Article 3 Power to construct works

Original text. Later amendments are not shown.

(1)

Subject to the provisions of this Order, the Company may in the lines and situations and upon the lands delineated on the deposited plans and within the limits of deviation shown on them and according to the levels shown on the deposited sections, construct and maintain in Anglesey the following works, with all necessary works and conveniences connected with them—

(a)

Work No. 1 – A wall including a quay face 370 metres in length forming a berth for vessels and incorporating an overtopping wave wall to the north of the quay face, extending into the harbour and enclosing an area of the harbour of 65,750 square metres, commencing at a point SOP-A1 at 225555, 382865 extending from that point in a straight line to a point SOP-A2 at 225578, 382886 extending from that point in a straight line to a point SOP-A3 at 225672, 383247 extending from that point in a straight line to a point SOP-A6 at 225569, 383258 and there terminating the location of which is shown on sheet 2 and the section of which is shown on sheet 4;

(b)

Work No. 1A – A wave wall commencing at a point SOP-A3 at 225672, 383247 extending from that point in a straight line to a point SOP-A4 at 225745, 383280 extending from that point in a straight line to a point at SOP-A5 at 225732, 383307 and there terminating the location of which is shown on sheet 2 and the section of which is shown on sheet 4;

(c)

Work No. 2 – An area of rock armour revetment adjacent to, and to the north of, Works Nos. 1 and 1A the situation of which is shown on sheet 2 and the section of which is shown on sheet 4;

(d)

Work No. 3 – A wall including a quay face 280 metres in length forming a berth for vessels, extending into the harbour and enclosing an area of the harbour of 24,250 square metres, commencing at a point at SOP-B1 at 224982, 382762 extending from that point in a straight line to a point at SOP-B2 at 225239, 382887 and there terminating the location of which is shown on sheet 3 and the section of which is shown on sheet 5;

(e)

Work No. 4 – A single storey warehouse building the location of which is shown on sheet 2 and the plan and elevation of which are shown on sheet 6;

(f)

Work No. 5 – A single storey warehouse building the location of which is shown on sheet 2 and the plan and elevation of which are shown on sheet 7.

(2)

Subject to the provisions of this Order, the Company may, for the purposes of the works authorised by paragraph (1), demolish and remove any structures or apparatus lying within the limits of deviation or the construction limits and enclose and reclaim so much of the bed of the harbour and of the foreshore as lies within the limits of deviation and may hold and use the same as part of the undertaking of the Company; and so much of the bed of the harbour and of the foreshore as may be reclaimed is to be deemed operational land within the meaning and for the purposes of the Town and Country Planning Act 1990f1.

(3)

Without affecting the general power conferred under paragraph (2), the Company may, in connection with the construction of the works, demolish and remove so much of the existing navigational structures which are situated within the construction limits as may be considered necessary or expedient.

(4)

Subject to the provisions of this Order, the Company may, within the limits of deviation, reconstruct, extend, enlarge, replace or relay the works authorised by paragraph (1) and may maintain the same as reconstructed, extended, enlarged, replaced or relaid.