Explanatory note
(This note is not part of the Instrument)
This Instrument confirms a Scheme to construct four new special roads at the location of Junction 10 of the M6 in the Metropolitan Borough of Walsall.
The Secretary of State has modified this Special Road Scheme as follows:
Article 1 “This Scheme may be cited as The M6 Junction 10 (Slip Roads, Special Roads) Scheme 2018 and this Scheme shall become operative on the date on which the Secretary of State publishes a notice in accordance with paragraphs 1 & 4 of Schedule 2 of the Highways Act 1980 stating that it had been confirmed” is deleted. The subsequent paragraphs are renumbered accordingly.
Under “the deposited plan” the words ‘Special Roads, Side Roads’ are deleted and replaced with “Slip Roads, Special Roads”.
Under “the new highways” there are brackets placed before and after the words “M6 Junction 10” to accord with the related Side Roads Order title.
The number (i) before “the special roads” is replaced by (vi).