# The Infrastructure Consent (Miscellaneous Provisions) (Wales) Regulations 2025, Paragraph 6


The extension or alteration of a generating station (other than a solar generating station or wind generating station) in Wales or the Welsh marine area, where—
(a) the effect of the extension or alteration is expected to increase the installed generating capacity by less than 50 megawatts, and
(b) the effect of the extension or alteration is not expected to increase the total installed capacity to more than 350 megawatts.

---