  "url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020/schedule-1/part-1/paragraph-wrapper1n1",
  "json_url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020/schedule-1/part-1/paragraph-wrapper1n1.json",
  "legislation": "uksi/2020/1656",
  "legislation_title": "The Hornsea Three Offshore Wind Farm Order 2020",
  "legislation_url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020",
  "path": "schedule/1/part/1/paragraph/wrapper1n1",
  "kind": "paragraph",
  "number": null,
  "heading": "In the county of Norfolk, districts of North Norfolk, Broadland and South Norfolk",
  "text": "Work No. 6— onshore connection works consisting of up to six cable circuits, ducts and between Work No. 5 and Work No. 7 landward of MHWS and onshore construction works;\nWork No.7— onshore connection works consisting of—\n(a) up to six cable circuits and associated electrical circuit ducts between Work No. 6 and Work No. 8;\n(b) onshore construction works;\n(c) up to six transition joint bays; and\n(d) horizontal directional drilling launch pits;\nWork No. 8— onshore connection works consisting of—\n(a) up to six cable circuits and associated electrical circuit ducts to Work No. 11;\n(b) onshore construction works;\n(c) up to 440 link boxes; and\n(d) up to 440 joint bays;\nWork No. 9— onshore connection works consisting of the construction of an onshore HVAC booster station, together with onshore construction works;Work No. 10— onshore connection works consisting of an onshore HVDC/HVAC substation, including up to six cable circuits and electrical circuit ducts, and onshore construction works;Work No. 11— onshore connection works consisting of up to six cable circuits and electrical circuit ducts between Work No. 10 and Work No. 12 and onshore construction works;Work No. 12— onshore connection works consisting of up to six cable circuits and electrical circuit ducts between Work No. 11 and the Norwich Main National Grid substation, including a connection above ground and electrical engineering works within or around the National Grid substation buildings and compound, and onshore construction works;Work No. 13— a construction compound to support the construction of Work Nos. 8, 9, 10, 11, 12, 14 and 15;Work No. 14— temporary vehicular access tracks to serve Work Nos. 7, 8, 9, 10, 11, 12, 13 and 15; andWork No. 15— temporary storage areas to assist with the onshore connection works.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Word in Sch. 1 Pt. 1 substituted (21.5.2021) by The Hornsea Three Offshore Wind Farm (Correction) Order 2021 (S.I. 2021/599), art. 1(2), Sch."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/1656/schedule/1/part/1/paragraph/wrapper1n1",
    "retrieved_at": "2026-10-28T22:19:02.788189+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}