# The Hornsea Three Offshore Wind Farm Order 2020, Paragraph 1: Design parameters

Extent: E+W

(1) The total number of offshore electrical installations shall not exceed 18, and shall consist of no more than—
(a) 12 offshore type 1 substations;
(b) four offshore type 2 substations;
(c) four offshore HVAC booster stations; and
(d) six offshore subsea HVAC booster stations.

---