# The Highways England M58 Junction 1 Improvement (Special Roads) Scheme 2020 Confirmation Instrument 2021, Note: Explanatory note


(This note is not part of the Instrument)
This Instrument confirms a Scheme to provide two new special roads at the location of Junction 1 of the M58 Motorway in the Parish of Maghull, in the Borough of Sefton in the County of Merseyside.
The Secretary of State has modified this Special Roads Scheme as follows:
1. “THE SCHEDULE” is amended to “THE SCHEDULE TO THE SCHEME”.
2. In the Schedule to the Scheme in the first paragraph the wording “the construction of which is authorised by a planning permission granted by Sefton MBC on 18th October 2017 under reference DC/2017/00953” is deleted.
3. In the Schedule to the Scheme in both descriptions 1 and 2 the wording “provided by means of appropriation as a special road by Highways England by an order under section 18 of the Act” is deleted.

---
Source: https://www.legislation.gov.uk/uksi/2021/596/note (the official version)