  "url": "https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-order-2013/schedule-1/part-1/crossheading-in-the-district-of-west-somerset-and-the-county-of-somersetn1",
  "json_url": "https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-order-2013/schedule-1/part-1/crossheading-in-the-district-of-west-somerset-and-the-county-of-somersetn1.json",
  "legislation": "uksi/2013/648",
  "legislation_title": "The Hinkley Point C (Nuclear Generating Station) Order 2013",
  "legislation_url": "https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-order-2013",
  "path": "schedule/1/part/1/crossheading/in-the-district-of-west-somerset-and-the-county-of-somersetn1",
  "kind": "crossheading",
  "number": "HPC Development Site",
  "heading": "In the District of West Somerset and the County of Somerset",
  "text": "Work No. 1A\nHPC Main Site: An electricity generating station with a nominal gross electrical capacity of 3,260 MW power generated by two nuclear reactor units, including the following works—\n(a)site preparation works, including site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage, site levelling, spoil screening / storage for re-use on site); provision of spoil retaining structures; deep excavations; provision and relocation of drainage infrastructure (including culverts, outfalls, balancing ponds);\n(b)establishment of site construction compounds, temporary vehicle parking, construction hoardings, perimeter enclosure, security fencing, construction related buildings, structures, plant, machinery (including concrete batching), cranes, concrete silos, construction lighting and internal haulage routes;\n(c)further to works listed at (a), earthworks, including spoil bunds and ground terracing to formation levels, utilities trenches, service tunnels and associated access points and surface and foul water drainage system;\n(d)a nuclear reactor unit (unit 1), associated balance of plant, below ground services, ancillary buildings including—\n(i)buildings, structures and plant housing ‘Nuclear Island’ for Unit 1, including—\nReactor Building;\nFuel Building;\nSafeguard Buildings;\nNuclear Auxiliary Building;\nAccess Tower;\nFuel Building Hall;\nBoron Storage;\nRadioactive Waste Storage Building;\nRadioactive Waste Process Building;\nHot Laundry;\nHot Workshop, Hot Warehouse, Facilities for Decontamination;\nEffluent Tanks; ... and\nRefuelling Water Storage Tank\nEmergency Diesel Generator Buildings;\nBattery Load Bank; and\nCooling Water Discharge Weir (Buildings); ...\n...\n(ii)buildings, structures and plant housing ‘Conventional Island’ for Unit 1, including—\nTurbine Hall and Sky Bridges;\nNon-Classified Electrical Building;\nGas Insulated Switch Gear;\nMain Transformer;\nUnit Transformer;\nAuxiliary Transformer; and\nHydrazine Storage;\n...\n(iii)buildings, structures and plant housing ‘Cooling Water Pumphouse and Associated Buildings’ for Unit 1, including—\nCooling Water Pumphouse;\nForebay;\nOutfall Pond (Surge Chamber);\nFiltering Debris Recovery Pit, including associated fish return system infrastructure;\nFire-Fighting Water Building; and\nDischarge Shaft (Units 1 & 2);\n(e)a nuclear reactor unit (unit 2), associated balance of plant, below ground services, ancillary buildings including—\n(i)buildings, structures and plant housing ‘Nuclear Island’ for Unit 2, including—\nReactor building;\nFuel building;\nSafeguard Buildings;\nNuclear Auxiliary Building;\nAccess Tower;\nFuel Building Hall;\nBoron Storage;\nRadioactive Waste Treatment Building;\nHot Laundry;\nHot Workshop, Hot Warehouse, Facilities for Decontamination;\nEffluent Tanks;\nEmergency Diesel Generator Buildings;\nBattery Load Bank;\nCooling Water Discharge Weir (Buildings); and\nRefuelling Water Storage Tank\n(ii)buildings, structures and plant housing ‘Conventional Island’ for Unit 2, including—\nTurbine Hall;\nNon-Classified Electrical Building;\nGas Insulated Switch Gear;\nMain Transformer;\nUnit Transformer; and\nAuxiliary Transformer;\n...\n...\n(iii)buildings, structures and plant housing ‘Cooling Water Pumphouse and Associated Buildings’ for Unit 2, including—\nCooling Water Pumphouse;\nForebay;\nOutfall Pond;\nFiltering Debris Recovery Pit; including associated fish return system infrastructure; and\nFire-Fighting Water Building;\n(f)buildings, structures and plant housing ‘Remaining Balance of Plant’ and other plant, including—\n...\nDemineralisation Station;\nAuxiliary Boilers;\nHydrogen Storage;\nOxygen Storage;\nChemical Products Storage;\nSewage Treatment Plant;\nConventional Island Water Tanks;...\nNuclear Island Water Tank; and\nDegassed Water Storage Tanks;\n(g)buildings, structures and plant housing ‘Fuel and Waste Storage’ including—\nInterim Spent Fuel Store;\nAccess Control Building; and\nIntermediate Level Waste Interim Storage Facility;\n(h)ancillary and supporting buildings, structures and plant including—\nOperational Service Centre;\nMain Control and Access Building;\n...\nAuxiliary Administration Building;\n...\n...\nMeteorological Station;\nMeteorological Mast;\nGarage for Handling Facilities;\nOil and Grease Storage and Oil Ancillary Building;\nAreva Warehouse;\nRaw Water and Potable Water Supply;\nOutage Access Control Building;\nContaminated Tools Store ...;\nConventional Waste Storage;\nTransit Area for Very Low Level Waste and Low Level Waste;\n... ...\nBack-up Emergency Equipment Store\nService Access Buildings; ...\nUnderground Tunnel High Points;\nServices Ventilation Building;\nBack Up Containerised Generators; ...\nValve Room for Demineralisation Station.\nEmergency Response Centre; and\nEmergency Response Energy Centre.\n(i)buildings and structures housing—\nSimulator Building/Training Centre; and\nPublic Information Centre;\n(j)National Grid Substation and associated buildings and plant;\n(k)transmission towers (pylons) and associated overhead line transmission infrastructure to provide connection to the National Grid Substation (Work No. 1A(j));\n(l)landscape works, comprising temporary and permanent works, external lighting, footpaths, maintenance buildings and car parking;\n(m)site access points, internal access roads, internal rail track, hardstanding and vehicle, motorcycle and bicycle parking areas ..., access roundabout;\n(n)perimeter and internal fencing, signage, secured entrance, security buildings, CCTV poles, gates, barriers and bollards;\n(o)establishment and maintenance of a sea wall and associated coastal defences, including foreshore rock armour revetments; and\n(p)an emergency access road, including junction to existing highway, and Bridge over Bum Brook.\nThe location of the above works is shown on sheet no. 2.\nWork No. 1B\nA new access road, approximately 700m in length, and roundabout connecting to the C182, associated laying, replacement, realignment and diversions of apparatus and associated works, the location of which is shown on sheet no. 2.\nWork No. 1C\nOff-site Delivery Checkpoint , layby and turning head, adjacent to the C182, the location of which is shown on sheet no. 2.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 Pt. 1 substituted (20.11.2013) by The Hinkley Point C (Nuclear Generating Station) (Correction) Order 2013 (S.I. 2013/2938), art. 1, Sch. Table 2"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(2)(a)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Words in Sch. 1 Pt. 1 inserted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(2)(a)"
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(2)(b)"
    },
    {
      "type": "F",
      "label": "F5",
      "text": "Word in Sch. 1 Pt. 1 inserted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(2)(b)"
    },
    {
      "type": "F",
      "label": "F6",
      "text": "Words in Sch. 1 Pt. 1 omitted (24.3.2018) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(2)(c)"
    },
    {
      "type": "F",
      "label": "F7",
      "text": "Word in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(3)(a)"
    },
    {
      "type": "F",
      "label": "F8",
      "text": "Words in Sch. 1 Pt. 1 substituted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(3)(b)"
    },
    {
      "type": "F",
      "label": "F9",
      "text": "Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(3)(c)"
    },
    {
      "type": "F",
      "label": "F10",
      "text": "Word in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(4)(a)"
    },
    {
      "type": "F",
      "label": "F11",
      "text": "Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(4)(b)"
    },
    {
      "type": "F",
      "label": "F12",
      "text": "Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(5)"
    },
    {
      "type": "F",
      "label": "F13",
      "text": "Word in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(6)(a)"
    },
    {
      "type": "F",
      "label": "F14",
      "text": "Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(6)(b)"
    },
    {
      "type": "F",
      "label": "F15",
      "text": "Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(7)(a)"
    },
    {
      "type": "F",
      "label": "F16",
      "text": "Word in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(7)(b)"
    },
    {
      "type": "F",
      "label": "F17",
      "text": "Word in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(7)(c)"
    },
    {
      "type": "F",
      "label": "F18",
      "text": "Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(7)(d)"
    },
    {
      "type": "F",
      "label": "F19",
      "text": "Words in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(a)"
    },
    {
      "type": "F",
      "label": "F20",
      "text": "Words in Sch. 1 Pt. 1 substituted (7.1.2022) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(b)"
    },
    {
      "type": "F",
      "label": "F21",
      "text": "Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(8)(a)"
    },
    {
      "type": "F",
      "label": "F22",
      "text": "Words in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(c)"
    },
    {
      "type": "F",
      "label": "F23",
      "text": "Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(8)(b)"
    },
    {
      "type": "F",
      "label": "F24",
      "text": "Words in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(d)"
    },
    {
      "type": "F",
      "label": "F25",
      "text": "Word in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(8)(c)"
    },
    {
      "type": "F",
      "label": "F26",
      "text": "Words in Sch. 1 Pt. 1 substituted (7.1.2022) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(e)"
    },
    {
      "type": "F",
      "label": "F27",
      "text": "Word in Sch. 1 Pt. 1 omitted (24.3.2018) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(3)(a)"
    },
    {
      "type": "F",
      "label": "F28",
      "text": "Words in Sch. 1 Pt. 1 inserted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(3)(b)"
    },
    {
      "type": "F",
      "label": "F29",
      "text": "Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(8)(f)"
    },
    {
      "type": "F",
      "label": "F30",
      "text": "Words in Sch. 1 Pt. 1 inserted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(3)(c)"
    },
    {
      "type": "F",
      "label": "F31",
      "text": "Word in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(f)"
    },
    {
      "type": "F",
      "label": "F32",
      "text": "Words in Sch. 1 Pt. 1 inserted (7.1.2022) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(g)"
    },
    {
      "type": "F",
      "label": "F33",
      "text": "Word in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(3)"
    },
    {
      "type": "F",
      "label": "F34",
      "text": "Words in Sch. 1 Pt. 1 substituted (7.1.2022) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 4"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2013/648/schedule/1/part/1/crossheading/in-the-district-of-west-somerset-and-the-county-of-somersetn1",
    "retrieved_at": "2026-10-29T01:00:25.378735+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}