# The Humber Sea Terminal (Phase III) Harbour Revision Order 2006, Article 5: Power to construct works


(1) The Company may, in the lines or situations and within the limits of deviation and according to the levels shown on the deposited sections, make and maintain the following works, in North Lincolnshire—
Work No. 1
A fixed jetty of open construction with bearing piles, breasting and mooring structures, access structures and a reinforced steel or concrete platform commencing at point TA 16813, 20401 and terminating at point TA 16943, 20234, and having an overall length of 211 metres and an overall width of 14 metres.
Work No. 2
A reinforced concrete or steel pontoon providing access to Work No. 1 with bearing/restraining piles and access ramps/stairways commencing at point TA 16746, 20373 and terminating at point TA 16843, 20449 and having an overall length of 123 metres and an overall width of 40 metres.
Work No. 3
An approach bridge and linkspan from the works constructed pursuant to the 1994 Order to Work No. 2 of open construction with bearing piles and a reinforced concrete and steel platform, commencing at point TA 16615, 20282 and terminating at point TA 16764, 20399 and having an overall length of 190 metres and an overall width of 22 metres.
(2) The Company may within the limits of deviation reconstruct, renew, alter, extend, enlarge, add to, replace or relay the works and may maintain the same as reconstructed, renewed, altered, extended, enlarged, added to, replaced or relaid.
(3) Notwithstanding any provision of the North Killingholme Pier Act 1912, the North Killingholme Admiralty Pier Act 1931 and the Killingholme Jetty Act 1963 the Company may break out and remove the existing timber jetty structure shown on the deposited plans.
(4) No part of the works shall involve the Company undertaking piling works between 1 November 2006 and 31 January 2007 or 15 October to 15 February inclusive in any subsequent year, unless the carrying out of such piling works between those dates has been approved in writing by the Secretary of State for Transport and English Nature.
(5) The works shall for all purposes form part of the undertaking of the Company.

---
Source: https://www.legislation.gov.uk/uksi/2006/2604/article/5 (the official version)
Page: https://openlegislation.uk/humber-sea-terminal-phase-iii-harbour-revision-order-2006/article-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.