Article 5 Water rights
(1)
During the construction of the works the Council may take from the said Abhainn Shlatach such water as they may require for such construction.
(2)
After the completion of the works the Council shall not—
(a)
take any water from the said Abhainn Shlatach so as to reduce the rate of flow therein below 450 cubic metres in any one day as measured through or over an approved gauge (part of Work No. 2);
(b)
in any one day take from the said Abhainn Shlatach a quantity of water greater than 100 cubic metres as measured through or over an approved gauge (part of Work No. 2).