# The Hinkley Point Harbour Empowerment Order 2012, Paragraph 1

Extent: E+W+S

In this Schedule—
“alignment drawing”
means the drawing no. HP/SL 302 Revision A in the deposited plans and sections showing the indicative alignments of the silos and the sand shed;
“commencement”
means in relation to the construction of the development, the carrying out of a material operation and cognate terms shall be construed accordingly;
“development consent order”
means an order granting development consent under section 114 of the Planning Act 2008;
“the HEO land”
means the land, foreshore and seabed within the limits of deviation shown on the deposited plans and sections;
“hopper”
means a batching silo for the transfer of cement or similar materials from the storage silos to vehicles;
“the onshore area”
means that part of the HEO land above the level of low water;
“sand shed”
means the covered area for the storage of sand to be constructed as part of Work No. 4;
“silos”
means the silos to be constructed as part of Work No. 5;
“the site”
means so much of the HEO land as is above the level of high water;
“site preparation works”
means the development and works authorised by the site preparation works permission; and
“site preparation works permission”
means the planning permission granted on 27th January 2012 by the local planning authority (Council reference 3/32/10/037).

---
Source: https://www.legislation.gov.uk/uksi/2012/1914/schedule/1/part/1/paragraph/1 (the official version)
Page: https://openlegislation.uk/hinkley-point-harbour-empowerment-order-2012/schedule-1/part-1/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.