# The Highland Regional Council (Loch Beannach) Water Order 1989, Article 5: Water rights


(1) During the construction of the works the Council may take from the said Loch Beannach such water as they may require for such construction.
(2) After the completion of the works the Council shall—
(a) in any day take from the said Loch Beannach sufficient water which, when discharged from Work No. 5 into the unnamed burn flowing south-westwards from the south-west side of the said Loch Beannach, will ensure a uniform and continuous flow of not less than 500 cubic metres in the said burn, measured through or over an approved gauge (part of Work No. 3);
(b) in any day take into supply from the said Loch Beannach an additional quantity of water not greater than 900 cubic metres as measured through or over an approved gauge (part of Work No. 4).

---
Source: https://www.legislation.gov.uk/uksi/1989/204/article/5 (the official version)