  "url": "https://openlegislation.uk/high-speed-rail-west-midlands-crewe-fees-for-requests-for-planning-approval-regulations-2021/schedule-2",
  "json_url": "https://openlegislation.uk/high-speed-rail-west-midlands-crewe-fees-for-requests-for-planning-approval-regulations-2021/schedule-2.json",
  "legislation": "uksi/2021/183",
  "legislation_title": "The High Speed Rail (West Midlands – Crewe) (Fees for Requests for Planning Approval) Regulations 2021",
  "legislation_url": "https://openlegislation.uk/high-speed-rail-west-midlands-crewe-fees-for-requests-for-planning-approval-regulations-2021",
  "path": "schedule/2",
  "kind": "schedule",
  "number": "2",
  "heading": "Table of fees payable",
  "text": "(1)\n(2)\nCategory of development for which approval is sought\nFee payable\n1. Plans and specifications for the following works\nA\n(i) Building works – the erection, construction, alteration or extension of a building, other than a temporary building and excluding anything in C below.\n(a) where no gross floor space is to be created by the development, £195;\n(b) where the area of the gross floor space to be created by the development does not exceed 40 square metres, £195;\n(c) where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £385;\n(d) where the area of gross floor space to be created by the development exceeds 75 square metres but does not exceed 3750 square metres £385 for each 75 square metres or part thereof of that area;\n(e) where the area of gross floor space to be created by the development exceeds 3750 square metres, £19,049; and an additional £115 for each 75 square metres or part thereof subject to a maximum of £250,000.\n(ii) Fences and walls – the erection, alteration or extension of any fence or wall (other than sight, noise or dust screens).\n(iii) Sight, noise or dust screens – the erection, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening and dust suppression.\n(iv) Artificial lighting equipment – the erection, alteration, extension or installation of lighting equipment.\nB Road vehicle park – does not include anything that is not a building.\n£195.\nC Earthworks – the erection, alteration or extension of any terracing, cuttings, embankments or other earth works\n£195 for each 0.1 hectares or part thereof of the site, subject to a maximum of £1,690.\nD\n(i) Telecommunication masts or pedestrian access to the railway line.\n£195.\n(ii) Transformers.\nThe criteria in (a) to (e) in category 1A apply for the calculation of the fee.\n2. Matters ancillary to development\nA. Handling of re-useable spoil or top soil – handling during removal, storage and re-use of any spoil or top soil removed during the course of carrying out the development.\n£195.\nB. Storage sites – sites on land within the Act limits at which materials are to be stored until used or re-used in carrying out the development or disposal as waste.\n£195.\nC. Construction camps – sites on land within the Act limits which are to be used for the residential accommodation of persons engaged in carrying out the development.\n£195.\nD. Works screening – the provision where necessary on land within the Act limits of any screening for working sites on such land required for the purpose of carrying out the development.\n£195.\nE. Artificial lighting – the use of artificial lighting on land within the Act limits for the purpose of carrying out the development.\n£195.\nF. Dust Suppression – the suppression caused by construction operations carried out on land within the Act limits for the purpose of carrying out the development.\n£195.\nG. Road mud control measures – the measures to be taken on land within the Act limits to prevent or reduce the carrying of mud on to any public highway as a result if carrying out the development.\n£195.\n3. Road Transport\nArrangements concerning road transport – the arrangements regarding the routes by which anything is to be transported on a highway by a large goods vehicle to a working or storage site; a site where it will be re-used; or a waste disposal site.\n£195.\n4. Waste and spoil disposal and excavations\nThe development to the extent it consists of waste and spoil disposal or the excavation of bulk materials from borrow pits.\n£195 for each 0.1 hectares or part thereof of the site area, subject to a maximum of £29,112.\n5. Bringing scheduled works or deposits into use\nArrangements for bringing into use scheduled works and depots.\n£195.\n6. Mitigation Schemes\nMeasures to mitigate the effect of the work or its operation on the local environment or local amenity (see paragraph 9(4)(b) of the Schedule).\n£195.\n7. Site restoration schemes\nA site restoration scheme.\n£195.\n8. Additional details\nA request for approval of additional details where that approval is required under paragraph 2(3), 3(4) or 7(4) of the Schedule.\n£97.\n9. Non-material changes\nThe request for a non-material change of any approval (paragraph 21 of the Schedule).\n£195.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "See paragraph 6(7) of Schedule 17 to the High Speed Rail (West Midlands – Crewe) Act 2021 where this term is defined."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2021/183/schedule/2",
    "retrieved_at": "2026-10-28T22:17:06.317381+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}