  "url": "https://openlegislation.uk/hornsea-one-offshore-wind-farm-order-2014/schedule-9/part-1/paragraph-2",
  "json_url": "https://openlegislation.uk/hornsea-one-offshore-wind-farm-order-2014/schedule-9/part-1/paragraph-2.json",
  "legislation": "uksi/2014/3331",
  "legislation_title": "The Hornsea One Offshore Wind Farm Order 2014",
  "legislation_url": "https://openlegislation.uk/hornsea-one-offshore-wind-farm-order-2014",
  "path": "schedule/9/part/1/paragraph/2",
  "kind": "paragraph",
  "number": "2",
  "heading": "Details of licensed activities",
  "text": "(1) This licence authorises the licence-holder (and any agent or contractor acting on their behalf) to carry out the following licensable marine activities pursuant to section 66(1) of the 2009 Act, subject to the licence conditions—\n(a) the deposit at sea of the substances and articles specified in sub-paragraph (3) below;\n(b) the construction of works in or over the sea and/or on or under the sea bed;\n(c) dredging;\n(d) the removal of sediment samples for the purposes of informing environmental monitoring under this licence during pre-construction, construction and operation;\n(e) the disposal at disposal site reference HU206 (Hornsea Project One Subzone 1) of—\n(i) in the event that an offshore accommodation platform is constructed under this licence up to 434,004 m3 or, if no part of Work No.3 is constructed, up to 641,385 m3, of inert material of natural origin produced during construction drilling and seabed preparation for foundation works comprised in Work No. 2; or\n(ii) in the event that no offshore accommodation platform is constructed under this licence up to 414,762 m3 or, if no part of Work No.3 is constructed, up to 622,143 m3, of inert material of natural origin produced during construction drilling and seabed preparation for foundation works comprised in Work No. 2; and\n(f) the removal of the substances and articles specified in sub-paragraph (3) below.\n(2) Such activities are authorised in relation to the construction, maintenance and operation of—\nWork No. 2 — An offshore wind generating station within Wind Farm Area 2, whose coordinates constitute the limits of deviation for Work No.2 and are specified in Table 1, comprising—\n(a) up to 80 or, if no part of Work No. 3 is constructed, up to 120 wind turbine generators fixed to the seabed;\n(b) a network of subsea inter-array electrical circuits connecting the structures comprised in Work No. 2—\n(i) with each other;\n(ii) with any other structure located within Wind Farm Area 2; and\n(iii) (for the purpose of connecting any structure comprised in Work No. 2 with any structure comprised in Works Nos. 1, 3 and 4) with the network of electrical circuits comprised in Works Nos. 1, 3 and 4;\n(c) up to one offshore accommodation platform fixed to the seabed which may be connected to one of the offshore HVAC collector substations or offshore HVDC converter stations within Work No. 4 by an unsupported steel bridge, provided that the combined total of offshore accommodation platforms constructed in whole or in part within Works Nos. 1, 2 and 3 does not exceed two.\nTable 1: Co-ordinates for Wind Farm Area 2 (limits of deviation for Work No. 2)\nPoint\nLatitude\nLongitude\n1\n53° 55′ 31.318″ N\n1° 52′ 54.282″ E\n2\n53° 55′ 37.592″ N\n1° 53′ 38.108″ E\n3\n53° 55′ 23.329″ N\n1° 55′ 20.262″ E\n4\n53° 55′ 8.162″ N\n1° 56′ 10.619″ E\n5\n53° 55′ 35.429″ N\n1° 59′ 20.944″ E\n6\n53° 55′ 2.525″ N\n1° 59′ 45.776″ E\n7\n53° 55′ 22.663″ N\n2° 2′ 14.219″ E\n8\n53° 56′ 16.303″ N\n2° 1′ 15.269″ E\n9\n53° 56′ 46.586″ N\n2° 5′ 4.031″ E\n10\n53° 57′ 12.481″ N\n2° 4′ 32.376″ E\n11\n53° 57′ 24.509″ N\n2° 6′ 6.700″ E\n12\n53° 50′ 10.018″ N\n2° 13′ 57.158″ E\n13\n53° 49′ 14.297″ N\n2° 11′ 36.820″ E\n14\n53° 49′ 58.584″ N\n1° 59′ 54.762″ E\n15\n53° 49′ 58.944″ N\n1° 58′ 59.804″ E\nIn connection with such Work No. 2, further associated development as may be necessary or expedient in connection with the authorised scheme within the Order limits and which fall within the scope of the environmental impact assessment recorded in the Environmental Statement;\nIn connection with such Work No. 2, ancillary works consisting of works and operations within the Order limits comprising temporary anchorage of vessels and buoys, beacons, fenders and other navigational warning or ship impact protection works.\n(3) The substances or articles authorised for deposit at sea are—\n(a) iron and steel;\n(b) stone and rock;\n(c) concrete;\n(d) sand and gravel;\n(e) plastic and synthetic; and\n(f) material extracted from within Wind Farm Area 2 during construction drilling and seabed preparation for foundation works.\n(4) The grid co-ordinates for disposal site reference HU206 (Hornsea Project One Subzone 1) are specified in Table 2.\nTable 2: Co-ordinates for disposal site HU206\nPoint\nLatitude\nLongitude\n1\n53° 58′ 42.179″ N\n1° 44′ 31.880″ E\n2\n53° 55′ 46.445″ N\n1° 47′ 47.796″ E\n3\n53° 56′ 22.870″ N\n1° 51′ 57.409″ E\n4\n53° 55′ 31.318″ N\n1° 52′ 54.282″ E\n5\n53° 55′ 37.592″ N\n1° 53′ 38.108″ E\n6\n53° 55′ 23.329″ N\n1° 55′ 20.262″ E\n7\n53° 55′ 8.162″ N\n1° 56′ 10.619″ E\n8\n53° 55′ 35.429″ N\n1° 59′ 20.944″ E\n9\n53° 55′ 2.525″ N\n1° 59′ 45.776″ E\n10\n53° 55′ 22.663″ N\n2° 2′ 14.219″ E\n11\n53° 56′ 16.303″ N\n2° 1′ 15.269″ E\n12\n53° 56′ 46.586″ N\n2° 5′ 4.031″ E\n13\n53° 57′ 12.481″ N\n2° 4′ 32.376″ E\n14\n53° 57′ 24.509″ N\n2° 6′ 6.700″ E\n15\n53° 50′ 10.018″ N\n2° 13′ 57.158″ E\n16\n53° 49′ 14.297″ N\n2° 11′ 36.820″ E\n17\n53° 49′ 58.584″ N\n1° 59′ 54.762″ E\n18\n53° 49′ 58.944″ N\n1° 58′ 59.804″ E\n19\n53° 50′ 5.118″ N\n1° 38′ 58.430″ E\n20\n53° 55′ 9.293″ N\n1° 39′ 52.024″ E\n21\n53° 56′ 3.228″ N\n1° 41′ 0.143″ E\n22\n53° 56′ 29.670″ N\n1° 43′ 45.592″ E\n23\n53° 58′ 17.828″ N\n1° 41′ 46.795″ E\n(5) The provisions of section 72 of the 2009 Act shall apply to this licence, save that the provisions of section 72(7) and 72(8) relating to the transfer of the licence shall only apply to a transfer not falling within article 34 of the Order.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 9 Pt. 1 para. 2 in force at 31.12.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/3331/schedule/9/part/1/paragraph/2",
    "retrieved_at": "2026-10-28T23:53:19.221455+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}