{
  "url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020/schedule-9/part-8/paragraph-2",
  "json_url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020/schedule-9/part-8/paragraph-2.json",
  "legislation": "uksi/2020/1656",
  "legislation_title": "The Hornsea Three Offshore Wind Farm Order 2020",
  "legislation_url": "https://openlegislation.uk/hornsea-three-offshore-wind-farm-order-2020",
  "path": "schedule/9/part/8/paragraph/2",
  "kind": "paragraph",
  "number": "2",
  "heading": null,
  "text": "In this Part—\n“apparatus” means the cables, structures or other infrastructure owned, occupied or maintained by Vanguard or its successor in title within the Norfolk Vanguard Order land;\n“construction” includes execution, placing, altering, replacing, reconstruction, relaying, maintenance, extensions, enlargement and removal; and “construct” and “constructed” must be construed accordingly;\n“Crossing Area” means the land within land parcels 16-001, 16-002, 16-003 and 16-004 shown on the land plans and described in the book of reference;\n“Norfolk Vanguard Order” means the Norfolk Vanguard Offshore Wind Farm Order as granted by the Secretary of State on 1 July 2020;\n“Norfolk Vanguard Order land” means Order land as defined in the Norfolk Vanguard Order;\n“plans” includes sections, drawings, specifications, designs, design data, software, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of the Norfolk Vanguard Order land;\n“proposed Norfolk Vanguard Cable Corridor” means the proposed location for any electrical circuit(s) and construction compound(s) permitted by the Norfolk Vanguard Order within the Norfolk Vanguard Order land;\n“specified works” means so much of any works or operations authorised by this Order (or authorised by any planning permission intended to operate in conjunction with this Order) as is—\n(a)within the Crossing Area;\n(b)in, on, under, over or within 25 metres of the proposed Norfolk Vanguard Cable Corridor or any apparatus; or\n(c)may in any way adversely affect any apparatus; and\n“Vanguard” means an undertaker with the benefit of all or part of the Norfolk Vanguard Order for the time being.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 9 Pt. 8 para. 2 in force at 22.1.2021, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/1656/schedule/9/part/8/paragraph/2",
    "retrieved_at": "2026-10-28T22:19:02.788189+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}