{
  "url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020/schedule-1/paragraph-7",
  "json_url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020/schedule-1/paragraph-7.json",
  "legislation": "uksi/2020/1656",
  "legislation_title": "The Hornsea Three Offshore Wind Farm Order 2020",
  "legislation_url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020",
  "path": "schedule/1/paragraph/7",
  "kind": "paragraph",
  "number": "7",
  "heading": "Detailed design approval onshore",
  "text": "(1) Construction of the connection works in either Work No.9 or Work No. 10 shall not commence until details of—\n(a) the layout;\n(b) scale;\n(c) proposed finished ground levels;\n(d) external appearance and materials;\n(e) hard surfacing materials;\n(f) vehicular and pedestrian access, parking and circulation areas;\n(g) minor structures, such as furniture, refuse or other storage units, signs and lighting; and\n(h) proposed and existing functional services above and below, ground, including drainage, power and communications cables and pipelines, manholes and supports ,\nrelating to that work of the authorised project have been submitted to and approved in writing by the relevant planning authority.\n(2) The details submitted under sub-paragraph (1) must be in accordance with the limits of deviation set out in the onshore limits of deviation plan and substantially in accordance with the design objectives and principles.\n(3) The connection works in Works No.9 and 10 must be carried out in accordance with the approved details.\n(4) The connection works in either Work No.9 or Work No. 10 shall not commence until explanation of the choice of HVDC or HVAC for that phase has been provided in writing to the relevant planning authority, either before, or at the same time as, the details referred to in sub-paragraph (1).",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Comma in Sch. 1 Pt. 3 substituted for semi-colon (21.5.2021) by The Hornsea Three Offshore Wind Farm (Correction) Order 2021 (S.I. 2021/599), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Word in Sch. 1 Pt. 3 substituted (21.5.2021) by The Hornsea Three Offshore Wind Farm (Correction) Order 2021 (S.I. 2021/599), art. 1(2), Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 3 para. 7 in force at 22.1.2021, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/1656/schedule/1/paragraph/7",
    "retrieved_at": "2026-10-28T22:19:02.788189+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}