The extension or alteration of a solar generating station in Wales or the Welsh marine area where—
(a) the effect of the extension or alteration is expected to increase the installed generation capacity by more than 35 megawatts but less than 50 megawatts, and
(b) the effect of the extension or alteration is not expected to increase the total installed capacity to more than 350 megawatts.

---