# The Infrastructure Consent (Miscellaneous Provisions) (Wales) Regulations 2025, Paragraph 19


The alteration of a dam or reservoir in Wales where the additional volume of water to be held back by the dam or stored in the reservoir as a result of the alteration is expected to exceed 1 million cubic metres but not to exceed 10 million cubic metres.

---
Source: https://www.legislation.gov.uk/wsi/2025/887/schedule/1/paragraph/19 (the official version)
Page: https://openlegislation.uk/infrastructure-consent-miscellaneous-provisions-wales-regulations-2025/schedule-1/paragraph-19
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.