Regulation 8 Calculating size of grant
In regulation 9 (calculation of size of grant)f1—
in paragraph (1)—
at the beginning insert “Subject to paragraph 4,”;
for the heading in column 2 of the table substitute “Work not carried out or arranged by eligible contractor”; and
in the heading in column 3 of the table substitute “Work carried out or arranged by eligible contractor”;
in paragraph (2) for “Where the work is carried out by the applicant” substitute “Where the work is not carried out or arranged to be carried out by an eligible contractor”; and
at the end insert—
“(4)Where the applicant meets the condition in regulation 3(1)(b), but not the condition in regulation 3(1)(c) or (d), paragraphs (1) to (3) above shall apply as if the reference to the table were to the following table—
(1) (2) (3) Work under regulation Work not carried out or arranged by eligible contractor Work carried out or arranged by eligible contractor 5(1)(a) £40.18 £49.68 5(1)(b) £22.63 £32.13 5(1)(c) £62.75 £76.25 5(1)(d) No grant available £10.00 ”.
Annotations
Footnotes
- f1
-
Regulation 9 was substituted by S.I. 1993/2799.