# The Hornsea One Offshore Wind Farm Order 2014, Paragraph 13: Surface water drainage

Extent: E+W+S

(1) No part of the electrical transmission station is to commence until a detailed surface water drainage scheme based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the electrical transmission station have been submitted to and approved in writing by the local planning authority, in consultation with the Environment Agency and the drainage board within the meaning of section 25 of the Land Drainage Act 1991.
(2) Construction of the electrical transmission station must be carried out in accordance with the scheme.

---