# The Hinkley Point C (Nuclear Generating Station) Order 2013, Article 81: For the Protection of the Environment Agency (Part 2)

Extent: E+W+S

(1) Paragraph (2) shall have effect unless otherwise agreed in writing between the undertaker and the Environment Agency.
(2) Notwithstanding article 55 no part of any works falling within the descriptions set out in the following sub-paragraphs shall be constructed, carried out or installed (as the case may be) below the corresponding level above ordnance datum specified in each sub-paragraph—
(a) any soffits of the temporary jetty head comprised within, or associated with, Work No. TJ1, 10.1 metres above ordnance datum;
(b) the surface level of the temporary jetty head at the termination of Work No. TJ1, 11.6 metres above ordnance datum; and
(c) the temporary jetty surface elevation of the bankseat and the commencement of Work No. TJ1, 19.0 metres above ordnance datum.

---
Source: https://www.legislation.gov.uk/uksi/2013/648/article/81 (the official version)
Page: https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-order-2013/article-81
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.