  "legislation_title": "The Hinkley Point C (Nuclear Generating Station) Order 2013",
  "legislation_url": "https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-order-2013",
  "path": "schedule/1/part/3/crossheading/site-preparation-plans",
  "kind": "crossheading",
  "number": null,
  "heading": "Site Preparation Plans",
  "text": "Drawing number\nRev\nDrawing title\nScale\n>Paper size\nHPCSPW002a Rev1\n01\nSite Layout Plan\n1:3500\nA1\nHPCSPW002b\n00\nBeach Access Road Plan and Cross Sections\n1:250 / 1:50\nA1\nHPCSPW004 Rev1\n01\nPlanning Application Fencing Arrangement (Sheet 1 of 3)\n1:3500\nA1\nHPCSPW005 Rev1\n01\nFencing Enlarged Detail West (Sheet 2 of 3)\n1:1500\nA1\nHPCSPW006 Rev1\n01\nFencing Enlarged Detail East (Sheet 3 of 3)\n1:1500\nA1\nHPCSPW007 Rev1\n01\nIndicative Earthworks Cut and Fill Arrangement\n1:3500\nA1\nHPCSPW008\n00\nEarly Works Water Management Zone\n1:2500\nA1\nHPCSP009 Rev1\n01\nSurface Water Catchment Area Overall General Arrangement\n1:3000\nA1\nHPCSPW010\n00\nArrangement of Construction Drainage Outfall to Foreshore\n1:75\nA1\nHPCSPW011 Rev1\n01\nSurface Water Drainage Holford Stream Culvert\n1:1500 / 1:150\nA1\nHPCSPW012a\n00\nDeep Water Drainage Arrangement\n1:2000 / 1:100\nA1\nHPCSPW012b\n00\nDeep Water Arrangement Spine Drain Sections A and B\n1:200\nA1\nHPCSPW012c\n00\nDeep Water Assessment Spine Drain Sections C\n1:200\nA1\nHPCSPW013b\n00\nTypical Cross Section Through Haul Road\n1:50\nA1\nHPCSPW014\n00\n11kv Sub Station Plan and Elevations\n1:100\nA1\nHPCSPW015\n00\nRaw Water Reservoir Plans and Sections\n1:150\nA1\nHPCSPW016 Rev1\n01\nSurface Water Drainage in the Built Development Areas\n1:1750\nA1\nHPCSPW017\n00\nSite Access Control Arrangement, Floor and Elevation\n1:50\nA1\nHPCSPW019 Rev1\n01\nLandscape Proposal Plan\n1:5000\nA1\nHPCSPW022\n00\nProposed Sewage Treatment Plant – Plans and Sections\n1:100\nA1\nHPCSPW023a\n00\nExisting and Reinstated Ground Level Cross Sections\n1:2500 / 1:500\nA1\nHPCSPW023b\n00\nEarthworks Platforms Cross Sections\n1:2500 / 1:500\nA1\nHPCSPW025a Rev2\n02\nTree and Hedgerow Retention and Removal\n1:4000\nA1\nHPCSPW025b Rev1\n01\nProposed Advanced Planting, Plan\n1:1000\nA1\nHPCSPW026\n00\nPrimary and Secondary Access Tracks\n1:3500\nA1\nHPCSPW027\n00\nNW Boundary Mitigation During Construction Cross Sections A and B\n1:200\nA1\nHPCSPW028\n00\nNW Boundary Mitigation During Construction Cross Sections C and D\n1:200\nA1\nHPCSPW029\n00\nNW Boundary Mitigation During Construction Planting Plan\n1:750\nA1",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 Pt. 3 substituted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), art. 1, Sch."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2013/648/schedule/1/part/3/crossheading/site-preparation-plans",
    "retrieved_at": "2026-10-29T01:00:25.378735+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}