# The HyNet Carbon Dioxide Pipeline Order 2024, Paragraph 82: Interpretation

Extent: E+W+S

(1) For the protection of the Canal & River Trust the following provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and the Canal & River Trust.
(2) In this Part of this Schedule—
“Code of Practice” means the Code of Practice for Works Affecting the Canal & River Trust (April 2022) or any updates or amendments thereto;
“construction”, in relation to any specified work or protective work, includes—
(a) the execution and placing of that work; and
(b) any relaying, renewal, or maintenance of that work and “construct” and “constructed” have corresponding meanings;
“Canal & River Trust’s network” means the Canal & River Trust’s network of waterways;
“detriment” means any damage to the waterway or any other property of the Canal & River Trust caused by the presence of the authorised development and, without prejudice to the generality of that meaning, includes—
(c) any material obstruction of, or interference with, or hindrance or danger to, navigation or to any use of the waterway (including towing paths);
(i) the erosion of the bed or banks of the waterway, or the impairment of the stability of any works, lands or premises forming part of the waterway;
(ii) the deposit of materials or the siltation of the waterway so as to damage the waterway;
(iii) the pollution of the waterway;
(iv) any significant alteration in the water level of the waterway, or significant interference with the supply of water thereto, or drainage of water therefrom;
(v) any harm to the ecology of the waterway (including any adverse impact on any site of special scientific interest comprised in the Canal & River Trust’s network); and
(vi) any material interference with the exercise by any person of rights over Canal & River Trust’s network;
“the engineer” means an engineer appointed by the Canal & River Trust for the purpose in question;
“plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction) and programmes;
“practical completion” means practical completion of all of the specified work notwithstanding that items which would ordinarily be considered snagging items remain outstanding, and the expression “practically complete” and “practically completed” is to be construed accordingly;
“protective work” means a work constructed under paragraph 86(3)(a);
“specified work” means so much of any authorised development as defined in article 2(1) of this Order that is situated upon, across, under, over or within 15 metres of, or may in any way affect the waterway;
“the waterway” means each and every part of the Shropshire Union Canal within the order limits, and any works, lands or premises belonging to the Canal & River Trust, or under its management or control, and held or used by the Canal & River Trust in connection with that canal in connection with its statutory functions.

---
Source: https://www.legislation.gov.uk/uksi/2024/436/schedule/10/paragraph/82 (the official version)
Page: https://openlegislation.uk/hynet-carbon-dioxide-pipeline-order-2024/schedule-10/paragraph-82
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.