# The Hinkley Point C (Nuclear Generating Station) Order 2013, Schedule 3: Deemed approval of matters referred to in requirements

Extent: E+W+S

(1)
Site preparation permission condition
(2)
Order requirement
FP14: Ecology: Wildlife Mitigation Measures – Reptiles
P2
G37: Historic Environment, Ecology and Landscape: Green Lane - Preservation in situ
P6
SP15: Historic Environment: Monitoring of Paleontological Remains
P7
SP22: Historic Environment: Scheduled Monument Management Plan
P8
FP4 and SP1: Surface water drainage
P10
SP2: Drainage: Culvert of Holford Stream
P11
SP3: Drainage: Holford Culvert Flood Risk Management Strategy
P12
SP11:Geology and Contaminated Land: Contamination Risk Assessment and Implementation
P13
SP10: Geology and Contaminated Land: Radiological Monitoring
P16
FP7: Vegetation clearance
P17
FP1: Ecological Mitigation and Monitoring Plan
P18
FP3: Habitat Management Plan
P19
SP5: Engineering Details of Foreshore Access Road
P21
SP8: Flooding: foreshore access
P23
SP9: Flooding / Erosion: Retaining Wall
P24

---
Source: https://www.legislation.gov.uk/uksi/2013/648/schedule/3 (the official version)
Page: https://openlegislation.uk/hinkley-point-c-nuclear-generating-station-order-2013/schedule-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.