# The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018

S.I. 2018/413 · made 23 March 2018

This Order amends the Hinkley Point C (Nuclear Generating Station) Order 2013 (“the 2013 Order”), a development consent order under the Planning Act 2008 (“the Act”), which has previously been amended by the Hinkley Point C (Nuclear Generating Station) (Correction) Order 2013, the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 and the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2017.

Made under: Planning Act 2008 (Schedule 6 paragraph 2)

PDFs: Printed copy https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-amendment-order-2018/pdf/uksi_20180413_en.pdf

## Introductory text

Infrastructure Planning
Made 23rd March 2018
Coming into force 24th March 2018
An application has been made under paragraph 2 of Schedule 6 to the Planning Act 2008 to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change to the Hinkley Point C (Nuclear Generating Station) Order 2013.
The Secretary of State, having considered the application and the responses to the publicity and consultation carried out in accordance with regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the Hinkley Point C (Nuclear Generating Station) Order 2013.
The Secretary of State, in exercise of the powers conferred by paragraph 2 of Schedule 6 of the Planning Act 2008, makes the following Order:

## 1 Citation and commencement

This Order may be cited as The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 and shall come into force on 24th March 2018.

## 2 Amendment of The Hinkley Point C (Nuclear Generating Station) Order 2013

The Hinkley Point C (Nuclear Generating Station) Order 2013 (“the Order”) is amended as follows.

## 3 Amendment to Part 1 (Authorised development) of Schedule 1 (Authorised project)

(1) In Part 1 of Schedule 1 to the Order the description of Work No. 1A is amended as follows:
(2) In paragraph (d)(i)—
(a) after “Effluent Tanks” insert “and Refuelling Water Storage Tank”;
(b) after “Battery Load Bank;” insert “and”;
(c) after “Cooling Water Discharge Weir (Buildings)” omit “and Refuelling Water Storage Tank;”.
(3) In paragraph (h)—
(a) after “Service Access Buildings;” omit “and”;
(b) in the list below “Service Access Buildings;”, insert “Underground Tunnel High Points;”; and
(c) in the list, below “Services Ventilation Building;” insert—
“Back Up Containerised Generators; and
Valve Room for Demineralisation Station.”

## 4 Amendment to Part 2 (Temporary jetty works) of Schedule 1 (Authorised project)

(1) Part 2 of Schedule 1 to the Order is amended as follows.
(2) In the description of Work No. TJ1 after “elevated roadway” insert “and drainage infrastructure (including pipework and outfalls)”.

## 5 Amendment to Part 3 (Approved plans) of Schedule 1 (Authorised project)

(1) Part 3 of Schedule 1 to the Order is amended as follows.
(2) For the tables and headings listed under the heading “HPC Development Site”, up to the heading “HPC accommodation campus”, substitute the list in the Schedule to this Order.

## 6 Amendment to Schedule 2 (Requirements)

(1) Schedule 2 to the Order is amended as follows.
(2) In the table at paragraph 2—
(a) In sub-paragraph (2) of requirement PW3, for “(Rev 02)” substitute “(Rev 03)”;
(3) In the table at paragraph 3—
(a) In sub-paragraph (2) of requirement P10, after “Environmental Statement” insert “and may include pipework attaching to the temporary jetty leading to an outfall at the temporary jetty head,” and after “and shall” include “(except in relation to discharge from the temporary jetty head)”;
(4) In the table at paragraph 4—
(a) In sub-paragraph (3) of requirement MS4, for “and 1C” substitute “, 1C and TJ1”;
(b) After requirement MS17 insert new row—
“
MS18
Back Up Containerised Generators
(1) Construction of the Back Up Containerised Generators (comprised in Work No. 1A(h)) shall not commence until details of their layout, scale and external appearance have been submitted to and approved by West Somerset District Council.
(2) The details referred to in paragraph (1) shall be in accordance with parameter plans HINK-A2-LLY-00-GA-001 (Rev 01); HINK-A2-LLV-00-GA-001 (Rev 01); and HINK-A2-LLW-00-GA-001 (Rev 01).
(3) The works shall be carried out in accordance with the approved details.
”;
(c) In sub-paragraph (2) of requirement MS19, for “(Rev 02)” substitute “(Rev 03)”; and
(d) In sub-paragraph (2) of requirement MS21, for “(Rev 02)” substitute “(Rev 03)”.

## 7 Certification of revised or substituted plans

(1) The undertaker shall, as soon as practicable after the making of this Order, submit copies of any revised or substituted plans to the Secretary of State for certification that they are true copies of the plans referred to in this Order.
(2) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
(3) In paragraph (1), the “undertaker” has the same meaning as in article 2(1) of the Order.

## Signature

Signed on behalf of the Secretary of State for Business, Energy and Industrial Strategy
Gareth Leigh
Head of Energy Infrastructure Planning
Department for Business, Energy and Industrial Strategy
23rd March 2018

## Approved plans to be substituted into Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order

HPC Permanent Development Site
Site Plans
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-SL-00-GA-002
03
HPC Site Parameter Plan
1:1000
A0
HINK-A1-SL-00-GA-010
03
Site Layout Plan (Operational)
1:2500
A1
Nuclear Island (Unit 1)
Unit 1: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 2
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HR-01-GP-090
03
Roof Plan
1:200
A0
HINK-A2-HR-01-GE-001
03
South and West Elevations
1:200
A0
HINK-A2-HR-01-GE-002
03
North and East Elevations
1:200
A0
HINK-A2-HR-01-DT-001
02
Part Elevation Detail
1:50
A0
Radioactive Waste Storage / Radioactive Waste Process Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HQ-00-GA-001
01
Roof Plan and Elevations
1:200
A0
HINK-A2-HQ-00-DT-001
01
Part Elevation Detail
1:50
A0
Hot Laundry / Hot Workshop / Hot Warehouse / Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HV-00-GP-020
03
Roof Plan
1:200
A1
HINK-A2-HV-00-GE-001
03
Elevations
1:200
A1
HINK-A2-HV-00-DT-001
03
Part Elevation Detail
1:50
A1
Emergency Diesel Generator – A / Cooling Water Discharge Weir Building/ Underground Tunnel Highpoint
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HD-01-GP-040
03
Roof Plan
1:200
A1
HINK-A2-HD-01-GE-001
03
Elevations
1:200
A1
HINK-A2-HD-01-DT-001
03
Part Elevation Detail
1:50
A1
Emergency Diesel Generator – B / Cooling Water Discharge Weir Building / Battery Load Bank
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HD-02-GP-040
03
Roof Plan
1:200
A1
HINK-A2-HD-02-GE-001
03
Elevations
1:200
A1
HINK-A2-HD-02-DT-001
03
Part Elevation - Detail
1:50
A1
Service Access Building 1
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HGC-00-GA-001
02
Roof Plan & Elevations
1:100
A1
Nuclear Island (Unit 2)
Unit 2: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 3
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HR-02-GP-090
03
Roof Plan
1:200
A0
HINK-A2-HR-02-GE-001
03
South and West Elevations
1:200
A0
HINK-A2-HR-02-GE-002
03
North and East Elevations
1:200
A0
HINK-A2-HR-02-DT-001
02
Part Elevation Detail
1:50
A0
Radioactive Waste Treatment Building / Battery Load Bank
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HQC-00-GP-040
02
Roof Plan
1:100
A1
HINK-A2-HQC-00-GE-001
02
Elevations
1:100
A1
HINK-A2-HQC-00-DT-001
02
Part Elevation Detail
1:50
A1
Emergency Diesel Generator – C / Cooling Water Discharge Weir Building/ Underground Tunnel Highpoint
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HD-03-GP-040
03
Roof Plan
1:200
A1
HINK-A2-HD-03-GE-001
03
Elevations
1:200
A1
HINK-A2-HD-03-DT-001
03
Part Elevation Detail
1:50
A1
Emergency Diesel Generator – D / Cooling Water Discharge Weir Building/ Battery Load Bank
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HD-04-GP-040
03
Roof Plan
1:200
A1
HINK-A2-HD-04-GE-001
03
Elevations
1:200
A1
HINK-A2-HD-04-DT-001
03
Part Elevation Detail
1:50
A1
Service Access Building 4
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HGB-00-GA-001
02
Roof Plan & Elevations
1:100
A1
Conventional Island (Unit 1)
Unit 1: Turbine Hall
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-HM-01-GA-006
02
Roof Plan, North and South Elevations
1:200
A0
HINK-A1-HM-01-GE-001
02
West and East Elevations
1:200
A0
HINK-A1-HM-01-DT-001
01
Part Elevation Detail
1:50
A0
Unit 1: Sky Bridges
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-BR-01-GP-010
01
Roof Plan
1:100
A1
HINK-A1-BR-01-GE-001
01
North and South Elevations
1:100
A1
HINK-A1-BR-01-GE-002
01
East and West Elevations
1:100
A1
HINK-A1-BR-01-DT-001
01
Part Elevation Detail
1:50
A1
Unit 1: Non Classified Electrical Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HF-01-GP-030
02
Roof Plan
1:100
A1
HINK-A2-HF-01-GE-001
02
South Elevation
1:100
A1
HINK-A2-HF-01-GE-002
02
North and East Elevations
1:100
A1
HINK-A2-HF-01-DT-001
02
Part Elevation Detail
1:50
A1
Unit 1: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HT-01-GP-003
02
Roof Plan
1:200
A1
HINK-A2-HT-01-GE-001
02
Elevations
1:200
A1
HINK-A2-HT-01-DT-001
02
Part Elevation - Detail
1:50
A1
Unit 1: Hydrazine Storage
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-SIR-01-GA-001
01
Roof Plan and Elevations
1:100
A1
Conventional Island (Unit 2)
Unit 2: Turbine Hall
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-HM-02-GA-006
02
Roof Plan, North and South Elevations
1:200
A0
HINK-A1-HM-02-GE-001
02
West and East Elevations
1:200
A0
HINK-A1-HM-02-DT-001
01
Part Elevation Detail
1:50
A0
Unit 2: Sky Bridges
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-BR-02-GP-010
01
Roof Plan
1:100
A1
HINK-A1-BR-02-GE-001
01
North and South Elevations
1:100
A1
HINK-A1-BR-02-GE-002
01
East and West Elevations
1:100
A1
HINK-A1-BR-02-DT-001
01
Part Elevation Detail
1:50
A1
Unit 2: Non Classified Electrical Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HF-02-GP-030
02
Roof Plan (Lev 10.70m)
1:100
A1
HINK-A2-HF-02-GE-001
02
South Elevation
1:100
A1
HINK-A2-HF-02-GE-002
02
North and West Elevations
1:100
A1
HINK-A2-HF-02-DT-001
02
Part Elevation Detail
1:50
A1
Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HT-02-GP-003
02
Roof Plan
1:200
A1
HINK-A2-HT-02-GE-001
02
Elevations
1:200
A1
HINK-A2-HT-02-DT-001
02
Part Elevation - Detail
1:50
A1
Operations
Operational Service Centre
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-HB-00-GP-090
01
Roof Plan
1:200
A1
HINK-A1-HB-00-GE-001
01
North and South Elevations
1:200
A1
HINK-A1-HB-00-GE-002
01
East and West Elevations
1:200
A1
HINK-A1-HB-00-DT-001
01
Part Elevation Detail
1:50
A1
Cooling Water Pumphouse and Associated Buildings (Unit 1)
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond / Service Access Buildings 5 & 7
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HP-01-GP-030
03
Roof Plan
1:200
A0
HINK-A2-HP-01-GE-001
03
Elevations
1:200
A0
HINK-A2-HP-01-DT-001
03
Part Elevation - Detail
1:50
A0
Unit 1: Fire-Fighting Water Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HOJ-01-GA-003
03
Roof Plan and Elevations
1:200
A1
HINK-A2-HOJ-01-DT-001
03
Part Elevation - Detail
1:50
A1
Discharge Shaft (Units 1 & 2)
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HCT-00-GA-001
01
Roof Plan & Elevations
1:100
A1
Cooling Water Pumphouse and Associated Buildings (Unit 2)
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond / Service Access Buildings 6 & 8
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HP-02-GP-030
03
Roof Plan
1:200
A0
HINK-A2-HP-02-GE-001
03
Elevations
1:200
A0
HINK-A2-HP-02-DT-001
03
Part Elevation Detail
1:50
A0
Unit 2: Fire-Fighting Water Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HOJ-02-GA-003
03
Roof Plan and Elevations
1:200
A1
HINK-A2-HOJ-02-DT-001
03
Part Elevation Detail
1:50
A1
Remaining Balance of Plant and Other Plant (Unit 1)
Unit 1: Hydrogen Storage
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HZH-01-GA-002
02
Roof Plan and Elevations
1:100
A1
Unit 1: Oxygen Storage
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HZO-01-GA-002
01
Roof Plan and Elevations
1:100
A1
Remaining Balance of Plant and Other Plant (Unit 2)
Unit 2: Hydrogen Storage
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HZH-02-GA-002
02
Roof Plan & Elevations
1:100
A1
Unit 2: Oxygen Storage
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HZO-02-GA-002
01
Roof Plan and Elevations
1:100
A1
Remaining Balance of Plant and Other Plant (Shared Between both Units)
Demineralisation Station
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HY-00-GP-030
02
Roof Plan
1:100
A1
HINK-A2-HY-00-GE-001
02
North and South Elevations
1:100
A1
HINK-A2-HY-00-GE-002
02
East and West Elevations
1:100
A1
HINK-A2-HY-00-DT-001
02
Part Elevation Detail
1:50
A1
Auxiliary Boilers
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HVB-00-GA-004
01
Roof Plan
1:100
A1
HINK-A2-HVB-00-GE-001
01
Elevations
1:100
A1
HINK-A2-HVB-00-DT-001
01
Part Elevation Detail
1:50
A1
Chemical Products Storage
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HZC-00-GA-001
01
Roof Plan and Elevations
1:100
A1
HINK-A2-HZC-00-DT-001
01
Part Elevation Detail
1:50
A1
Sewage Treatment Plant
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-STP-00-GA-001
01
Plans and Elevations
1:100
A1
Conventional Island Water Storage Tank – A
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-SER-01-GA-002
01
Roof Plan and East Elevation
1:200
A1
Conventional Island Water Storage Tank – B
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-SER-02-GA-002
01
Roof Plan and East Elevation
1:200
A1
Nuclear Island Water Storage Tank
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-SED-00-GA-002
01
Roof Plan and South and East Elevations
1:100
A1
Degassed Water Storage Tanks/ Valve Room
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-REA-00-GA-001
02
Plan and Elevations
1:200
A1
Fuel Waste and Storage
Interim Spent Fuel Store
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HHK-00-GP-000
01
Plan
1:200
A0
HINK-A2-HHK-00-GE-001
01
North and South Elevations
1:200
A0
HINK-A2-HHK-00-GE-002
01
East and West Elevations
1:200
A0
Access Control Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HUD-00-GA-001
01
Plans and Elevations
1:100
A1
Intermediate Level Waste Interim Storage Facility
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HHI-00-GA-002
01
Roof Plan and Elevations
1:200
A0
HINK-A2-HHI-00-DT-001
01
Part Elevation Detail
1:50
A0
Ancillary, Office and Storage
Main Access Control Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HU-00-GP-010
01
Roof Plan
1:100
A1
HINK-A2-HU-00-GE-001
01
Elevations
1:100
A1
HINK-A2-HU-00-DT-001
01
Part Elevation Detail
1:50
A1
Entry Relay Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-ERB-00-GA-002
01
Roof Plan and Elevations
1:100
A1
HINK-A2-ERB-00-DT-001
01
Part Elevation Detail
1:50
A1
Off-site Vehicle Search Area
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-VSA-00-GA-001
02
Roof Plan and Elevations
1:50
A1
Auxiliary Administration Centre
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HUC-00-GP-020
03
Roof Plan
1:100
A1
HINK-A2-HUC-00-GE-001
03
North and South Elevations
1:100
A1
HINK-A2-HUC-00-GE-002
03
East and West Elevations
1:100
A1
HINK-A2-HUC-00-DT-001
03
Part Elevation
1:50
A1
EDF Site Offices
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HAO-00-GE-001
02
Roof & Elevations
1:200
A1
HINK-A2-HAO-00-DT-001
02
Part Elevation Detail
1:50
A1
Garage for Handling Facilities
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HBG-00-GP-010
01
Roof Plan
1:100
A1
HINK-A2-HBG-00-GE-001
01
Elevations
1:100
A1
HINK-A2-HBG-00-DT-001
01
Part Elevation Detail
1:50
A1
Oil and Grease Storage and Oil Ancillary Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HOG-00-GA-002
01
Roof Plan
1:100
A1
HINK-A2-HOG-00-GE-001
01
North and South Elevations
1:100
A1
HINK-A2-HOG-00-GE-002
01
East and West Elevations
1:100
A1
HINK-A2-HOG-00-DT-001
01
Part Elevation Detail
1:50
A1
AREVA Warehouse
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HBW-00-GP-010
01
Roof Plan
1:200
A1
HINK-A2-HBW-00-GE-001
01
Elevations
1:200
A1
HINK-A2-HBW-00-DT-001
01
Part Elevation Detail
1:50
A1
Meteorological Station
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HSM-00-GA-002
01
Roof Plan and Elevations
1:50
A1
Outage Access Control Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-TU1-00-GA-002
01
Roof Plan and Elevations
1:100
A1
HINK-A2-TU1-00-DT-001
01
Part Elevation Detail
1:50
A1
Contaminated Tools Storage
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HHC-01-GA-002
02
Roof Plan and Elevations
1:200
A1
HINK-A2-HHC-01-DT-001
02
Part Elevation Detail
1:50
A1
Conventional Waste Storage
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-CWS-00-GA-002
01
Roof Plan and Elevations
1:200
A1
Transit Area for Very Low Level Waste and Low Level Waste
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HHL-00-GE-001
01
Elevations
1:100
A1
Raw Water and Potable Water Supply
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HOR-00-GA-001
02
Roof Plan
1:100
A0
HINK-A2-HOR-00-GA-002
02
Elevations
1:100
A0
HINK-A2-HOR-00-DT-001
02
Part Elevation Detail
1:50
A1
Emergency Response Store
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HHE-00-GA-001
01
Roof Plan & Elevations
1:200
A1
HINK-A2-HHE-00-DT-001
01
Part Elevation Detail
1:50
A1
Services Ventilation Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HGM-00-GA-001
01
Roof Plan & Elevations
1:100
A1
Public and Training
Simulator Building / Training Centre
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-HBS-00-GP-020
01
Roof Plan
1:200
A1
HINK-A1-HBS-00-GE-001
01
Elevations
1:200
A1
HINK-A1-HBS-00-DT-001
01
Part Elevation Detail
1:50
A1
Public Information Centre
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-PIC-00-GP-040
01
Roof Plan
1:100
A1
HINK-A1-PIC-00-GE-001
01
North and West Elevations
1:100
A1
HINK-A1-PIC-00-GE-002
01
South and East Elevations
1:100
A1
HINK-A1-PIC-00-DT-001
01
Part Elevation Detail
1:50
A1
National Grid Substation
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-SS-00-GP-010
01
Roof Plan
1:200
A0
HINK-A2-SS-00-GE-001
01
Elevations
1:200
A0
HINK-A2-SS-00-DT-001
01
Part Elevation Detail
1:50
A0
Other Site Structures
Sea Wall (Incorporating Coastal Footpath)
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-HSW-00-GA-001
02
Plans
1:500
A0
HINK-A2-HSW-00-GA-002
01
North Elevation
1:50
A0
HINK-A2-HSW-00-GA-003
01
Detail Plans and Elevations
1:50
A0
HINK-A2-HSW-00-GA-004
02
Detail Plan and Elevation
1:100
A0
EDF Energy Pylons
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A1-PL-00-GA-001
01
Location Plan, Plans, Elevations and Axonometric
Various
A1
Back Up Power Containerised Generator 1 - Near to the Main Access Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-LLY-00-GA-001
01
Plan and Elevations
1:100
A1
Back Up Power Containerised Generator 2 - Near to the Operational Service Building
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-LLV-00-GA-001
01
Plan and Elevations
1:100
A1
Back Up Power Containerised Generator 3 – Near to the Areva Warehouse
Drawing number
Rev
Drawing title
Scale
>Paper size
HINK-A2-LLW-00-GA-001
01
Plan and Elevations
1:100
A1
Highways Plans
Drawing number
Rev
Drawing title
Scale
>Paper size
HPC-GEN124-RI-RFC-DRW-000045
01
Northern Roundabout Proposed Layout
1:500
A1
HPC-GEN124-RI-RFC-DRW-000046
01
Vehicle Search Area Layby and Turning Head Proposed Layout
1:250
A1
HPC-GEN124-RI-RFC-DRW-000047
01
Southern Roundabout Proposed Layout During Operation
1:500
A1
HPC-GEN124-RI-RFC-DRW-000048
01
Southern Roundabout Proposed Layout During Construction
1:500
A1
HPC-GEN124-RI-RFC-DRW-000049
01
Emergency Access Road Junction with Existing Highway Proposed Layout
1:250
A1
Site Preparation Plans
Drawing number
Rev
Drawing title
Scale
>Paper size
HPCSPW002a Rev1
01
Site Layout Plan
1:3500
A1
HPCSPW002b
00
Beach Access Road Plan and Cross Sections
1:250 / 1:50
A1
HPCSPW004 Rev1
01
Planning Application Fencing Arrangement (Sheet 1 of 3)
1:3500
A1
HPCSPW005 Rev1
01
Fencing Enlarged Detail West (Sheet 2 of 3)
1:1500
A1
HPCSPW006 Rev1
01
Fencing Enlarged Detail East (Sheet 3 of 3)
1:1500
A1
HPCSPW007 Rev1
01
Indicative Earthworks Cut and Fill Arrangement
1:3500
A1
HPCSPW008
00
Early Works Water Management Zone
1:2500
A1
HPCSP009 Rev1
01
Surface Water Catchment Area Overall General Arrangement
1:3000
A1
HPCSPW010
00
Arrangement of Construction Drainage Outfall to Foreshore
1:75
A1
HPCSPW011 Rev1
01
Surface Water Drainage Holford Stream Culvert
1:1500 / 1:150
A1
HPCSPW012a
00
Deep Water Drainage Arrangement
1:2000 / 1:100
A1
HPCSPW012b
00
Deep Water Arrangement Spine Drain Sections A and B
1:200
A1
HPCSPW012c
00
Deep Water Assessment Spine Drain Sections C
1:200
A1
HPCSPW013b
00
Typical Cross Section Through Haul Road
1:50
A1
HPCSPW014
00
11kv Sub Station Plan and Elevations
1:100
A1
HPCSPW015
00
Raw Water Reservoir Plans and Sections
1:150
A1
HPCSPW016 Rev1
01
Surface Water Drainage in the Built Development Areas
1:1750
A1
HPCSPW017
00
Site Access Control Arrangement, Floor and Elevation
1:50
A1
HPCSPW019 Rev1
01
Landscape Proposal Plan
1:5000
A1
HPCSPW022
00
Proposed Sewage Treatment Plant – Plans and Sections
1:100
A1
HPCSPW023a
00
Existing and Reinstated Ground Level Cross Sections
1:2500 / 1:500
A1
HPCSPW023b
00
Earthworks Platforms Cross Sections
1:2500 / 1:500
A1
HPCSPW025a Rev2
02
Tree and Hedgerow Retention and Removal
1:4000
A1
HPCSPW025b Rev1
01
Proposed Advanced Planting, Plan
1:1000
A1
HPCSPW026
00
Primary and Secondary Access Tracks
1:3500
A1
HPCSPW027
00
NW Boundary Mitigation During Construction Cross Sections A and B
1:200
A1
HPCSPW028
00
NW Boundary Mitigation During Construction Cross Sections C and D
1:200
A1
HPCSPW029
00
NW Boundary Mitigation During Construction Planting Plan
1:750
A1

## Explanatory note

(This note is not part of the Order)
This Order amends the Hinkley Point C (Nuclear Generating Station) Order 2013 (“the 2013 Order”), a development consent order under the Planning Act 2008 (“the Act”), which has previously been amended by the Hinkley Point C (Nuclear Generating Station) (Correction) Order 2013, the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 and the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2017.
This Order follows an application under paragraph 2 of Schedule 6 to the Act for a non-material change to allow an alteration to the alignment of the sea wall and the erection of additional pipework along the underside of the temporary jetty to enable discharges of water from the site. This Order also allows for the redesign and the change in size and location of a number of structures within the Hinkley Point C Permanent Development Site and amends the listed plans in Part 3 of Schedule 1 to the 2013 Order.
This Order, in article 7, provides for the certification of revised or substituted plans for use as evidence in any proceedings.
The changes to the 2013 Order take effect from the date specified in this Order.

---
Source: https://www.legislation.gov.uk/uksi/2018/413 (the official version)
Page: https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-amendment-order-2018
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.