# The Hinkley Point C (Nuclear Generating Station) Order 2013, Site Preparation Plans


Drawing number
Rev
Drawing title
Scale
>Paper size
HPCSPW002a Rev1
01
Site Layout Plan
1:3500
A1
HPCSPW002b
00
Beach Access Road Plan and Cross Sections
1:250 / 1:50
A1
HPCSPW004 Rev1
01
Planning Application Fencing Arrangement (Sheet 1 of 3)
1:3500
A1
HPCSPW005 Rev1
01
Fencing Enlarged Detail West (Sheet 2 of 3)
1:1500
A1
HPCSPW006 Rev1
01
Fencing Enlarged Detail East (Sheet 3 of 3)
1:1500
A1
HPCSPW007 Rev1
01
Indicative Earthworks Cut and Fill Arrangement
1:3500
A1
HPCSPW008
00
Early Works Water Management Zone
1:2500
A1
HPCSP009 Rev1
01
Surface Water Catchment Area Overall General Arrangement
1:3000
A1
HPCSPW010
00
Arrangement of Construction Drainage Outfall to Foreshore
1:75
A1
HPCSPW011 Rev1
01
Surface Water Drainage Holford Stream Culvert
1:1500 / 1:150
A1
HPCSPW012a
00
Deep Water Drainage Arrangement
1:2000 / 1:100
A1
HPCSPW012b
00
Deep Water Arrangement Spine Drain Sections A and B
1:200
A1
HPCSPW012c
00
Deep Water Assessment Spine Drain Sections C
1:200
A1
HPCSPW013b
00
Typical Cross Section Through Haul Road
1:50
A1
HPCSPW014
00
11kv Sub Station Plan and Elevations
1:100
A1
HPCSPW015
00
Raw Water Reservoir Plans and Sections
1:150
A1
HPCSPW016 Rev1
01
Surface Water Drainage in the Built Development Areas
1:1750
A1
HPCSPW017
00
Site Access Control Arrangement, Floor and Elevation
1:50
A1
HPCSPW019 Rev1
01
Landscape Proposal Plan
1:5000
A1
HPCSPW022
00
Proposed Sewage Treatment Plant – Plans and Sections
1:100
A1
HPCSPW023a
00
Existing and Reinstated Ground Level Cross Sections
1:2500 / 1:500
A1
HPCSPW023b
00
Earthworks Platforms Cross Sections
1:2500 / 1:500
A1
HPCSPW025a Rev2
02
Tree and Hedgerow Retention and Removal
1:4000
A1
HPCSPW025b Rev1
01
Proposed Advanced Planting, Plan
1:1000
A1
HPCSPW026
00
Primary and Secondary Access Tracks
1:3500
A1
HPCSPW027
00
NW Boundary Mitigation During Construction Cross Sections A and B
1:200
A1
HPCSPW028
00
NW Boundary Mitigation During Construction Cross Sections C and D
1:200
A1
HPCSPW029
00
NW Boundary Mitigation During Construction Planting Plan
1:750
A1

---
Source: https://www.legislation.gov.uk/uksi/2013/648/schedule/1/part/3/crossheading/site-preparation-plans (the official version)
Page: https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-order-2013/schedule-1/part-3/crossheading-site-preparation-plans
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.