Article 5 Water rights
(1)
During the construction of the works the Council may take from the said Allt Sannasuch water as they may require for such construction.
(2)
After the completion of the works the Council shall not—
(a)
take any water from the said Allt Sanna so as to reduce the rate of flow therein below 500 cubic metres in any one day as measured through or over an approved gauge (part of Work No. 2);
(b)
in any one day take from the said Allt Sanna a quantity of water greater than 70 cubic metres as measured through or over an approved gauge (part of Work No. 2).