Regulation 8 Calculating size of grant

Original text. Later amendments are not shown.

In regulation 9 (calculation of size of grant)f1—

(a)

in paragraph (1)—

(i)

at the beginning insert “Subject to paragraph 4,”;

(ii)

for the heading in column 2 of the table substitute “Work not carried out or arranged by eligible contractor”; and

(iii)

in the heading in column 3 of the table substitute “Work carried out or arranged by eligible contractor”;

(b)

in paragraph (2) for “Where the work is carried out by the applicant” substitute “Where the work is not carried out or arranged to be carried out by an eligible contractor”; and

(c)

at the end insert—

“(4)

Where the applicant meets the condition in regulation 3(1)(b), but not the condition in regulation 3(1)(c) or (d), paragraphs (1) to (3) above shall apply as if the reference to the table were to the following table—

(1)(2)(3)
Work under regulationWork not carried out or arranged by eligible contractorWork carried out or arranged by eligible contractor
5(1)(a)£40.18£49.68
5(1)(b)£22.63£32.13
5(1)(c)£62.75£76.25
5(1)(d)No grant available£10.00

”.

Annotations

Footnotes

f1

Regulation 9 was substituted by S.I. 1993/2799.