{
  "url": "https://openlegislation.uk/highland-council-uig-isle-of-skye-harbour-revision-order-2020/article-3",
  "json_url": "https://openlegislation.uk/highland-council-uig-isle-of-skye-harbour-revision-order-2020/article-3.json",
  "legislation": "ssi/2020/173",
  "legislation_title": "The Highland Council (Uig, Isle of Skye) Harbour Revision Order 2020",
  "legislation_url": "https://openlegislation.uk/highland-council-uig-isle-of-skye-harbour-revision-order-2020",
  "path": "article/3",
  "kind": "article",
  "number": "3",
  "heading": "Power to construct works",
  "text": "(1) Without affecting the powers which may be exercisable by the Council under section 5 of the 1991 Order, the Council may in the lines and situations and upon the lands delineated on sheet 1, and within the limits of deviation, and according to the levels shown on the deposited sections or elevations for each work, construct and maintain in the harbour the following works, with all necessary works and conveniences connected with them—\nWork No. 1 – A widening and extension of the existing berthing structure on the western side and to the south of the existing structure formed of solid construction and incorporating scour protection and a wave protection wall the location of which is shown on sheet 1 and the section of which is shown on sheet 2. Sited on Work No. 1—\n(a) a passenger waiting shelter (relocated from its location on the existing berthing structure), and\n(b) a fuel tank for vessels,\nthe locations of which on Work No. 1 are shown on sheet 1 and elevations of which are shown on sheets 3 and 4.\nWork No. 2 – A widening of King Edward Pier of open pile construction on the northern side the location of which is shown on sheet 1 and a section of which is shown on sheet 2.\nWork No. 3 – A mechanically operated single deck linkspan, providing access to and from vessels, being a replacement of the existing linkspan and extending from King Edward Pier including supporting piled bankseat and lifting frame and supporting dolphin structures, the location of which is shown on sheet 1 and a section of which is shown on sheet 2.\n(2) The Council may, for the purposes of the works authorised by paragraph (1), demolish and remove the whole or part of any structures or apparatus lying within the limits of deviation and enclose and reclaim so much of the bed of the harbour and of the foreshore as lies within the limits of deviation and may hold and use the same as part of the harbour and so much of the seabed and of the foreshore as may be reclaimed shall be deemed to be operational land within the meaning of section 215 of the Town and Country Planning (Scotland) Act 1997.\n(3) Without affecting the general power conferred under paragraph (2), the Council may in connection with the construction of the works on any land owned by it, demolish and remove so much of—\n(a) the existing linkspan, the location of which is shown on sheet 1, and\n(b) the existing passenger waiting shelter, the location of which is shown on sheet 1,\nas may be required.\n(4) Subject to the provisions of this Order, the Council may, within the limits of deviation, reconstruct, extend, enlarge, replace or relay the works authorised by paragraph (1) and may maintain the same as reconstructed, extended, enlarged, replaced or relaid.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ssi/2020/173/article/3",
    "retrieved_at": "2026-10-28T21:02:03.078805+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}