# The Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024, Article 3: Amendment to Schedule 12 (design parameters)


For the table in Schedule 12, substitute—
“
Table 9
(1)
Building or structure
(2)
Maximum length (metres)
(3)
Maximum width (metres)
(4)
Maximum height (metres above 0 meters above ordnance datum)
(5)
Maximum diameter (metres)
Single gas turbine and generator
31
20
20
-
Gas turbine building
50
35
29
-
Exhaust stack
-
-
56
12
Air intakes
24
16
40
-
Fin-fan cooler
30
15
17
-
Control room, workshops, stores
35
20
16
-
Demineralised tank, firewater tank
-
-
32
24
”

---