# The Hornsea Two Offshore Wind Farm Order 2016, Paragraph 2

Extent: E+W+S

(1) The nationally significant infrastructure project comprises up to 2 offshore wind generating stations with a combined gross electrical output capacity of up to 1,800 megawatts as follows—
Work No. 1A — An offshore wind generating station within the wind farm area comprising—
(a) subject to sub-paragraph (2), up to 300 wind turbine generators fixed to the seabed;
(b) a network of subsea intra-array electrical circuits connecting the structures comprised in Work No. 1A—
(i) with other such structures;
(ii) with any other structure located within the wind farm area; and
(iii) with the network of electrical circuits comprised in Work Nos. 1B, 2A and 2B;
(c) subject to sub-paragraph (3), up to 2 offshore accommodation platforms fixed to the seabed which may be connected to one of the offshore HVAC collector substations or offshore HVDC converter substations within Work No. 2A by an unsupported steel bridge and up to 2 electrical circuits each connecting an accommodation platform to either an offshore HVAC collector substation or to a wind turbine generator in order to power the accommodation platform;
Work No. 1B — An offshore wind generating station within the wind farm area comprising—
(a) subject to sub-paragraph (2), up to 300 wind turbine generators fixed to the seabed;
(b) a network of subsea intra-array electrical circuits connecting the structures comprised in Work No. 1B—
(i) with other such structures;
(ii) with any other structure located within the wind farm area; and
(iii) with the network of electrical circuits comprised in Work Nos. 1A, 2A and 2B;
(c) subject to sub-paragraph (3), up to 2 offshore accommodation platforms fixed to the seabed which may be connected to one of the offshore HVAC collector substations or offshore HVDC converter substations within Work No. 2B by an unsupported steel bridge and up to 2 electrical circuits each connecting an accommodation platform to either an offshore HVAC collector substation or to a wind turbine generator in order to power the accommodation platform.
Co-ordinates for wind farm area (limits of deviation for Work Nos. 1A, 1B, 2A and 2B)—
Point
Latitude
Longitude
1
54° 0′ 31.626″ N
1° 26′ 19.993″ E
2
54° 0′ 18.479″ N
1° 38′ 37.320″ E
3
54° 0′ 15.768″ N
1° 40′ 21.864″ E
4
53° 59′ 36.924″ N
2° 3′ 45.936″ E
5
53° 57′ 24.509″ N
2° 6′ 6.700″ E
6
53° 57′ 12.481″ N
2° 4′ 32.376″ E
7
53° 56′ 46.586″ N
2° 5′ 4.031″ E
8
53° 56′ 16.303″ N
2° 1′ 15.269″ E
9
53° 55′ 22.663″ N
2° 2′ 14.219″ E
10
53° 55′ 2.525″ N
1° 59′ 45.776″ E
11
53° 55′ 35.429″ N
1° 59′ 20.944″ E
12
53° 55′ 8.162″ N
1° 56′ 10.619″ E
13
53° 55′ 23.329″ N
1° 55′ 20.262″ E
14
53° 55′ 37.592″ N
1° 53′ 38.108″ E
15
53° 55′ 31.318″ N
1° 52′ 54.282″ E
16
53° 56′ 22.870″ N
1° 51′ 57.409″ E
17
53° 55′ 46.445″ N
1° 47′ 47.796″ E
18
53° 58′ 42.179″ N
1° 44′ 31.880″ E
19
53° 58′ 17.828″ N
1° 41′ 46.795″ E
20
53° 56′ 29.670″ N
1° 43′ 45.592″ E
21
53° 56′ 3.228″ N
1° 41′ 0.143″ E
22
53° 55′ 9.293″ N
1° 39′ 52.024″ E
23
53° 50′ 5.118″ N
1° 38′ 58.430″ E
24
53° 50′ 7.210″ N
1° 26′ 59.953″ E
(2) The combined total of wind turbine generators constructed within Work Nos. 1A and 1B must not exceed 300.
(3) The combined total of accommodation platforms constructed within Work Nos. 1A and 1B must not exceed 2.

---
Source: https://www.legislation.gov.uk/uksi/2016/844/schedule/1/part/1/paragraph/2 (the official version)
Page: https://openlegislation.uk/hornsea-two-offshore-wind-farm-order-2016/schedule-1/part-1/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.