  "url": "https://openlegislation.uk/hornsea-four-offshore-wind-farm-order-2023/schedule-6",
  "json_url": "https://openlegislation.uk/hornsea-four-offshore-wind-farm-order-2023/schedule-6.json",
  "legislation": "uksi/2023/800",
  "legislation_title": "The Hornsea Four Offshore Wind Farm Order 2023",
  "legislation_url": "https://openlegislation.uk/hornsea-four-offshore-wind-farm-order-2023",
  "path": "schedule/6",
  "kind": "schedule",
  "number": "6",
  "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED",
  "text": "(1)\nNumber of land shown on land plans\n(2)\nPurpose for which rights may be acquired and restrictions imposed\n1\n2\n2A\n3\n3A\n4\n4A\n10\n11\n12\n13\n18\n19\n20\n21\n27\n28\n29\n30\n31\n32\n33\n36\n37\n38\n39\n40\n41\n51\n52\n53\n54\n58\n59\n60\n61\n62\n63\n64\n65\n66\n68\n69\n70\n71\n72\n73\n74\n75\n76\n77\n78\n86\n87\n88\n93\n94\n95\n96\n106\n107\n108\n109\n110\n111\n126\n127\n128\n129\n130\n139\n140\n141\n142\n143\n144\n145\n146\n147\n148\n149\n150\n153\n155\n156\n157\n158\n159\n160\n161\n166\n167\n168\n169\n170\n171\n172\n173\n174\n175\n176\n177\n178\n179\n180\n181\n182\n183\n184\n188\n189\n190\n191\n194\n195\n196\n199\n200\n201\n211\n212\n213\n214\n215\n216\n223\n227\n228\n233\n234\n235\n238\n239\n240\n241\n242\n243\n244\n245\n252\n253\n254\n262\n263\n264\n265\n266\n272\n273\n274\n275\n276\n277\n278\n279\n280\n281\n282\n285\n292\n293\n294\n298\n299\n300\n307\n308\n309\n310\n315\n316\n317\n318\n335\n336\n337\n338\n339\n340\n341\n342\n343\n344\n345\n346\n347\n348\n349\n350\n351\n352\n353\n354\n355\n356\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve underground electricity cables, jointing bays, ducting, telecommunications and other ancillary apparatus (including but not limited to access chambers, manholes and marker posts) and any other works as necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said cables, telecommunications and other ancillary apparatus\nRights to pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the construction, use, maintenance and decommissioning of the authorised development\nRights to continuous vertical and lateral support for the authorised development\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, services, flues and to drain into and manage waterflows in any drains, watercourses and culverts\nRights to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures, the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary\nRestrictions on erecting buildings or structures, altering ground levels, planting trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development\n1\n2\n2A\n3\n3A\n4\n4A\nRights to ground and lay anchor for vessels within the Order land\n308\n309\n310\n315\n316\n317\n318\n323\n330\n332\n333\n335\n336\n337\n338\n339\n340\n341\n342\n343\n344\n345\n346\n347\n348\n349\n350\n351\n352\n353\n354\n355\n356\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve pipes, ducts, mains, wires, cables, conduits, flues, fibre optic cables and other conducting media of whatsoever nature\nRestrictions on erecting buildings or structures, altering ground levels, planting trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development\n14\n17\n25\n26\n35\n45\n46\n47\n56\n57\n80\n84\n92\n99\n100\n104\n113\n114\n117\n123\n134\n135\n151\n163\n165\n186\n187\n192\n203\n206\n209\n230\n237\n250\n255\n258\n268\n269\n290\n296\n305\nRights to use, maintain and improve a permanent means of access including visibility splays and bridges\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary\nRights to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the construction, use, maintenance and decommissioning of the authorised development\nRights to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures, the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works\nRestrictions on erecting buildings or structures, altering ground levels, planting trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights\n23\n25\n34\n55\n91\n98\n138\n152\n162\n164\n185\n193\n203\n206\n229\n236\n247\n255\n267\n287\n295\n302\nRights to pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the construction, use, maintenance and decommissioning of the authorised development\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary\nRights to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures, the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works\nRestrictions on erecting buildings or structures, altering ground levels, planting trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights\n323\n330\n332\n333\nRights to construct, use, maintain and improve a permanent means of access including visibility splays\nRights to pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the construction, use, maintenance and decommissioning of the authorised development\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve pipes, ducts, mains, wires, cables, conduits, flues, fibre optic cables and other conducting media of whatsoever nature\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve security infrastructure including cameras, perimeter fencing, fencing, gates and any other security measures or ancillary apparatus required in order to ensure an appropriate level of security in respect of the authorised development\nRights to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures, the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve any boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary\nRestrictions on erecting buildings or structures, altering ground levels, planting trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights\n340\n341\n342\n343\n344\n345\n346\n347\n348\n349\n350\n351\n352\n353\n354\n355\n356\nRights to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve electricity poles, overhead electricity lines, underground electricity cables, telecommunications and all equipment and other ancillary apparatus (including but not limited to the use of scaffolding) and any other works as necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said poles, lines, telecommunications and other equipment and ancillary apparatus\nRestrictions on erecting buildings or structures, altering ground levels, planting trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 6 substituted (31.1.2024) by The Hornsea Four Offshore Wind Farm (Correction) Order 2024 (S.I. 2024/117), art. 1(2), Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 6 in force at 3.8.2023, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2023/800/schedule/6",
    "retrieved_at": "2026-10-28T21:42:40.472949+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}