# The Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024

S.I. 2024/446 · made 27 March 2024

This Order amends the Immingham Open Cycle Gas Turbine Order 2020, a development consent order under the Planning Act 2008, following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change under paragraph 2 of Schedule 6 to the Planning Act 2008.

Made under: Planning Act 2008 (Schedule 6 paragraph 2)

PDFs: Printed copy https://openlegislation.uk/immingham-open-cycle-gas-turbine-amendment-no-2-order-2024/pdf/uksi_20240446_en.pdf

## Introductory text

Infrastructure Planning
Made 27th March 2024
Coming into force 28th March 2024
An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008, to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change to the Immingham Open Cycle Gas Turbine Order 2020.
The Secretary of State, having considered the application, the responses to the publicity and consultation required by regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make the changes on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
Accordingly, the Secretary of State, in exercise of the powers in paragraphs 2(1) and (9) of Schedule 6 to the Planning Act 2008, makes the following Order—

## 1 Citation and commencement

This Order may be cited as the Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024 and comes into force on 28th March 2024.

## 2 Amendment to the Immingham Open Cycle Gas Turbine Order 2020

The Immingham Open Cycle Gas Turbine Order 2020 is amended in accordance with this Order.

## 3 Amendment to Schedule 12 (design parameters)

For the table in Schedule 12, substitute—
“
Table 9
(1)
Building or structure
(2)
Maximum length (metres)
(3)
Maximum width (metres)
(4)
Maximum height (metres above 0 meters above ordnance datum)
(5)
Maximum diameter (metres)
Single gas turbine and generator
31
20
20
-
Gas turbine building
50
35
29
-
Exhaust stack
-
-
56
12
Air intakes
24
16
40
-
Fin-fan cooler
30
15
17
-
Control room, workshops, stores
35
20
16
-
Demineralised tank, firewater tank
-
-
32
24
”

## Signature

Signed by authority of the Secretary of State for Energy Security and Net Zero
David Wagstaff
Deputy Director – Energy Infrastructure Planning
Department for Energy Security and Net Zero
27th March 2024

## Explanatory note

(This note is not part of the Order)
This Order amends the Immingham Open Cycle Gas Turbine Order 2020, a development consent order under the Planning Act 2008, following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change under paragraph 2 of Schedule 6 to the Planning Act 2008.

---
Source: https://www.legislation.gov.uk/uksi/2024/446 (the official version)
Page: https://openlegislation.uk/immingham-open-cycle-gas-turbine-amendment-no-2-order-2024
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.