# The Infrastructure Consent (Pre-Application and Application Procedure and Transitional Provisions) (Wales) Regulations 2025, Introduction: Introductory text

Extent: E+W

Infrastructure Planning, Wales
Made 16 June 2025
Laid before Senedd Cymru 17 June 2025
Coming into force 15 December 2025
The Welsh Ministers, in exercise of the powers conferred on them by sections 29(1)(h), (2), (3) and (5), 30(2) and (3), 32(4) and (5), 34(2)(c), (3) and (5), 35(1)(a), 36(4)(b), 37(4)(b), 60(2)(d), (4)(d) and (6), 62(3)(d), 129(3)(a) and (4), 132(2), 140(1) and (2), 141(2) and 144 of the Infrastructure (Wales) Act 2024, make the following Regulations.

---
Source: https://www.legislation.gov.uk/wsi/2025/690/introduction (the official version)
Page: https://openlegislation.uk/infrastructure-consent-pre-application-and-application-procedure-and-transitional-provisions-wales-regulations-2025/introduction
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.