Schedule 2 Table of fees payable
| Column 1 | Column 2 |
|---|---|
| Category of development for which approval is sought | Fee payable |
| 1. Plans and specifications for the following works | |
| A | |
| (i) Building works - the erection, construction, alteration or extension of a building, other than a temporary building and excluding anything in C below. | (a) where no gross floor space is to be created by the development, £195; (b) where the area of gross floor space to be created by the development does not exceed 40 square metres, £195; (c) where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £385; (d) where the area of gross floor space to be created by the development exceeds 75 square metres but does not exceed 3750 square metres £385 for each 75 square metres or part thereof of that area; (e) where the area of gross floor space to be created by the development exceeds 3750 square metres, £19,049; and an additional £115 for each 75 square metres or part thereof subject to a maximum of £250,000. |
| (ii) Fences and walls – the erection, alteration or extension of any fence or wall (other than sight, noise or dust screens). | |
| (iii) Sight, noise or dust screens - the erection, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening or dust suppression. | |
| (iv) Artificial lighting equipment - the erection, alteration, extension or installation of lighting equipment. | |
| B Road vehicle park – does not include anything that is a building. | £195. |
| C Earthworks – the erection, alteration or extension of any terracing, cuttings, embankments or other earth works. | £195 for each 0.1 hectares or part thereof of the site, subject to a maximum of £1,690. |
| D | |
| (i) Telecommunications masts or pedestrian access to the railway line. | £195. |
| (ii) Transformers. | The criteria in (a) to (e) in category 1A apply for the calculation of the fee. |
| 2. Matters ancillary to development | |
| A. Handling of re-useable spoil or top soil – handling during removal, storage and re-use of any spoil or top soil removed during the course of carrying out the development. | £195. |
| B. Storage sites – sites on land within the Act limits at which materials are to be stored until used or re-used in carrying out the development or disposal as waste. | £195. |
| C. Construction camps – sites on land within the Act limits which are to be used for the residential accommodation of persons engaged in carrying out the development. | £195. |
| D. Works screening – the provision where necessary on land within the Act limits of any screening for working sites on such land required for the purpose of carrying out the development. | £195. |
| E. Artificial lighting – the use of artificial lighting on land within the Act limits for the purpose of carrying out the development. | £195. |
| F. Dust Suppression – the suppression of dust caused by construction operations carried out on land within the Act limits for the purpose of carrying out the development. | £195. |
| G. Road mud control measures – the measures to be taken on land within the Act limits to prevent or reduce the carrying of mud on to any public highway as a result of carrying out the development. | £195. |
| 3. Road transport | |
| Arrangements concerning road transport – the arrangements regarding the routes by which anything is to be transported on a highway by a large goods vehiclef1 to a working or storage site; a site where it will be re-used; or a waste disposal site. | £195. |
| 4. Waste and spoil disposal and excavations | |
| The development to the extent it consists of waste and spoil disposal or the excavation of bulk materials from borrow pits. | £195 for each 0.1 hectares or part thereof of the site area, subject to a maximum of £29,112. |
| 5. Bringing scheduled works or depots into use | |
| Arrangements for bringing into use scheduled works and depots. | £195. |
| 6. Mitigation schemes | |
| A mitigation scheme consists of reasonably practicably measures to mitigate the effect of the works or operation (paragraph 9(4)(b) of the Schedule). | £195. |
| 7. Site restoration schemes | |
| A site restoration scheme. | £195. |
| 8. Additional details | |
| Additional details request. | £97. |
| 9. Non-material changes | |
| The request for a non-material change to any approval (paragraph 21 of the Schedule). | £195. |
Annotations
Footnotes
- f1
-
See paragraph 6(7) of Schedule 17 to the High Speed Rail (London – West Midlands) Act 2017 where this term is defined.