{
  "url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020/schedule-1/paragraph-wrapper2",
  "json_url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020/schedule-1/paragraph-wrapper2.json",
  "legislation": "uksi/2020/1656",
  "legislation_title": "The Hornsea Three Offshore Wind Farm Order 2020",
  "legislation_url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020",
  "path": "schedule/1/paragraph/wrapper2",
  "kind": "paragraph",
  "number": null,
  "heading": null,
  "text": "In connection with such Work Nos. 1 to 5 and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and which fall within the scope of the work assessed by the environmental statement, including—\n(a) scour protection around the foundations of the offshore structures;\n(b) cable protection measures such as the placement of rock and/or concrete mattresses, with or without frond devices;\n(c) the removal of material from the seabed required for the construction of Work Nos. 1 to 5 and the disposal of up to 3,563,133 cubic metres of inert material of natural origin within the Order limits produced during construction drilling, seabed preparation for foundation works, cable installation preparation such as sandwave clearance, boulder clearance and pre-trenching and excavation of horizontal directional drilling exit pits; and\n(d) removal of static fishing equipment;\nand in connection with such Work Nos. 6 to 15 and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and which fall within the scope of the work assessed by the environmental statement, including—\n(a) ramps, means of access and footpaths;\n(b) bunds, embankments, swales, landscaping, fencing and boundary treatments;\n(c) habitat creation;\n(d) jointing bays, link boxes, cable ducts, cable protection, joint protection, manholes, marker posts, underground cable marker, tiles and tape, and lighting and other works associated with cable laying;\n(e) works for the provision of apparatus including cabling, water and electricity supply works, foul drainage provision, surface water management systems and culverting;\n(f) works to alter the position of apparatus, including mains, sewers, drains and cables;\n(g) works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses;\n(h) landscaping and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised project;\n(i) works for the benefit or protection of land affected by the authorised project;\n(j) working sites in connection with the construction of the authorised project, construction lay down areas and compounds, storage compounds and their restoration.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/1656/schedule/1/paragraph/wrapper2",
    "retrieved_at": "2026-10-28T22:19:02.788189+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}