# The Hinkley Point Harbour Empowerment Order 2012, Article 38: For the protection of the Environment Agency

Extent: E+W+S

(1) Paragraph (2) shall have effect unless otherwise agreed with the Environment Agency.
(2) Notwithstanding article 5 (power to deviate) no part of any works falling within the descriptions set out in the following sub-paragraphs must be constructed, carried out or installed (as the case may be) below the corresponding level above ordnance datum specified in each sub-paragraph—
(a) any soffits of the jetty head comprised within, or associated with, Work No. 1, 10.1 metres above ordnance datum;
(b) the surface level of the jetty head at the termination of Work No. 1, 11.6 metres above ordnance datum;
(c) the jetty surface elevation of the bankseat and the commencement of Work No. 1, 19.0 metres above ordnance datum;
(d) the area of hardstanding comprised within Work No. 4, 17.0 metres above ordnance datum;
(e) the base level of Work No. 8, 11.0 metres above ordnance datum; and
(f) the surface level of Work No. 6 at the point where it crosses the Hinkley Point C drainage ditch, 10.3 metres above ordnance datum.

---
Source: https://www.legislation.gov.uk/uksi/2012/1914/article/38 (the official version)
Page: https://openlegislation.uk/hinkley-point-harbour-empowerment-order-2012/article-38
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.