Part 3 (requirements) of Schedule 1 (authorised project) is amended as follows—
(a) in paragraph 2(2)(b), for “1,800 m²” substitute “2,400 m²”;
(b) in paragraph 2(5)(b), for “1,800 m² or 45 metres” substitute “2,500 m² or 50 metres”; and
(c) in paragraph 10, for “MHWS” substitute “the mean low water mark”.

---