# The Immingham Open Cycle Gas Turbine Order 2020, Paragraph

Extent: E+W

Work No. 1 – OCGT power station, being an open cycle gas turbine generating station with a gross capacity of up to 299 megawatts, comprising—
(a) gas turbine and turbine hall buildings;
(b) electrical generator;
(c) stack;
(d) auxiliary cooling equipment or system;
(e) gas turbine air intake filters;
(f) banks of finfan coolers;
(g) nitrogen oxide emissions control equipment;
(h) transformers;
(i) a switchyard, associated switch gear and ancillary equipment;
(j) a gas receiving area, gas control facilities and gas reception building;
(k) lubricating oil, hydraulic oil and chemical storage tanks and equipment;
(l) continuous emissions monitoring system;
(m) raw water and fire water storage tanks;
(n) water treatment facilities, demineralised water treatment works, including storage tanks;
(o) oily water and waste water treatment plant building and basin;
(p) fire fighting equipment, buildings and distribution pipework;
(q) permanent plant laydown area;
(r) auxiliary plant, buildings, enclosures and structures;
(s) mechanical, electrical, gas, telecommunications and water networks, pipework, cables, racks, infrastructure, instrumentation and utilities, including connections between parts of this Work No. 1 and Work Nos 4, 5 and 6;
(t) workshop buildings and stores;
(u) electrical, control, administration and welfare buildings; ...
(v) storm water attenuation system; and
(w) synchronous condenser.

---
Source: https://www.legislation.gov.uk/uksi/2020/847/schedule/1/paragraph/wrapper3n1 (the official version)