In this Part of this Schedule—
“accumulation” means any accumulation of silt or other material which constitutes an impediment to navigation;
“construction” includes execution and placing, maintenance, extension, enlargement, alteration, replacement, relaying, and removal, and “construct” and “constructed” shall be construed accordingly;
“erosion” means any erosion of the bed or banks of the river or any jetty or other structure of whatever nature owned or occupied by A.B. Ports;
“plans” includes sections, descriptions, drawings and specifications.

---