(1) The power of the operator of the network to remove the apparatus is exercisable, despite the order, at any time not later than the end of the period of 3 months beginning with the day on which the right of way is extinguished.
(2) The power of the operator of the network to remove the whole or any part of the apparatus is exercisable after the end of that period if, before the end of the period, the operator has served notice on the HCA or strategic authority outside London of the operator's intention to remove the apparatus or (as the case may be) part.

---