# The HyNet Carbon Dioxide Pipeline Order 2024, Part 1: Public rights of way to be temporarily restricted

Extent: E+W+S

(1) Area
(2) Public right of way
(3) Extent of restriction (being closure to all use)
In the Borough of Cheshire West and Chester
123/FP3/1
Between the points marked 2-E and 2-F on sheet 2 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester
294/FP2/1 and 123/FPS/1
Between the points marked 4-H and 4-I, and 4-K and 4-J on sheet 4 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester
318/FP1/1
Between the points marked 5-G and 5-H on sheet 5 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester
309/FP1/2
Between the points marked 6-A and 6-B on sheet 6 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester
309/FP3/1 and 241/FP6/2
Between the points marked 6-C and 6-D on sheet 6 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester
211/FP4/1
Between the points marked 10-F and 10-G on sheet 10 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 308/1 and Footpath 307/3
Between the points marked 15-E and 15-F on sheet 15 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 308/1/10
Between the points marked 15-E and 15-G on sheet 15 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 308/4 and Footpath 303/44
Between the points marked 15-O and 15-P on sheet 15 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Chester Road
Between the points marked 16-AA and 16-DD on sheet 16 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 303/32
Between the points marked 16-F and 16-G on sheet 16 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 303/30
Between the points marked 17-AA and 17-BB on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 303/34
Between the points marked 17-G and 17-H on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 303/26
Between the points marked 17-J and 17-K on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 303/25
Between the points marked 17-M and 17-MM on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 303/22 and Footpath 303/24
Between the points marked 17-P and 17-Q on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 303/20
Between the points marked 18-I and 18-II on sheet 18 of the access and rights of way plans shown
In the County of Flintshire
Footpath 303/143 and Footpath 303/21
Between the points marked 18-J and 18-T, 18-K and 18-L on sheet 18 of the access and rights of way plans shown
In the County of Flintshire
Footpath 303/141
Between the points marked 18-M and 18-N on sheet 18 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 414/39
Between the points marked 19-DD and 19-E on sheet 19 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 414/4
Between the points marked 20-F and 20-FF on sheet 20 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 414/2
Between the points marked 20-P on sheet 20 and 21-AA on sheet 21 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 414/1
Between the points marked 21-A and 21-B on sheet 21 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 404/70
Between the points marked 22-A and 22-B on sheet 22 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 404/68
Between the points marked 22-B and 22-C on sheet 22 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 404/66
Between the points marked 22-I and 22-J on sheet 22 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire
Footpath 404/39
Between the points marked 25-I and 25-J on sheet 25 of the access and rights of way plans shown with a dashed orange

---
Source: https://www.legislation.gov.uk/uksi/2024/436/schedule/6/part/1 (the official version)