# The Infrastructure Consent (Miscellaneous Provisions) (Wales) Regulations 2025, Paragraph 5


The construction of a generating station (other than a solar generating station or wind generating station) in Wales or the Welsh marine area that is expected to have an installed generating capacity of less than 50 megawatts.

---