Article 2 Amendment to the Hornsea Two Offshore Wind Farm Order 2016

Original text. Later amendments are not shown.

(1)

The Hornsea Two Offshore Wind Farm Order 2016 is amended as follows.

(2)

In paragraph 3(1) of Part 1 (Authorised Development) of Schedule 1 (Authorised Project), in the descriptions of Work No. 2A and Work No. 2B, for “up to 6 offshore HVAC collector substations”, where it occurs, substitute “up to 3 offshore HVAC collector substations”.

(3)

In paragraph 3(2) of Part 1 (Authorised Development) of Schedule 1 (Authorised Project), for “must not exceed 6” substitute “must not exceed 3”.

(4)

In paragraph 2(4)(b) of Part 3 (Requirements) of Schedule 1 (Authorised project), for “3,600 square metres in area or 60 metres in width” substitute “6,300 square metres in area or 90 metres in width”.