# The Immingham Open Cycle Gas Turbine Order 2020, Schedule 12: DESIGN PARAMETERS

Extent: E+W

Table 9
(1)
Building or structure
(2)
Maximum length (metres)
(3)
Maximum width (metres)
(4)
Maximum height (metres above 0 meters above ordnance datum)
(5)
Maximum diameter (metres)
Single gas turbine and generator
31
20
20
-
Gas turbine building
50
35
29
-
Exhaust stack
-
-
56
12
Air intakes
24
16
40
-
Fin-fan cooler
30
15
17
-
Control room, workshops, stores
35
20
16
-
Demineralised tank, firewater tank
-
-
32
24

---
Source: https://www.legislation.gov.uk/uksi/2020/847/schedule/12 (the official version)
Page: https://openlegislation.uk/immingham-open-cycle-gas-turbine-order-2020/schedule-12
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

