OpenLegislation

Article 5 Water rights

Original text. Later amendments are not shown.

(1)

During the construction of the works, the Council may take from the said Allt Bail'an Tuim Bhuidhe such water as they may require for such construction.

(2)

After completion of the works the Council shall not—

(a)

take any water into supply from the said Allt Bail'an Tuim Bhuidhe through a chamber (Work No.2) so as to reduce the rate of flow through the discharge pipe (Work No.4) below 90 cubic metres per day as measured through or over an approved gauge (part of Work No.2);

(b)

in any one day take into supply from the said Allt Bail'an Tuim Bhuidhe through a chamber (Work No.2) a quantity of water greater than 50 cubic metres per day as measured through or over an approved gauge (part of Work No. 2).