# The Hornsea Two Offshore Wind Farm Order 2016, Paragraph 7: Force majeure

Extent: E+W+S

If, due to stress of weather or any other cause, the master of a vessel determines that it is necessary to deposit—
(a) authorised deposits outside of the wind farm area or disposal site reference HU211; or
(b) unauthorised deposits within or outside of the wind farm area or disposal site reference HU211,
because the safety of human life or of the vessel is threatened, full details of the circumstances of the deposit must be notified to the MMO within 48 hours.

---