# The Hornsea One Offshore Wind Farm Order 2014, Paragraph 4: Design parameters

Extent: E+W+S

The electrical circuits comprised in Work No. 2 must be installed by use of, or a combination of, ploughing, trenching, jetting, rock-cutting, dredging, surface laying with post lay burial, and where ground conditions make burial impracticable, by surface laying.

---