Schedule 1
The works referred to in this Order and shown on the deposited plan marked “The Highland Regional Council (Loch Lannsaidh) Water Order 1990 Plans & Sections of Works” are–
-
Work No. 1 An existing reservoir (Loch Lannsaidh Reservoir) commencing at the dam (Work No. 2) and extending over Loch Lannsaidh.
-
Work No. 2 An existing dam, with overflow sill level 152.23 metres or thereby above Ordnance Datum situated at the south-western end of Loch Lannsaidh.
-
Work No. 3 An existing intake with invert level 150.73 metres or thereby above Ordnance Datum situated 85 metres or thereby north-east of Work No. 2 (NGR NH 7354 9431).
-
Work No. 4 An approved gauge situated on the Allt Loch Lannsaidh 40 metres or thereby downstream from Work No. 2.
-
Work No. 5 An intake with invert level 150.73 metres or thereby above Ordnance Datum and channel extending west for a distance of 38 metres or thereby and a pumping station situated on the eastern side of Loch Lannsaidh (NGR NH 7395 9451).
-
Work No. 6 A chamber incorporating an approved gauge situated 20 metres or thereby south-west of Work No. 3, and an existing pipe connecting to Work No. 3.
-
Work No.7 An approved gauge situated within the pumping station (Part of Work No. 5).
-
Work No. 8 An existing pipe and channel commencing 53 metres east of Work No. 4 and extending north-west for a distance of 36 metres or thereby to its junction with the Allt Loch Lannsaidh.