation
5, 8, 11, 14
Provision of worksite and access for construction
7, 9
Provision of environmental mitigation
Provision of worksite and access for construction
15
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
17
Provision of environmental mitigation
Provision of drainage and associated works
AP4-1
Provision of drainage and associated works
Parish of Sulgrave
1
Provision of environmental mitigation
Provision of new public right of way
Parish of Thorpe Mandeville
3
Provision of new public right of way
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
4, 16, 48, 54
Provision of worksite and access for construction
18, 47
Diversion or installation of, or works to, utilities apparatus
15, 31, 35
Provision of environmental mitigation
25, 41, 42
Provision of drainage and associated works
26
Provision of environmental mitigation
Provision of drainage and associated works
Provision of balancing pond and associated works and access for maintenance
Removal of utility apparatus
28, 33, 36, 40, 43
Provision of flood mitigation measures
29, 51
Provision of environmental mitigation
Provision of worksite and access for construction
60, 62
Provision of balancing pond and associated works and access for maintenance
69
Provision of environmental mitigation
Provision of drainage and associated works
Removal of utility apparatus
Diversion or installation of, or works to, utilities apparatus
71
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
AP2-3
Provision of a turning head
Provision of access for construction
Parish of Culworth
1
Diversion or installation of, or works to, utilities apparatus
7, 8, 13, 16
Provision of environmental mitigation
Provision of worksite and access for construction
11
Provision of environmental mitigation
Provision of drainage and associated works
12, 20, 23
Provision of environmental mitigation
17
Provision of worksite and access for construction
Provision of electricity supply system and access
18
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of new public right of way
19, AP4-1
Provision of balancing pond and associated works and access for maintenance
21a
Provision of worksite and access for construction and maintenance
22, 25, 44
Provision of worksite and access for construction
29
Provision of drainage and associated works
34
Provision of worksite and access for construction
Provision of drainage and associated works
39
Provision of flood mitigation measures
Parish of Chipping Warden and Edgcote
2, 4, 9, 28, 32, 33, 95, 96, 105, AP4-1, AP4-1a, AP4-1b, AP4-2
Provision of environmental mitigation
35, 36, 39
Diversion or installation of, or works to, utilities apparatus
11
Provision of worksite and access for construction
Provision of flood mitigation measures
3, 14, 41
Provision of flood mitigation measures
15, 16, 24, 27, 38, 43, 48 to 50, 81b, 81d, 82b, 83b, 84, 86, 87a, 87b, 87c, 89a, 90, 91, 92b, 93, 104, 107, AP2-16, AP2-17, AP4-12, AP4-13
Provision of worksite and access for construction
18a
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
25
Provision of worksite and access for construction and maintenance
47, AP2-1
Provision of balancing pond and associated works and access for maintenance
58
Provision of environmental mitigation
Provision of new public right of way
65a
Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
71, AP1-3, AP2-15
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
72a, AP2-21
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
94a, 99
Provision of worksite and access for construction
Provision of new public right of way
AP2-3, AP2-5, AP2-13
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
AP2-14
Provision of a turning head
AP2-9
Provision of drainage and associated works
AP4-3
Provision of drainage and associated works
AP4-10, AP4-11
Provision of access for construction
Parish of Aston Le Walls
3, 32, AP4-1
Provision of worksite and access for construction
9
Diversion or installation of, or works to, utilities apparatus
10
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
17
Provision of worksite and access for construction
Provision of new public right of way
20
Provision of environmental mitigation
23, 25, AP2-1
Provision of environmental mitigation
Provision of worksite and access for construction
28a, 31, AP2-2, AP2-3
Provision of balancing pond and associated works and access for maintenance
39, AP2-4
Provision of drainage and associated works
Parish of Boddington
11, 29, 39, 52, 54, 66, AP2-1, AP4-3
Provision of drainage and associated works
3, 23, 26, 27a, 27b, 50, 51, 89, 107b, 109b, AP4-1, AP4-2
Provision of worksite and access for construction
2a, 40a, 87, 96, 98, 114, 123b, AP2-2
Provision of environmental mitigation
Provision of worksite and access for construction
18
Provision of environmental mitigation
Provision of new public right of way
Provision of worksite and access for construction
97, 100a, 107a, 109a
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
85
Diversion or installation of, or works to, utilities apparatus
16, 56, 86
Provision of flood mitigation measures
91
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
25, 30a, 30b, 57, 62, 63, 71, 72, 80, 93, 115, 121
Provision of environmental mitigation
97a and 99
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
101
Provision of worksite and access for construction and maintenance
14a
Provision of balancing pond and associated works and access for maintenance
Provision of flood mitigation measures
22
Provision of environmental mitigation
Provision of new public right of way
Provision of worksite and access for construction
28
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
61
Provision of environmental mitigation
Removal of utility apparatus
69
Provision of balancing pond and associated works and access for maintenance
74
Provision of environmental mitigation
Provision of worksite and access for construction
Removal of utility apparatus
81
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
103a
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction and maintenance
County of Warwickshire District of Stratford-on-Avon Parish of Stoneton
5, 7, 8, 13, 14, 16a, 28
Provision of environmental mitigation
15
Diversion or installation of, or works to, utilities apparatus
16, 18
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
19
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
6b, 9b, 22, 24
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Parish of Wormleighton
21
Provision of environmental mitigation
12, AP2-4
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
11, 15, 17, 18, 20
Provision of worksite and access for construction and maintenance
13
Diversion or installation of, or works to, utilities apparatus
23, 25
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
26
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
Provision of access for construction and maintenance of utility diversions
28
Provision of environmental mitigation
Provision of access for construction and maintenance of utility diversions
31b
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
34a, 47
Provision of environmental mitigation
Provision of worksite and access for construction
50
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
52
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
55
Provision of worksite and access for construction
Parish of Radbourn
2, 13b, 19, 28
Provision of worksite and access for construction
3
Provision of worksite and access for construction
Reprofiling of ground
Provision of drainage and associated works
6
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
7
Provision of worksite and access for construction
Reprofiling of ground
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
8, 8c
Provision of flood mitigation measures
8b
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Reprofiling of ground
Provision of new public right of way
9
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
Provision of new public right of way
Provision of environmental mitigation
11
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
Provision of new public right of way
13a
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
15
Provision of environmental mitigation
16
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
5
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
Provision of access for construction and maintenance of utility diversions
8d
Provision of environmental mitigation
Provision of worksite and access for construction
Parish of Ladbroke
5, 19, 20, 25 to 27
Diversion or installation of, or works to, utilities apparatus
7, 12, 15, 39, 41, 42, 52
Provision of environmental mitigation
8, 18
Reprofiling of ground
Provision of drainage and associated works
Provision of worksite and access for construction
24, 28, 32
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
29, 33, 71, 72
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
35, 56, 62, 63, 76
Provision of environmental mitigation
Provision of drainage and associated works
36, 61
Provision of worksite and access for construction
37, AP4-2, AP4-3
Provision of new public right of way
53, 59, 69
Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction
66
Provision of balancing pond and associated works and access for maintenance
AP4-1
Minor highway alterations
Parish of Southam
5, 31, 63, 65, 70, 72, 90, 93
Provision of environmental mitigation
54, 56, 58, 60 to 62, 87, AP1-1, AP1-2
Diversion or installation of, or works to, utilities apparatus
6, 9, 111
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
13, 94, 95
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
8, 14, 103
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
24, 32
Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
34, 39, 55, 68, 80
Provision of environmental mitigation
Provision of worksite and access for construction
16, 41, 53, 91
Provision of worksite and access for construction
28, 29
Provision of drainage and associated works
45
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
47
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
49, 51, 52, AP4-1 to AP4-3
Provision of new public right of way
75
Provision of environmental mitigation
Provision of access for construction and maintenance of utility diversions
100
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
107
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
112, 118
Provision of worksite and access for construction and maintenance
Parish of Long Itchington
1, 15, 19, 30a, 35a, 37, 47, AP4-4
Provision of environmental mitigation
2
Provision of worksite and access for construction and maintenance
6
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
7
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
7a
Provision of drainage and associated works
9
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of access for construction and maintenance of utility diversions
12, 49, 50, 52, 63, 64
Diversion or installation of, or works to, utilities apparatus
20, 22, 31, 32
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
53
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
48, 57
Provision of worksite and access for construction
58
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
59, 61
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
11a
Removal of utility apparatus
Parish of Ufton
2
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
8, 21, 23, 24
Diversion or installation of, or works to, utilities apparatus
9
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
15
Provision of environmental mitigation
Provision of worksite and access for construction
Drainage and associated work
11, 18
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
Provision of flood mitigation measures
AP4-4 to AP4-7
Provision of access for construction
District of Warwick Parish of Offchurch
4, 6, 32, 49, 50, 51a, 54a
Provision of environmental mitigation
7, 10, 98a
Provision of worksite and access for construction and maintenance
11
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
12, AP2-1
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Provision of drainage and associated works
13, 19, 28, 36, 42 to 44, 53a
Provision of environmental mitigation
Provision of worksite and access for construction
15
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
18
Provision of environmental mitigation
Minor highway alterations
21, 45, 58, 59b, 60, 62
Provision of worksite and access for construction
23
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
24
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
27
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
29, 66, 89
Diversion or installation of, or works to, utilities apparatus
37, 73
Provision of balancing pond and associated works and access for maintenance
57a
Provision of worksite and access for construction
Provision of drainage and associated works
68, 70, 84
Reprofiling of ground
Provision of worksite and access for construction
69
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
71, 75
Provision of new public right of way
78, 79, 87
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
80
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
Provision of access for construction and maintenance of utility diversions
91a
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
92a
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
47a
Provision of a turning head
51b
Provision of a turning head
Provision of environmental mitigation
AP2-2, AP2-3
Minor highway alterations
Parish of Cubbington
1a
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
19, 21, 41, 46, 49, 53, 57, 61, 65
Provision of worksite and access for construction
23, 27, 28, 50, 52, 67
Provision of environmental mitigation
4
Diversion or installation of, or works to, utilities apparatus
5, 6
Provision of access for construction and maintenance
Provision of access for construction and maintenance of utility diversions
9
Provision access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
11a, 14, 15
Provision of environmental mitigation
Drainage and associated works
Provision of worksite and access for construction
32
Provision of drainage and associated works
Provision of worksite and access for construction
35
Provision of environmental mitigation
Provision of drainage and associated works
Installation of ground anchors
39, 48
Provision of environmental mitigation
Provision of worksite and access for construction
44
Provision of new public right of way
47
Provision of access for construction and maintenance
AP4-3
Provision of environmental mitigation
Parish of Weston Under Wetherley
1, 2
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
4, 5a, AP4-1 to AP4-3
Provision of environmental mitigation
AP4-4
Provision of worksite and access for construction and maintenance
Parish of Stoneleigh
1, 5, 7, 10, 13, 18, 44, 119, 123, 124, 126, 129, 130, 142a, 147, 148, 152, 152a, 155, AP2-1 to AP2-3, AP4-7, AP4-8
Provision of worksite and access for construction
8, 27, 50, 52, 54a, 94, 117, 122, 164, 165, 167, 179, AP4-10, AP4-11
Provision of environmental mitigation
21, 24, 28, 29, 31, 34, 43, 77a, 83
Diversion or installation of, or works to, utilities apparatus
22, 42, 144, 158, 163
Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction
33, 62
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
48a, 66, 75, 96, 127, 128, 137, 138, 151, 173, 174, 177, AP4-10a, AP4-10b
Provision of environmental mitigation
Provision of worksite and access for construction
55
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
63
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
73, AP4-1
Provision of drainage and associated works
79a, 87, 112, 139
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
84
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
136, 141
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
97, 100, 143
Provision of worksite and access for construction and maintenance
99
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
104
Provision of balancing pond and associated works and access for maintenance
105
Provision of environmental mitigation
Provision of flood mitigation measures
132
Provision of flood mitigation measures
133, AP4-12
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
140b, 146
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
166, 182
Provision of environmental mitigation
Provision of new public right of way
171a
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
178
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
184
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
Parish of Kenilworth
12, 30a, AP2-3
Provision of environmental mitigation
13, 16, 21, AP2-1, AP2-2
Provision of worksite and access for construction
5, 6, 23, 25a
Provision of environmental mitigation
Provision of worksite and access for construction
9, 11, 15
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
20
Provision of worksite and access for construction
Provision of new public right of way
Parish of Burton Green
4, 6, 9, 13, 14, 23a, 37a, 43a, 48, 58b, 65a, 65b, 73a, 82a, 97, AP2-7, AP2-9, AP2-10, AP2-12
Provision of environmental mitigation
Provision of worksite and access for construction
7, 19, 59, 63, AP4-1 to AP4-4
Provision of environmental mitigation
11, 21, AP1-1a
Provision of worksite and access for construction
28a, 28b, 28c
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
29, 31
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
32, AP2-3
Provision of worksite and access for construction and maintenance
33a
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
Provision of new public right of way
35
Reinstatement of businesses or facilities
72
Provision of environmental mitigation
Provision of new public right of way
77
Provision of new public right of way
98
Provision of worksite and access for construction
Provision of new public right of way
AP2-1
Provision of worksite and access for construction
Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
AP2-6
Provision of passing places
District of North Warwickshire Parish of Great Packington
1, 6
Provision of worksite and access for construction
7, 8
Provision of balancing pond and associated works and access for maintenance
Parish of Little Packington
2
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
4
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
10, 12, 15, 16
Diversion and installation of overhead electric lines
17, 19
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
AP1-1
Reinstatement of businesses or facilities
Parish of Coleshill
1c
Provision of environmental mitigation
Diversion and installation of overhead electric lines
1f, 1g, 1r
Provision of balancing pond and associated works and access for maintenance
1, 2 to 5, 7, 12, 13, 112, 127, 134, 136, 139, 145, 148, 150, 160, 204, 272, 304, 306, 397, 408, 410, 435, 445, 479, 514, AP4-1b, AP4-15, AP4-17, AP4-22
Diversion and installation of overhead electric lines
33, 35 to 37, 40, 41, 85, 381, 433, 454, 455, 482a, 540, 556, 558a, 561a, 565a
Diversion or installation of, or works to, utilities apparatus
38
Provision of balancing pond and associated works and access for maintenance
48, 52, 58, 59, 63, 68, 101, 102, 106, 278, 288a, 295, 296, 365, 371, 413, 420, 581a, 589a
Provision of worksite and access for construction
50
Diversion and installation of overhead electric lines
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of balancing pond and associated works and access for maintenance
116, 124, 162a, 180b, 240, 241, 244, 246a, 248, 300, 302, 309, 320, 325, 326, 357, 367, 372, 428, 484, 509, 510, 519, AP2-21, AP2-24, AP2-26 to AP2-28
Provision of environmental mitigation
51, 440, 495a
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
73
Provision of environmental mitigation
Removal of existing utilities
546a
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
74, 321, 452a, 452b, 546
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
75, 233a, 322, 377, 391, 396
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
77, 87a, 90a, 90b, 91a, 91b, 92a, 92b 103a, 103b, 108b, 108c, 152, 157, 548a
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
112b
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
127a
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
108a, 310, 315, 354, 506 to 508, 580a
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
100, 427
Provision of worksite and access for construction and maintenance
164
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead electric lines
283, 289, 297, 312a, 335, 346, 366, 369
Provision of environmental mitigation
Provision of worksite and access for construction
188
Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction
195, 196
Provision of worksite and access for construction
Diversion and installation of overhead line equipment
199
Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead line equipment
247, 257a
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of new public right of way
253, 388, 416, 451, 459, 460, 502
Provision of environmental mitigation
Diversion and installation of overhead line equipment
308, 318, 467
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
358
Diversion and installation of overhead line equipment
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of balancing pond and associated works and access for maintenance
404, 409
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
432
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
412
Provision of environmental mitigation
Diversion and installation of overhead line equipment
419, 517a
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
481
Provision of environmental mitigation
Provision of new public right of way
491a, 491b
Provision of environmental mitigation
Provision of new public right of way
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
511, 559a, 559b, AP2-20
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of balancing pond and associated works and access for maintenance
526a, 526b
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
593a, 593b
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead line equipment
439, 485, 486
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
492, 500
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Parish of Water Orton
6, 132
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
9a, 10, 27, 28, 37, 40, 43a, 82a
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
13a, 42, 50, 57, 64, 65, 67 to 69, 74
Provision of environmental mitigation
23, 34, 35, 38, 39, 41, 77a
Provision of environmental mitigation
Provision of worksite and access for construction
43, AP4-5
Reinstatement of businesses or facilities
44, 89a, 126, 130, 142, AP4-25, AP4-26
Provision of worksite and access for construction
48
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
52
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
53, 54, 56
Provision of balancing pond and associated works and access for maintenance
76
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
100a, 100b, 100c, 118
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
119a, 123
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
124a, 124b, 129, 139a
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
131a, 131b, 145, 146a, 146b, 149a, 149b, AP4-19, AP4-20
Diversion and installation of overhead electric lines
138a
Diversion or installation of, or works to, utilities apparatus
133, 140, 143
Provision of worksite and access for construction and maintenance
155a, 155b
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
Provision of balancing pond and associated works and access for maintenance
AP4-14, AP4-16, AP4-17
Provision of worksite and access for construction
Minor highway alterations
Parish of Shustoke
AP4-1 to AP4-3, AP4-5, AP4-6
Provision of environmental mitigation
Parish of Curdworth
1a, 49, 70, 72, 77, 78, 80, 106, 215
Diversion or installation of, or works to, utilities apparatus
2
Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
3a, 6, 7, 113a, 201, 202, 223, 241, 244
Provision of worksite and access for construction
5a, 5b, 8a, 11a, 37, 39, 40, 43, 51b, 58, 59, 61, 82a, 96, 102, 153a, 168, 170, 174, 186, 187, AP1-1, AP1-2, AP4-1, AP4-17 to AP4-24, AP4-30, AP4-32
Diversion and installation of overhead electric lines
13, AP2-6
Provision of worksite and access for construction
Provision of environmental mitigation
16, 21 to 23, 34, 38, 57, 81, 114, 117, 118, 121, 128, 137, 140, 141, 142, 149, 152, 155, 156, 160, 192, 200, AP1-5, AP1-6, AP2-7 to AP2-9, AP4-3 to AP4-9
Provision of environmental mitigation
10a, 25a, 26 to 28, 31, 32, 45, 48, 69
Provision of environmental mitigation
Diversion and installation of overhead electric lines
35, 191, 194
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
210, 216, 219, 220 to 222, 225 to 227, 229, 231, 235, 236, 238, 240, 243, 245, 246
Provision of worksite and access for construction and maintenance
51a, 68a
Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead electric lines
65a, 66a, 81a
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
71
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
67a, 83, 83a, 90 to 92
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
88, 209, 233, 247
Provision of new public right of way
98, 101, 103
Installation of ground anchors
99, 103a
Installation of ground anchors
Provision of access for utility works
108a
Provision of environmental mitigation
Provision of access for utility works
153, 164, 251, 254, 256
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
228
Removal of utility apparatus
249
Provision of new public right of way
Provision of environmental mitigation
252
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
AP2-10
Provision of access for maintenance
Parish of Lea Marston
1 to 4, 13, 16
Diversion or installation of, or works to, utilities apparatus
12, 14
Provision of environmental mitigation
Provision of drainage and associated works
17, 24a, 26, 28 to 30, 32, 33, 35, 37, 41, 54, 55a, 59, 61, 65a, 71a, AP2-1, AP2-8 to AP2-12, AP2-17, AP2-18, AP2-25, AP4-1 to AP4-4
Provision of environmental mitigation
18
Provision of balancing pond and associated works and access for maintenance
44, 47, 49, AP2-23
Provision of new public right of way
66
Provision of new public right of way
Provision of worksite and access for construction
67
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
72a, 72b, 73
Provision of new vehicular right on existing public right of way
74a
Provision of environmental mitigation
Provision of new public right of way
55b, 68b
Provision of environmental mitigation
Minor highway alterations
78a, AP2-22
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Provision of environmental mitigation
AP2-24
Provision of new public right of way
Parish of Kingsbury
2, AP2-1, AP2-2
Provision of environmental mitigation
Parish of Middleton
4, 108
Provision of environmental mitigation
Provision of flood mitigation measures
27, 37, 39, 47, 72 to 74, 87, 93, 95, 99, 101 to 103, 114, 115, 121, 125, 131a, 134a, 148, 160, 167, 175, AP2-6 to AP2-8, AP2-10b, AP2-18, AP2-21
Provision of environmental mitigation
100, AP2-10a
Provision of environmental mitigation
Provision of flood mitigation measures
Provision of balancing pond and associated works and access for maintenance
21, 30, 32
Diversion and installation of overhead electric lines
110, 169a
Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
5a, 13a, 31a, 127a, 135a, AP2-10, AP2-10c, AP2-20
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction and maintenance
Provision of flood mitigation measures
38, 66
Diversion or installation of, or works to, utilities apparatus
41
Provision of flood mitigation measures
52
Provision and renewal of railway systems for operational purposes and drainage
11a, 57, 58, 135b, 135c, 135d, 138a, 142a, 147a, 153a, 154a, 156a, 157a, 164a, 171a, 174, AP2-3, AP2-4, AP2-4a, AP2-11b
Provision of environmental mitigation
Provision of worksite and access for construction
AP2-9
Provision of new public right of way
107
Provision of environmental mitigation
Provision of flood mitigation measures
Provision of worksite and access for construction and maintenance
112, AP2-5
Provision of balancing pond and associated works and access for maintenance
113
Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction and maintenance
124, 129, AP2-5a
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
128
Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction
County of Staffordshire District of Lichfield Parish of Drayton Bassett
2a, 3, 4a, 4b, 35, 38, 40, 43, 45, 46, 49, 52, 54, 55, 65, 75, 100, AP2-1, AP2-3, AP2-4
Provision of environmental mitigation
28
Diversion or installation of, or works to, utilities apparatus
7, 23, 29, 50, 86
Diversion and installation of overhead electric lines
13a, AP4-1
Provision of worksite and access for construction and maintenance
16
Provision of worksite and access for construction
19a, AP2-6
Provision of balancing pond and associated works and access for maintenance
22, 24
Provision of environmental mitigation
Provision of flood mitigation measures
Provision of worksite and access for construction
30
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
33
Provision of environmental mitigation
Provision of drainage and associated works
53, 92, 94, 102, AP2-7
Provision of environmental mitigation
Provision of worksite and access for construction
58, 59, 63, 68, 71, 80
Provision of environmental mitigation
Diversion and installation of overhead electric lines
93
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
99
Provision of environmental mitigation
Provision of new public right of way
106
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
109, 117, AP2-8 to AP2-10
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
114, AP2-2
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of worksite and access for construction
Parish of Fazeley
3, 6, 8
Diversion and installation of overhead electric lines
Parish of Hints with Canwell
15, 17, 18, 87, 88, AP2-20
Provision of worksite and access for construction and maintenance
20
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
21, 53, 59, 63, 68, 71a, 72, 74, 81, 122, 128, 141, 145, 147a, AP2-12, AP2-17
Provision of environmental mitigation
23, 125, 129
Diversion or installation of, or works to, utilities apparatus
24, 50, 62b, 73a, 76a, 77b, 77c, 77d, 84a, 84b, 110, 154
Provision of environmental mitigation
Provision of worksite and access for construction
25, 28
Provision of worksite and access for construction
Provision of environmental mitigation
Diversion and installation of overhead electric lines
30, 33, 38, 45, 47, 48
Diversion and installation of overhead electric lines
35
Diversion and installation of overhead electric lines
Provision of new public right of way
Provision of worksite and access for construction
Provision of environmental mitigation
37, 39
Diversion and installation of overhead electric lines
Provision of new public right of way
55a, 62a, 62c, 73b, 77a, AP2-9a, AP2-18, AP2-19
Provision of environmental mitigation
Provision of new public right of way
Provision of worksite and access for construction
58, AP2-22, AP2-23, AP2-24a
Provision of drainage and associated works
61
Implementation of woodland management measures
65, 143
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
70
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
75a, 75b
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of new public right of way
78a, 78b, 96a
Provision of environmental mitigation
Provision of flood mitigation measures
80
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
82a
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Implementation of woodland management measures
86
Provision of balancing pond and associated works and access for maintenance
94
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
101
Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
116 to 118, 123
Provision of worksite and access for construction
131a
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
Provision of new public right of way
153, 155
Provision of environmental mitigation
Provision of drainage and associated works
157a, 159
Provision of worksite and access for construction
Provision of drainage and associated works
Provision of environmental mitigation
Parish of Weeford
7, 24, 27
Provision of environmental mitigation
12, 16, 21
Provision of worksite and access for construction
14
Provision of access for construction and maintenance
20
Provision of environmental mitigation
Provision of worksite and access for construction
22
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
AP1-5, AP1-8, AP1-10, AP1-11
Diversion and installation of overhead electric lines
AP2-1
Provision of drainage and associated works
Parish of Swinfen and Packington
11, 16, 23
Provision of environmental mitigation
11a, AP2-1, AP2-2
Provision of drainage and associated works
12, 15, 29
Provision of environmental mitigation
Provision of worksite and access for construction
20
Provision of environmental mitigation
Provision of new public right of way
17a, 18a, 19, 22
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
33, 34, 42
Provision of worksite and access for construction
36, 39
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
37
Diversion or installation of, or works to, utilities apparatus
Parish of Whittington
5, 17, 63, 67, AP2-25, AP2-26
Diversion or installation of, or works to, utilities apparatus
19a, 20a, 23, 101a, AP2-2 to AP2-4
Provision of environmental mitigation
92a, 92b, AP2-5, AP2-6
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
28, 29, 31, 100a, 104a, 105a, 107, 112, 114a
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
32, 47, 48
Implementation of woodland management measures
37, 41
Implementation of woodland management measures
Provision of new public right of way
42, 46
Provision of environmental mitigation
Provision of worksite and access for construction
Implementation of woodland management measures
52, 54, 116a
Provision of worksite and access for construction and maintenance
58, 64, 66, 98a
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
79, 91, AP2-28, AP2-29
Provision of worksite and access for construction
81a
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
25a
Provision of environmental mitigation
Provision of access for maintenance
AP2-10, AP2-11, AP2-38
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
AP2-20
Provision of drainage and associated works
94a
Provision of environmental mitigation
Provision of drainage and associated works
103a
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Parish of Fradley and Streethay
AP2-1, AP2-21
Provision of environmental mitigation
AP2-24, AP2-30, AP2-36a, AP2-37, AP2-38, AP2-44, AP2-45, AP2-66, AP2-67, AP2-70, AP2-72, AP2-72a, AP2-76, AP2-80, AP2-82, AP2-106, AP2-134, AP2-135, AP2-135a, AP2-136, AP2-138
Provision of worksite and access for construction
AP2-22, AP2-46, AP2-47, AP2-50, AP2-51, AP2-52, AP2-53, AP2-55, AP2-59, AP2-60, AP2-65, AP2-83, AP2-85, AP2-87, AP2-88, AP2-90, AP2-92, AP2-93, AP2-98, AP2-100, AP2-104, AP2-105, AP2-107, AP2-109, AP2-110, AP2-111, AP2-114, AP2-116, AP2-128, AP2-129, AP2-130, AP2-131a, AP2-132, AP2-133, AP2-141, AP2-143, AP2-145, AP2-146, AP2-147, AP2-150, AP2-151, AP2-155, AP2-157
Provision of environmental mitigation
Provision of worksite and access for construction
AP2-119, AP2-120, AP2-122
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
AP2-61, AP2-62, AP2-64
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
AP2-40, AP2-43, AP2-68, AP2-71, AP2-163
Provision and renewal of railway systems for operational purposes and drainage
AP2-19, AP2-20, AP2-23
Diversion or installation of, or works to, utilities apparatus
AP2-16
Provision of environmental mitigation
Provision and renewal of railway systems for operational purposes and drainage
Provision of drainage and associated works
AP2-117
Provision of new public right of way
Parish of Curborough and Elmhurst
AP4-3 to AP4-7
Diversion or installation of, or works to, utility apparatus
Parish of Lichfield
AP4-3
Diversion or installation of, or works to, utility apparatus
Parish of Longdon
4 to 6, 8 to 10, 13, 14
Diversion and installation of overhead electric lines
Parish of Kings Bromley
1, 4
Provision and renewal of railway systems for operational purposes and drainage
119, 160, 185, 186, 193a, 194, AP2-3, AP2-5, AP2-8, AP2-9, AP2-11 to AP2-13, AP2-27, AP2-28
Provision of environmental mitigation
Provision of worksite and access for construction
98, 100, 114a, 118a, 124a, 130a, AP2-17, AP2-41, AP2-46a
Provision of worksite and access for construction and maintenance
AP2-54
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of worksite and access for construction
AP2-33, AP2-35a, AP2-35b, AP2-35c
Provision of worksite and access for construction
Provision of environmental mitigation
Provision of drainage and associated works
52a, 52b, 121
Provision of worksite and access for construction
165, AP2-52, AP2-52a, AP2-53
Provision of environmental mitigation
AP2-46b, AP2-46c
Provision of environmental mitigation
Provision of drainage and associated works
61a, 78, 81, 146, AP2-7, AP2-40, AP4-2, AP4-3, AP4-5, AP4-6, AP4-8, AP4-9
Diversion or installation of, or works to, utilities apparatus
62, 65, 140A, 192, 192b, AP1-1 to AP1-5, AP1-7, AP1-9 to AP1-12, AP2-39, AP2-43, AP2-44, AP4-1
Diversion and installation of overhead electric lines
83, 90
Diversion and installation of overhead electric lines
Provision of environmental mitigation
85a, 86
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
88
Provision of access for construction
91, 195, 196
Provision of drainage and associated works
95, 168, 187
Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
102, AP2-35a
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
128a
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
AP2-31a
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
138, 139, 142
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
148
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
Provision of worksite and access for construction
161, 171
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
AP2-15, AP2-19, AP2-20a, AP2-21a, AP2-25
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
130b
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
140c
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Parish of Armitage with Handsacre
1, 4
Provision of worksite and access for construction
11, 14, 15
Provision of worksite and access for construction
Provision of drainage and associated works
18, 20, 24, AP2-1 to AP2-3
Provision of worksite and access for construction and maintenance
Parish of Colton
10, 16, 17
Provision and renewal of railway systems for operational purposes and drainage
Borough of Stafford Parish of Colwich
24, AP2-1
Provision and renewal of railway systems for operational purposes and drainage
Metropolitan Borough of Solihull Parish of Berkswell
2a, 4, 28a, AP2-4
Provision of environmental mitigation
Provision of worksite and access for construction
6a, 6b, 8, 9, 10, 12, 17, 32c, 67, AP2-8, AP2-9
Provision of worksite and access for construction
24, 26b, 47, 54, 71, 72
Diversion and installation of overhead electric lines
31
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
35
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of electricity supply system and access
36a, 36b
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
37
Provision of electricity supply system and access
42, AP2-10, AP2-11
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
43
Provision of environmental mitigation
Provision of worksite and access for construction
Installation of ground anchors
53
Provision of new public right of way
55
Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction
Provision of new public right of way
59
Provision of worksite and access for construction
Provision of new public right of way
60, 64 and 69
Provision of drainage and associated works
Provision of worksite and access for construction
63
Provision of environmental mitigation
Provision of drainage and associated works
32b, 127, 128, 134, 145, 164a, 165c, 209, AP2-14
Provision of environmental mitigation
129, 136, 167, 168a, 168c, 169, 170, 172a, 174, 185, 186, 188, 191, 193, 205, 207, 216, 218, 219, 231, 236
Provision of worksite and access for construction
130a, 142
Provision and renewal of railway systems for operational purposes and drainage
143
Provision of a worksite and access for construction and maintenance
Provision of balancing pond and associated works and access for maintenance
140, 141, 162, 175, 206, 211, 220, 230
Provision of worksite and access for construction and maintenance
147, 151, 152, 153, 155
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utility apparatus
Provision of environmental mitigation
158
Provision of flood mitigation measures
Provision of worksite and access for construction and maintenance
172, 221, 222
Provision of flood mitigation measures
Provision of worksite and access for construction
195, 204, 208, 238
Provision of environmental mitigation
Provision of worksite and access for construction
223, 233
Provision of balancing pond and associated works and access for maintenance
Parish of Meriden
3
Provision of environmental mitigation
Provision of worksite and access for construction
Parish of Hampton-in-Arden
1
Provision of worksite and access for construction and maintenance
Provision of new public right of way
2
Provision of environmental mitigation
4, 6, AP2-6
Provision of environmental mitigation
Provision of worksite and access for construction
7, 15, 16, 16b, 17, 17b, 18, 27 to 29, 30a, 31a, 37b, 50a, 52, 54, 62, AP2-24
Provision of worksite and access for construction
8, 26, 34, 45, 55
Provision of balancing pond and associated works and access for maintenance
9
Provision of drainage and associated works
16a, 17a, 18a, AP2-8, AP2-10, AP2-11
Provision of worksite and access for construction
Provision of flood mitigation measures
22
Provision of worksite and access for construction and maintenance
24, 43
Provision of a turning head
36, 41
Provision of worksite and access for construction and maintenance
Provision of balancing pond and associated works and access for maintenance
35, 42
Provision of worksite and access for construction and maintenance
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
46a
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
47a
Provision of worksite and access for construction
Diversion or installation of, or works to, utility apparatus
49
Provision of flood mitigation measures
25b, 25c
Minor highway alterations
37a
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of environmental mitigation
47b
Provision of worksite and access for construction
Diversion of installation of or works to, utilities apparatus
Provision of new public rights of way
Provision of worksite and access for construction
AP2-26
Provision of drainage and associated works
Parish of Bickenhill
2, 3
Provision of balancing pond and associated works and access for maintenance
6, 7, 10, 18, 22, 23, 29, 31, 32, 35, 46, 48, 57, 60, 61, 69, 71a, 74 to 76
Provision of worksite and access for construction
37, 40, 41b, 62, 69a
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
41
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
12
Provision of balancing pond and associated works and access for maintenance
11
Provision of balancing pond and associated works and access for maintenance
Minor highway alterations
42a, 42b, 42c, 57a, 57b, 57c
Provision and renewal of railway systems for operational purposes and drainage
58
Diversion or installation of, or works to, utilities apparatus
71
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of balancing pond and associated works and access for maintenance
71b
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of balancing pond and associated works and access for maintenance
85
Provision of environmental mitigation
Diversion and installation of overhead electric lines
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
87
Provision of environmental mitigation
90
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
88
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
91
Diversion or installation of, or works to, utilities apparatus
Reinstatement of businesses or facilities
91a
Reinstatement of businesses or facilities
Parish of Dickens Heath
AP4-1
Reinstatement of businesses or facilities
Parish of Chelmsley Wood
6
Provision of worksite and access for construction and maintenance
City of Birmingham
1a
Diversion and installation of overhead electric lines
3a, 4b, 4c, AP2-11, AP2-12
Provision of worksite and access for construction
5a
Provision of environmental mitigation
12
Provision of environmental mitigation
Provision of worksite and access for construction
8
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
9
Provision of environmental mitigation
Provision of flood mitigation measures
9a and 9b
Provision of environmental mitigation
Provision of flood mitigation measures
Diversion and installation of overhead electric lines
13a, 15, 29, 32, 33
Provision of environmental mitigation
Provision of worksite and access for construction
Provision of flood mitigation measures
14, 28
Provision of environmental mitigation
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of flood mitigation measures
16, 31, 54 to 56, 69, 78, 157m, 157n, 157p, 157q, 157s, 159, 163, 194, 195, 196, 214 to 216, 218, 281, 282, 300h, 308, 315, 316, 320, 327, 328, 330, 353, 364, 385, 386, 401
Provision of worksite and access for construction
23, 24, 27
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
26
Provision of environmental mitigation
41
Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
46, 151, 157r, 245, 264, 267, 300a, 300b, 300c, 478, 479
Provision of worksite and access for construction
Diversion or installation of, or works to, utility apparatus
63a, 63b, 63c, 63d, 63f, 63g, 63h, 63i, 63j, 63k, 85a, 85b, 85c, 85d, 85e, 85f, 85g, 85h, 85i, 85j, 85k, 87c, 87e, 87f, 87g, 87h, 87i, AP2-5, AP2-7, AP2-9, AP4-25 to AP4-28
Reinstatement of businesses or facilities
67
Provision of worksite and access for construction
Provision and renewal of railway systems for operational purposes and drainage
102a, 102b, 102c, 102d, 157d, 157f, 157h, 157i, 157k, 246, 248, 251a, 251b, 251c, 251d, 251e, 251f, 251g, 251h, 251j, 251k, 251n, 261, 263, AP4-20 to AP4-22, AP4-24
Diversion or installation of, or works to, utility apparatus
157c, 157e, 157g, 274a, 322, 355, 363, 376
Provision and renewal of railway systems for operational purposes and drainage
223
Provision of worksite and access for construction
Provision of access for construction and maintenance
268
Provision and renewal of railway systems for operational purposes and drainage
Diversion or installation of, or works to, utility apparatus
269, 271 to 273, 324, 419
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
300d, 300e
Removal of utility apparatus
19, 304, 305, 306, 326, 326a
Provision of balancing pond and associated works and access for maintenance
332, 334, 339, 340, 345, 346, 360, 366, 379, 384, 387, 388, 395, AP4-30, AP4-31
Provision of worksite and access for construction and maintenance
367, 368
Provision and renewal of railway systems for operational purposes and drainage
Provision of worksite and access for construction and maintenance
437
Provision of worksite and access for construction
Provision of a turning head
317
Minor highway alterations
City of Manchester
1 to 6
Modification to depot

---
Source: https://www.legislation.gov.uk/ukpga/2017/7/schedule/5/paragraph/wrapper3n1 (the official version)