# High Speed Rail (West Midlands - Crewe) Act 2021, Paragraph


The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table.
Area
Number of land shown on deposited plans
Purpose for which land may be acquired or used
County of Staffordshire
District of Lichfield
Parish of Fradley and Streethay
1 to 15, 22a
Provision of railway infrastructure and access
16
Provision of railway infrastructure and access
Utility works
20, 21, 24, 25c, 29, 35
Worksite and access for construction
23, 28
Utility works
19b, 30a, 31a, 32a
Provision of environmental mitigationWorksite and access for construction
Parish of Kings Bromley
1, 2, 23, 37, 41, 42, 87, 88, 90, 200, 222, AP2-31
Provision of environmental mitigation
9, 16a, 16b, 50, 96, AP2-37, AP2-38, AP2-51, AP2-52, AP2-56, AP2-58, AP2-65, AP2-69, AP2-71a, AP2-72, AP2-84
Provision of environmental mitigationWorksite and access for construction
12, 116a, AP2-28
Utility works
Worksite and access for construction
15, 17, 25a, 29 to 31, 43, 55, 56, 58, 62, 63, 84, 102, 141, 153, 160, 182, 185, 187, 198, 202 to 206, 209, 214, 243 to 246, 248 to 250, 252, AP1-4 to AP1-8, AP1-10 to AP1-13, AP2-101
Utility works
20, 21, 35, 101, 136, 137a, 137b, 139a, 142, 147, 149, 152, 155, 162, 211, AP2-34, AP2-85, AP2-88
Worksite and access for construction
38, 39, 52, 54, 134a, 172
Borrow pit
49
Highway works
51
Provision of railway infrastructure and access
Borrow pit
66, 140
Worksite and access for construction Borrow pit
70, 169
Provision of railway infrastructure and access
Provision of environmental mitigation
77
Highway works
Worksite and access for construction
92a, 93, 100c, 112, 129b, 138b
Provision of environmental mitigation
Utility works
100a
Provision of environmental mitigationUtility worksProvision of a public right of way
122a
Provision of environmental mitigation
Worksite and access for construction
Borrow pit
143
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
148
Provision of environmental mitigation
Borrow pit
260
Provision of environmental mitigation
Utility works
Worksite and access for construction
Provision of a public right of way
261
Provision of environmental mitigation
Utility works
Worksite and access for construction
AP2-26, AP2-29, AP2-75, AP2-86, AP2-90, AP2-93
Dewatering operations
AP2-50, AP2-50a, AP2-73
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
AP2-89, AP2-96
Worksite and access for construction
Dewatering operations
Parish of Alrewas
1
Provision of environmental mitigation
Worksite and access for construction
3, 7
Worksite and access for construction
11 to 13
Borrow pit
AP2-1
Utility works
Worksite and access for construction
Parish of Armitage with Handsacre
3, 7, 10, 11
Provision of environmental mitigation
6, 17, 18, 20, 21
Worksite and access for construction
AP2-5, AP2-5a, AP2-9, AP2-10
Utility works
AP2-14 to AP2-18
Provision of railway infrastructure and access
Parish of Hamstall Ridware
1, 3
Worksite and access for construction
2
Provision of environmental mitigation
4, 5, 8
Worksite and access for constructionBorrow pit
Parish of Mavesyn Ridware
2, 4, 39a, 46, 50, 63, 80, 112, 113, 115, 125, 132, 133, 148, 152, 179, 180, 190, 192, 193, AP1-13a, AP1-13b, AP1-23a, AP1-24a, AP1-25, AP2-10, AP2-17
Worksite and access for construction
6 to 8, 51, 53, 97, 102, 118, 119, 126, 131, 139, 159, 161, 162, 166, 167, 172, 173, AP2-56, AP2-57, AP2-63 to AP2-67
Provision of environmental mitigation
9
Borrow pit
11
Borrow pit
Provision of a public right of way
23, 30, 32a, 33a, AP1-16a, AP1-17a, AP1-18a, AP1-19a, AP1-21a, AP2-16, AP2-19, AP2-32, AP2-33, AP2-35, AP2-36
Utility works
Worksite and access for construction
98, 104, 117, 216, AP1-27 to AP1-29, AP2-21, AP2-23, AP2-70 to AP2-75, AP2-79 to AP2-81
Utility works
42 to 44, 89
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
49
Provision of environmental mitigation
Provision of a public right of way
64, 105
Provision of railway infrastructure and access
Provision of environmental mitigation
66, 93, 114, 134, 147, 150, 156, 205, AP2-25, AP2-26, AP2-30, AP2-31, AP2-52, AP2-54
Provision of environmental mitigation
Highway works
71
Highway works
Worksite and access for construction
74
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
76, 82
Worksite and access for construction
Provision of a public right of way
90
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
93a, 95a, 108, 140, 142, 143, 160, 163, 169, 175, 177, 182
Provision of environmental mitigation
Worksite and access for construction
185, 202, AP1-15, AP1-30, AP1-32, AP1-34
Highway works
AP1-33, AP1-35, AP1-37
Highway works
Utility Works
AP2-6 to AP2-8
Dewatering operations
AP2-1 to AP2-5, AP2-9, AP2-11, AP2-14, AP2-20, AP2-37, AP2-39, AP2-44 to AP2-51
Provision of railway infrastructure and access
AP2-38, AP2-40, AP2-41, AP2-43
Provision of residential facility
Parish of Colton
45a, 46a, 48, 56, 57a, 61a, 63a, 73a, 95, 98, 100, 103, 106, 111, 112, 120, 121, 124, 134 to 136, 144, 145, 183, 187, 191, 215, 221 to 224, 226, 232, 243, 244, AP1-1 to AP1-3, AP1-7 to AP1-9, AP2-1, AP2-3 to AP2-7, AP2-14, AP2-18, AP2-20, AP2-25, AP2-31 to AP2-33, AP2-35, AP2-36, AP2-43, AP2-48 to AP2-51
Utility works
32, 67, 70, 90, 115, 118, 127, 138, 155, 169, 177, 195, 199, 201, 205, 206, 209, 228, 230, 238, AP2-16, AP2-26 to AP2-28, AP2-56 to AP2-60
Provision of environmental mitigation
197, AP2-9, AP2-24, AP2-34, AP2-40, AP2-54, AP2-55
Provision of environmental mitigation
Utility works
33
Provision of environmental mitigation
Highway works
43, 44, 49, 65, 65a, 66, 69, 71, 78, 82, 83, 109, 137, 185, 186, 193, 202, 212, 250
Worksite and access for construction
79a, 79b, 91, 113, 117
Provision of environmental mitigation
Worksite and access for construction
151, 158, 161, 165, 220, AP1-5
Highway works
214
Provision of environmental mitigation
Highway works
Worksite and access for construction
217, 218, 240, 242, AP2-45, AP2-47
Utility works
Worksite and access for construction
231, 236
Provision of railway infrastructure and access
Provision of environmental mitigation
Borough of East Staffordshire
Parish of Blithfield
1
Highway works
Parish of Abbots Bromley
AP2-1 to AP2-8, AP2-23, AP2-25, AP2-26, AP2-30, AP2-37, AP2-38, AP2-43, AP2-46, AP2-47, AP2-52, AP2-64, AP2-66, AP2-67, AP2-72, AP2-74, AP2-76, AP2-77, AP2-79, AP2-80, AP2-117, AP2-118
Provision of environmental mitigation
AP2-9, AP2-11, AP2-12, AP2-15, AP2-16, AP2-19, AP2-21, AP2-24, AP2-29, AP2-34, AP2-48, AP2-49, AP2-55, AP2-58, AP2-62, AP2-63, AP2-78, AP2-82, AP2-83, AP2-84, AP2-86 to AP2-90, AP2-93, AP2-93a, AP2-94, AP2-95, AP2-95a, AP2-96
Utility works
AP2-14, AP2-17, AP2-20, AP2-27, AP2-31, AP2-33, AP2-40, AP2-41, AP2-54, AP2-59, AP2-68, AP2-70
Provision of environmental mitigation
Utility works
AP2-44, AP2-60
Worksite and access for construction
AP2-98
Provision of environmental mitigation
Utility works
Worksite and access for construction
Parish of Hoar Cross
AP2-1, AP2-3
Utility works
AP2-5
Provision of environmental mitigation
Utility works
Worksite and access for construction
AP2-6 to AP2-9, AP2-34
Provision of environmental mitigation
Utility works
AP2-15, AP2-22, AP2-23, AP2-26
Provision of environmental mitigation
AP2-28, AP2-37, AP2-38
Worksite and access for construction
Parish of Newborough
AP2-1 to AP2-6, AP2-8
Provision of environmental mitigation Utility works
Borough of Stafford
Parish of Colwich
22, 142 to 144, 151
Provision of environmental mitigation
Worksite and access for construction
25, 52a, 54, 58, 64a, 76 to 79, 158, 220a
Provision of environmental mitigation
28, 30, 32, 33, 37, 40, 42, 52, 55, 57, 59, 60, 64, 65, 94c, 104, 107, 110, 161a, 177b, 180, AP1-2, AP1-4, AP1-9, AP1-11, AP1-13, AP1-19 to AP1-22, AP2-1, AP2-2, AP2-4, AP2-7a, AP2-11a, AP2-12, AP2-22, AP2-23, AP2-36 to AP2-38
Utility works
47, 83, 85, 86a, 95
Worksite and access for construction
Provision of a public right of way
49, 51, 86b, 86c, 86d, 99, 100, 133, 134, 140, 146, 159, 171, 172, 182a, 185, 187, 193, 198a, 199a, 201, 210, 212, 216a, 217, 224 to 228, AP2-8, AP2-9
Worksite and access for construction
69, 90a, 101a
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
94b, 103a, 103b, 109c, 109d, 111b, 112a, 121a, 129, 130, 157, 164, 167a, 170a, 184, 188, 197b, AP2-15, AP2-18, AP2-42, AP2-65 to AP2-67
Utility works
Worksite and access for construction
126a, 149a, 215a
Provision of railway infrastructure and access
Worksite and access for construction
132
Highway works
Worksite and access for construction
155
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
229 to 232
Provision of railway infrastructure and access
108a, 109b, AP2-31, AP2-34, AP2-35
Utility works
Creation of new rights of way
Parish of Hixon
1
Provision of railway infrastructure and access
2
Provision of railway infrastructure and accessWorksite and access for construction
Parish of Ingestre
1, 4, 5, 7a, 7b, 10, 11, 43, AP2-4, AP2-24
Utility works
12
Provision of environmental mitigation
Worksite and access for construction
14, 18, 21, 23, 30, 33
Provision of environmental mitigation
15
Highway works
16
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
19
Provision of railway infrastructure and access
Worksite and access for construction
20, AP2-2
Provision of environmental mitigation
Utility works
27
Worksite and access for construction
AP2-6, AP2-7, AP2-9 to AP2-11, AP2-13, AP2-14, AP2-14a, AP2-15
Utility works
Worksite and access for construction
AP2-18, AP2-19, AP2-21, AP2-22
Reinstatement of golf facilities
Parish of Tixall
4, 5, 39, 73, AP2-1, AP2-10, AP2-16
Utility works
7, 38, 43, AP2-12, AP2-13, AP2-15
Provision of railway infrastructure and access
Provision of environmental mitigation
8, 30, 36, 49, 51, 56, 57a, 60, 84
Worksite and access for construction
40
Highway works
15, 24, 62, AP2-3 to AP2-5
Utility works
Worksite and access for construction
20, 27, 33, 46, 47, 55, 61, 64, 67, 72
Provision of environmental mitigation
48
Provision of environmental mitigation
Worksite and access for construction
50
Provision of environmental mitigation
Utility works
Worksite and access for construction
63
Provision of railway infrastructure and access
Parish of Hopton and Coton
1, 15, 21, 28, 29, 32, 80, 103, 104a, 104b, 108a, 109a, 121a, 161, 173a, 175
Provision of environmental mitigation
34, 56, 81b, 89a, 93, 94a, 95, 96, 100b, 101b, 101c, 117, 166, 186a, AP2-12, AP2-17, AP2-56a, AP2-72
Worksite and access for construction
11, 16a, 17, 23a, 23b, 123a
Provision of railway infrastructure and access
Provision of environmental mitigation
36, 42, 44, 48, 66, 68, 72, 73, 84, 85, 99, 105, 148, 153, 156, 157, 163, 164, 180, 188, 194, AP1-12, AP1-14, AP1-15a, AP1-16, AP2-25, AP2-28, AP2-36, AP2-37, AP2-41, AP2-45 to AP2-48, AP2-59, AP2-60, AP2-62 to AP2-64, AP2-66, AP2-70, AP2-74, AP2-76 to AP2-79, AP2-81 to AP2-86, AP2-95, AP2-98
Utility works
18a, 19a, 64, AP2-3 to AP2-6, AP2-93
Utility works
Worksite and access for construction
33, 37a, 74, AP2-65
Provision of environmental mitigation
Utility works
35a
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
57, 181
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
60, 61, 63, 65
Provision of environmental mitigation
Provision of a public right of way
70, 116, 187
Provision of railway infrastructure and access
78, AP2-24
Highway works
91a, 92b, 97b, 100c, 183, 184a, AP2-31 to AP2-34
Provision of environmental mitigation
Worksite and access for construction
AP2-16, AP2-18, AP2-19, AP2-21
Reinstatement of business or facilities
AP2-92
Utility works
Provision of a public right of way
Parish of Salt and Enson
2, 3
Utility works
AP2-1
Worksite and access for construction
Parish of Marston
1, 44, 61, 70, 103, 105, 109, AP2-9, AP2-10
Provision of environmental mitigation
Worksite and access for construction
6, 43
Provision of railway infrastructure and access
7, 16, 29, 31, 36, 63, 74, 78, 82, 83, 110, AP1-3, AP1-5, AP1-6a, AP2-11, AP2-19, AP2-21, AP2-23, AP2-26, AP2-29 to AP2-32, AP2-33a, AP2-34
Utility works
12, 39, 46, 47, 50, 53, 56, 59, 60, 62, 64, 69, 75, 77, 94, 99, 104, 108
Provision of environmental mitigation
20, 54, 92
Provision of railway infrastructure and access
Worksite and access for construction
27, 49
Worksite and access for construction
42, AP1-1, AP1-2
Highway works
45
Worksite and access for construction
Provision of a public right of way
90
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
98
Provision of railway infrastructure and access
Provision of environmental mitigation
AP2-8
Provision of environmental mitigation
Utility works
AP2-22, AP2-24
Utility works
Worksite and access for construction
Parish of Creswell
AP2-3
Highway works
Parish of Whitgreave
3
Provision of environmental mitigation
Worksite and access for construction
4
Provision of environmental mitigation
AP2-2
Utility works
Worksite and access for construction
Parish of Stone Rural
1, 3, 10a, 30, 35, 40, 47, 59 to 61, 68, 88a, 113, 118, 119
Worksite and access for construction
4, 13, 24 to 26, 44a, 51, 55, 56, 74 to 76, 81a, 122, 123, 126, 153, 155, AP2-48, AP2-49
Provision of environmental mitigation
6
Worksite and access for construction
Provision of a public right of way
11a, 14, 17, 31, 41, 42, 70, 105, 128a
Provision of environmental mitigation
Worksite and access for construction
15, 18, 19a, 22, 23, 48, 135, 139, 140, AP1-2 to AP1-11, AP1-15, AP2-10, AP2-11, AP2-22, AP2-30a, AP2-31 to AP2-33, AP2-38, AP2-39, AP2-62, AP2-63, AP2-68, AP2-77, AP2-82, AP2-83
Utility works
20, 91, 92
Provision of railway infrastructure and access
Worksite and access for construction
37, 107a, 116a
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
54, 57
Provision of environmental mitigation
Provision of a public right of way
73a, 157
Provision of railway infrastructure and access
Provision of environmental mitigation
Utility works
Worksite and access for construction
77, 129
Provision of railway infrastructure and access
90a, 90b
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
131
Provision of railway infrastructure and access
Provision of environmental mitigation
AP2-3 to AP2-6, AP2-8, AP2-29, AP2-81, AP2-84, AP2-85
Utility works
Worksite and access for construction
AP2-57
Highway works
Utility works
AP2-58, AP2-59
Provision of environmental mitigation
Highway works
Utility works
AP2-72 to AP2-74
Provision of environmental mitigation
Provision of water treatment facility
Parish of Stone
5, 7
Provision of environmental mitigation
Worksite and access for construction
AP1-1, AP2-22a, AP2-26
Utility works
Parish of Chebsey
1, 3
Provision of environmental mitigation
4, 7, 11
Provision of railway infrastructure and access
Parish of Swynnerton
1, 221, 273, 274
Provision of railway infrastructure and access
13, 14, 28, 32, 34, 39, 40, 44, 60, 75, 83, 84, 98, 99, 107, 108, 111, 140, 169a, 170a, 188, 190 to 192, 199, 200, 204, 218, 223, 231, 234, 236, 237, 240, 242, 245, 247, 269, 278, 284a, 294, 308, 322, 324, 325, AP1-41, AP2-39
Provision of environmental mitigation
19, 23, 55, 56, 62, 92, 104, 112, 115, 117, 174, 179, 208, 219, 225, 246, 256, 264, 271, 272, 281, 283, 288, 290, 292, 293, 298, 329, AP1-72
Worksite and access for construction
35, 38, 41, 46, 51 to 53, 57, 109a, 121a, 122, 125, 165b, 196, 201, 228, 232, 241, 251 to 253, 266, 279, 282
Provision of environmental mitigation
Worksite and access for construction
63, 77, 81, 82, 85, 91b, 95, 97, 105, 118, 135, 144b, 144c, 144d, 146, 148, 153 to 155, 157, 159, 163, 175, 177, 257, 301, 309, 310, 316, 319, AP1-21, AP1-22, AP1-26, AP1-32, AP1-33, AP1-35, AP1-37, AP1-39, AP1-42, AP1-44, AP1-45, AP1-47, AP1-79, AP1-83 to AP1-88, AP2-3, AP2-4, AP2-13, AP2-14, AP2-21, AP2-22, AP2-27, AP2-30 to AP2-32, AP2-34, AP2-41, AP2-42, AP2-44, AP2-45
Utility works
64a, 261, AP1-4
Provision of railway infrastructure and access
Provision of environmental mitigation
67, 72a, 259
Provision of environmental mitigation
Utility works
Worksite and access for construction
68
Provision of environmental mitigation
Utility works
Worksite and access for construction
Provision of a public right of way
86, 88, 137, AP2-28
Utility works
Worksite and access for construction
132a
Provision of railway infrastructure and access
Provision of environmental mitigation
Utility works
Worksite and access for construction
149, 150, 156, 158
Utility works
Provision of a public right of way
151
Utility works
Worksite and access for construction
Provision of a public right of way
152a, 152b, 167, 168
Worksite and access for construction
Provision of a public right of way
202, 226, 227, 229, 230, 332a
Highway works
203, 326a
Provision of environmental mitigation
Highway works
207
Highway works
Worksite and access for construction
217
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
295a
Provision of railway infrastructure and access
Utility works
Worksite and access for construction
Provision of a public right of way
276, 300a, 300b
Provision of railway infrastructure and access
Worksite and access for construction
AP2-25, AP2-26, AP2-40
Provision of environmental mitigation
Utility works
AP2-66, AP2-68 to AP2-71
Provision of water treatment facility
AP2-67
Provision of environmental mitigation
Provision of water treatment facility
Parish of Standon
AP2-1, AP2-3, AP2-8, AP2-11
Provision of water treatment facility
AP2-5
Provision of environmental mitigation
Provision of water treatment facility
Borough of Newcastle-under-Lyme
Parish of Whitmore
1, 2, 38, 57, 62, 131, 133, 136, 137, 148a, 166, AP2-2
Worksite and access for construction
11, 13, 14, 18 to 20, 32, 44, 49, 66, 118, AP2-1, AP2-7, AP2-9
Utility works
16
Utility works
Worksite and access for construction
21
Provision of environmental mitigation
Highway works
Worksite and access for construction
23 to 25, 102, 134a, 141b, 142, 146a, 147a 152, 153, 158, 163, 165, 168, 169, 174
Provision of environmental mitigation
30
Highway works
27, 42, 91b, 139, 141d, 149a, 150, AP2-14
Provision of environmental mitigation
Worksite and access for construction
36
Provision of environmental mitigation
Highway works
120a
Provision of railway infrastructure and access
Provision of environmental mitigation
140, 143
Provision of environmental mitigation and installation of ground anchors
151, 159, 172, 173, 176, 177
Provision of railway infrastructure and access
114a
Provision of environmental mitigation
Creation of new rights of way
144a
Provision of railway infrastructure
Provision of environmental mitigation
Creation of new rights of way
Town of Newcastle-under-Lyme
AP2-6, AP2-7
Utility works
Parish of Maer
AP2-3, AP2-6
Highway works
Parish of Madeley
1, 2, 3, 23, 24, 26, 29, 34, 36, 37, 65, 81, 99 to 101, 134, 135, 147, 148, 174, 175, 183, 184, 191, 192, 199, 200, 219 to 221, 242, 243
Provision of railway infrastructure and access
5, 12a, 12b, 25, 30, 83, 85, 89, 91, 126, 139, 140, 156, 180, 185, 198, 251
Provision of environmental mitigation
Worksite and access for construction
6, 27, 40a, 45 to 47, 51, 52, 68, 71, 72, 74, 76, 78, 82, 102, 104, 109, 112, 116, 138, 177, 179, 188, 189, AP2-21, AP2-22
Provision of environmental mitigation
10b, 14, 15, 17, 18, 39, 57, 60, 61, 63, 73, 79, 90, 115, 117, 121, 129, 136, 186, 190, 193, 210, 211, 214, 216 to 218, AP2-49 to AP2-54
Worksite and access for construction
31, 37a, 77, 241
Provision of environmental mitigation
Worksite and access for construction
Borrow pit
35, 48
Utility works
Worksite and access for construction
69
Provision of railway infrastructure and access
Utility works
70
Borrow pit
92, 173, 209, AP2-10, AP2-12, AP2-13, AP2-35, AP2-36
Utility works
97, 144, 197, 202
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
152 to 155
Provision of railway infrastructure and access
Provision of environmental mitigation
203
Worksite and access for construction
Provision of a public right of way
206
Provision of environmental mitigation
Utility works
Worksite and access for construction
222, 232, 237
Provision of environmental mitigation
Highway works
AP2-2
Dewatering operations
AP2-14
Provision of environmental mitigation
Utility works
Unitary District of Shropshire
21 to 23
Provision of environmental mitigation
Highway works
Parish of Woore
26
Provision of environmental mitigation
Parish of Betley
1, AP2-1, AP2-3, AP2-5, AP2-6
Worksite and access for construction
2, 3, 5, 6a, 7, AP1-1
Utility works
8, 10, 11
Provision of railway infrastructure and access
County of Cheshire
Borough of Cheshire East
Parish of Checkley cum Wrinehill
1a, 3
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
4, 5, 26, 27
Provision of environmental mitigation
6, 7, 33
Utility works
14, 15, 28 to 32
Provision of railway infrastructure and access
16, 19
Worksite and access for construction
Provision of a public right of way
20, 24, AP2-1 to AP2-3, AP2-5, AP2-8, AP2-9
Worksite and access for construction
22e
Borrow pit
Provision of a public right of way
22b, 22c, 22d
Borrow pit
AP2-12
Utility works
Worksite and access for construction
Parish of Blakenhall
1b, 1c, 1d
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
1a, 31a, 136, 136a, 143
Provision of a public right of way
Worksite and access for construction
3a, 3c
Provision of environmental mitigation
Utility works
Worksite and access for construction
Creation of new rights of way
3b
Provision of environmental mitigation
Utility works
Worksite and access for construction
Borrow pit
4
Utility works
Borrow pit
5a, 97, 121, 124, 126, 141
Provision of environmental mitigation
7a, 7b, 7c, 10, 10a, 13, 50, 115, 123, 127, 130, AP2-1, AP2-2, AP2-5 to AP2-7, AP2-40, AP2-51, AP2-61
Utility works
Worksite and access for construction
8a, 8b, 9b, 9c
Utility works
Worksite and access for construction
Borrow pit
11a, 11b, 11c, 17b, 38b
Provision of railway infrastructure and access
Provision of environmental mitigation
Utility works
14a, 28a, 46, 52, 53a, 54
Provision of railway infrastructure and access
Provision of environmental mitigation
15a, 15b, 15c, 21a
Provision of environmental mitigation
Borrow pit
16, 18, 24, 25
Provision of railway infrastructure and access
19, 27, 31b, 31c, 49a, 60, 101a, 101b, 113a, 116, 120, 144, AP2-11, AP2-13, AP2-28, AP2-35
Worksite and access for construction
23
Borrow pit
7d, 29a, 35, 70, 74, AP1-1a, AP1-2a, AP1-4, AP1-6, AP1-8 to AP1-11, AP1-13, AP1-14a, AP1-18, AP1-19, AP2-23, AP2-27, AP2-66 to AP2-68
Utility works
65, 79a, 81b, 106a, 125, 131, AP2-56
Provision of environmental mitigation
Worksite and access for construction
66a
Provision of environmental mitigation
Highway works
Worksite and access for construction
68a
Provision of environmental mitigation
Highway works
85, 122, AP1-7a, AP1-7b
Provision of environmental mitigation
Utility works
86
Highway works
112, AP2-48
Provision of environmental mitigation
Utility works
Worksite and access for construction
135
Provision of environmental mitigation
Utility works
Provision of a public right of way
AP2-62, AP2-63, AP2-65
Highway works
Utility works
Parish of Hough
1
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
2
Worksite and access for construction
3, 6
Utility works
4, 5
Utility works
Provision of a public right of way
Parish of Chorlton
3, 57, 82, 92, 93
Provision of environmental mitigation
Worksite and access for construction
4, 39
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
5, 9, 74, AP1-4 to AP1-6, AP1-8, AP1-9, AP1-11, AP1-13 to AP1-19, AP2-4, AP2-6, AP2-8, AP2-9, AP2-11
Utility works
7, 90, 96, 97a, 98, 101, 102, 104, 106, 107, AP2-10
Worksite and access for construction
8, 8a, 23, 29
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
12, 48
Worksite and access for construction
Provision of a public right of way
16, 41, 44, 56, 59, 81, 84, 86
Provision of environmental mitigation
22, 34, 36, 46,
Provision of railway infrastructure and access
25
Highway works
Utility works
38
Provision of railway infrastructure and access
Provision of environmental mitigation
Worksite and access for construction
Provision of a public right of way
47
Provision of railway infrastructure and access
Worksite and access for construction
Provision of a public right of way
49
Provision of environmental mitigation
Provision of a public right of way
71, 73
Provision of environmental mitigation
Highway works
AP2-1, AP2-2
Utility works
Worksite and access for construction
AP2-5, AP2-7
Provision of environmental mitigation
Utility works
Parish of Basford
6, 7, 11, 48
Provision of environmental mitigation
Highway works
9, 13, AP1-1, AP1-5 to AP1-8, AP1-10 to AP1-12, AP1-14, AP1-15, AP1-22, AP2-1 to AP2-3
Utility works
14, 16, 19, 22, 44
Provision of environmental mitigation
Worksite and access for construction
18, 20, 40, 41, 55, 56, 59, 69, 72, 73, 76
Provision of environmental mitigation
23, 26, 27, 31, 37, 39, 43, 47, 63, 75, 78 to 81, 86, 88, 91a, 97, AP1-28, AP2-4, AP2-6 to AP2-10
Worksite and access for construction
32
Provision of environmental mitigation
Provision of a public right of way
33
Worksite and access for construction
Provision of a public right of way
57
Provision of railway infrastructure and access
Provision of environmental mitigation
66
Provision of railway infrastructure and access
Parish of Weston
1, 2, AP1-1, AP1-2
Utility works
Parish of Shavington cum Gresty
2 to 5, 5a, 6, AP2-2, AP2-3
Worksite and access for construction
7
Provision of environmental mitigation
Town of Crewe
3, 41
Worksite and access for construction
9, 16, 17, 19 to 22, 24, 26, 29 to 32, 34, 37, 38, AP2-4, AP2-8, AP2-9
Provision of railway infrastructure and access
Parish of Haslington
2
Provision of railway infrastructure and access
Parish of Moston
1
Provision of railway infrastructure and access
Town of Sandbach
2
Provision of railway infrastructure and access
Worksite and access for construction
5
Worksite and access for construction
6 to 9
Provision of railway infrastructure and access

---
Source: https://www.legislation.gov.uk/ukpga/2021/2/schedule/6/paragraph/wrapper2n1 (the official version)
Page: https://openlegislation.uk/high-speed-rail-west-midlands-crewe-act-2021/schedule-6/paragraph-wrapper2n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.