# High Speed Rail (West Midlands - Crewe) Act 2021, Paragraph 1


(1) If the Secretary of State makes an order under section 9(2), paragraphs 2 to 4 have effect as from the coming into force of the order.
(2) Those paragraphs do not apply to any subsoil or under-surface of land required only for the construction of a work at a level more than 9 metres below the level of the surface of the land.

---